# Andhra Pradesh data centre policy 4.0 (2024-29): incentives and mega projects

> Andhra Pradesh data centre policy 4.0 (2024-29): SGST refund or a 10% capital subsidy; four projects cleared in 2026 with ₹2.83 lakh crore of proposed investment.

URL: https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy  
Published: 2026-11-21 · Publisher: Invariant · Region: Andhra Pradesh, India

Andhra Pradesh’s Data Center Policy (4.0) 2024-29, notified through G.O.Ms.No.6 on 14 November 2024, offers data centres a choice between 100% net SGST reimbursement on capital goods and a 10% capital subsidy on plant and machinery. Both come with 100% stamp duty exemption on first sale and industrial power tariff. Projects above 50 MW, or above ₹5,000 crore of fixed capital investment in plant and equipment, can get tailor-made incentives case by case. In 2026 the state issued orders for four projects under the policy with ₹2,83,340 crore of proposed investment. The policy runs for five years from notification, or until a new policy is announced, whichever is later.

## Key points

- Andhra Pradesh’s Data Center Policy 4.0 (G.O.Ms.No.6, 14 November 2024) offers 100% net SGST reimbursement on capital goods or a 10% capital subsidy on plant and machinery.
- Under G.O.Ms.No.6, projects above 50 MW or ₹5,000 crore of fixed capital investment in plant and equipment can get tailor-made incentives case by case.
- Andhra Pradesh issued government orders in 2026 for four data centre projects under the policy, with ₹2,83,340 crore of proposed investment.
- The August 2026 order for ReNew’s 1,000 MW project in Anakapalli (G.O.Ms.No.55) caps its fiscal incentives at a combined ₹14,405 crore.
- Crisil estimates Visakhapatnam data centre capacity could equal about 80% of the city’s current peak power demand by fiscal 2030.

## Andhra Pradesh Data Center Policy 4.0: key facts

| Item | Detail (checked 21 November 2026) |
| --- | --- |
| Policy | Andhra Pradesh Data Center Policy (4.0) 2024-29, G.O.Ms.No.6, ITE&C (Promotion Wing) Department |
| Notified | 14 November 2024 |
| Validity | 5 years from notification, or until a new policy is announced, whichever is later |
| Target | 200 MW of additional capacity (G.O.); the annexed policy says a few hundred MW, up to 1 GW |
| Standard incentives | 100% net SGST reimbursement on capital goods or 10% capital subsidy on plant and machinery; 100% stamp duty exemption on first sale; industrial tariff |
| Mega projects | More than 50 MW, or more than ₹5,000 crore of fixed capital investment in plant and equipment: tailor-made incentives case by case |
| 2026 approvals | Four projects, ₹2,83,340 crore of proposed investment |

Sources: ([Government of Andhra Pradesh (copy hosted by APIIC)](https://apiic.in/wp-content/themes/custom-theme/assets/Pdfs/2024ITC_33902_MS6.pdf)) ([Government of Andhra Pradesh, ITE&C Department (copy published by MediaNama)](https://www.medianama.com/wp-content/uploads/2026/08/reliance_merged.pdf))

## Data centre projects Andhra Pradesh cleared in 2026

Andhra Pradesh issued government orders citing the Data Center Policy 4.0 for four projects in 2026. Three were issued in August 2026; Reliance’s land allotment was ordered in May 2026 and amended in July 2026. ([Government of Andhra Pradesh, ITE&C Department (copy published by MediaNama)](https://www.medianama.com/wp-content/uploads/2026/08/reliance_merged.pdf)) ([MediaNama](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/))

| Project | Location | Size and investment | Terms in the government order |
| --- | --- | --- | --- |
| ReNew AP Green Data Center | Makavaripalem, Anakapalli district | 1,000 MW; ₹85,200 crore | G.O.Ms.No.55, 21 August 2026: 10% capital subsidy on machinery and equipment (cap ₹3,700 crore), ₹1 per unit power discount for 15 years, fiscal caps totalling ₹14,405 crore |
| Data Centre Holdings India LLP | Jagnadhapuram, Visakhapatnam district | 486 MW; ₹58,743 crore | G.O.Ms.No.56, 21 August 2026: 25% discount on APIIC land cost (cap ₹30 crore), ₹1 per unit power discount for 15 years |
| AM AI Factory (Vizag) | Amanam, Visakhapatnam district | 512 MW; ₹31,387 crore | G.O.Ms.No.59, 22 August 2026: 20 years of exemption from transmission and wheeling charges, electricity duty and cross-subsidy surcharge, each capped |
| Reliance Industries | Vizianagaram district | Giga-scale AI data centre; ₹1,08,010 crore | Land at a 25% discounted rate (G.O.Ms.No.30, May 2026, amended by G.O.Ms.No.52, July 2026) |

Sources: ([Government of Andhra Pradesh, ITE&C Department (copy published by MediaNama)](https://www.medianama.com/wp-content/uploads/2026/08/reliance_merged.pdf))

## Power supply for data centres in Visakhapatnam

Crisil estimates that data centre capacity in Visakhapatnam could equal about 80% of the city’s current peak power demand by fiscal 2030. For any campus there, the transmission plan matters more than the incentive schedule. ([DD India](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/))

Google announced its first India AI hub in Visakhapatnam in October 2025, an investment of about USD 15 billion over 2026 to 2030, working with AdaniConneX and Airtel. ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/))

**Read next:** [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india)

For a site in Andhra Pradesh, Invariant checks how it gets power and the evidence behind that path (the distribution or transmission connection, the open access route, the nearest substations), screens seismic zone, flood history, groundwater status and airport height limits, and maps the central and state approvals the project needs, with the authority behind each one.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### What is the Andhra Pradesh data centre policy 4.0?

It is the state’s Data Center Policy (4.0) 2024-29, notified through G.O.Ms.No.6 on 14 November 2024. It is valid for five years from notification or until a new policy is announced, whichever is later. ([Government of Andhra Pradesh (copy hosted by APIIC)](https://apiic.in/wp-content/themes/custom-theme/assets/Pdfs/2024ITC_33902_MS6.pdf))

### What incentives does the Andhra Pradesh data centre policy give?

Andhra Pradesh offers a choice between 100% net SGST reimbursement on capital goods and a 10% capital subsidy on plant and machinery. Both come with 100% stamp duty exemption on first sale and industrial power tariff. Incentives are extended under operational guidelines notified separately. ([Government of Andhra Pradesh (copy hosted by APIIC)](https://apiic.in/wp-content/themes/custom-theme/assets/Pdfs/2024ITC_33902_MS6.pdf))

### What counts as a mega data centre project in Andhra Pradesh?

A project of more than 50 MW, or more than ₹5,000 crore of fixed capital investment in plant and equipment. It can get tailor-made incentives case by case. ([Government of Andhra Pradesh (copy hosted by APIIC)](https://apiic.in/wp-content/themes/custom-theme/assets/Pdfs/2024ITC_33902_MS6.pdf))

### Which data center projects did Andhra Pradesh approve in 2026?

Andhra Pradesh issued orders for four projects with ₹2,83,340 crore of proposed investment in total. They are ReNew (1,000 MW, Anakapalli), Data Centre Holdings India LLP (486 MW, Visakhapatnam), AM AI Factory (512 MW, Visakhapatnam) and a Reliance giga-scale AI data centre in Vizianagaram. ([Government of Andhra Pradesh, ITE&C Department (copy published by MediaNama)](https://www.medianama.com/wp-content/uploads/2026/08/reliance_merged.pdf))

### How big is Google’s investment in Visakhapatnam?

Google says it will invest about USD 15 billion over 2026 to 2030 in its first India AI hub, in Visakhapatnam. ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/))

### Is there enough power for data centres in Visakhapatnam?

Power is the main open question for Visakhapatnam. Crisil estimates data centre capacity there could equal about 80% of the city’s current peak demand by fiscal 2030. ([DD India](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/))

## Sources

- Government of Andhra Pradesh (copy hosted by APIIC): [Andhra Pradesh Data Center Policy (4.0) 2024-29, G.O.Ms.No.6, ITE&C (Promotion Wing) Department, 14 November 2024](https://apiic.in/wp-content/themes/custom-theme/assets/Pdfs/2024ITC_33902_MS6.pdf)
- Government of Andhra Pradesh, ITE&C Department (copy published by MediaNama): [Andhra Pradesh ITE&C G.O.Ms.No.52, 55, 56 and 59 of 2026 on data centre projects (combined copy)](https://www.medianama.com/wp-content/uploads/2026/08/reliance_merged.pdf)
- MediaNama: [Andhra Pradesh clears AI data centre projects](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/)
- Google: [Our first AI hub in India, powered by a $15 billion investment](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)
- DD India: [India's data centre capacity set for 5x surge by 2030 (Crisil Ratings)](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/)

## Related

- [Data centre policy in India: state data centre policies compared (2026)](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison)
- [Data centres in Visakhapatnam: Google’s AI hub, gigawatt campuses and risks (2026)](https://invariant-ai.com/blog/data-centres-in-visakhapatnam)
- [AI data centres in India: gigawatt campuses, IndiaAI GPUs and power (2026)](https://invariant-ai.com/blog/ai-data-centres-india)
- [Telangana data centre policy: the 2016 policy, incentives and Hyderabad (2026)](https://invariant-ai.com/blog/telangana-data-centre-policy)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)