  "name": "California EV charger field test reliability metrics",
  "description": "California Energy Commission staff results for operational status, successful charge attempts, accessibility and initial-payment failures. Keeps the field-test scope separate from the federal per-port uptime calculation.",
  "date_published": "2026-11-26",
  "source": {
    "publisher": "California Energy Commission",
    "publication_number": "CEC-600-2026-034",
    "publication_month": "2026-11",
    "publication_url": "https://www.energy.ca.gov/publications/2026/results-field-tests-californias-electric-vehicle-charging-network-conducted",
    "pdf_url": "https://www.energy.ca.gov/sites/default/files/2026-11/CEC-600-2026-034.pdf",
    "pdf_sha256": "41fc947b91ff38f251f88ee2ec80f9b1041368a4d1882668d2a746ca5e6f7db9",
    "printed_pages": [
      3,
      5,
      6,
      11
    ],
    "pdf_pages_one_based": [
      9,
      11,
      12,
      17
    ]
  },
  "measurement_window": {
    "start_month": "2024-01",
    "end_month": "2026-02"
  },
  "metrics_by_charger_type": [
    {
      "charger_type": "Level 2",
      "ports_access_attempted": 10027,
      "ports_accessed": 8452,
      "ports_plug_in_tested": 1817,
      "additional_ports_observed": 6635,
      "operational_rate_pct": 96.2,
      "successful_charge_attempt_rate_pct": 93.1
    },
    {
      "charger_type": "DC fast charging",
      "ports_access_attempted": 8320,
      "ports_accessed": 7705,
      "ports_plug_in_tested": 1754,
      "additional_ports_observed": 5951,
      "operational_rate_pct": 96.4,
      "successful_charge_attempt_rate_pct": 94.0
    }
  ],
  "method": {
    "access": "Exclude ports that could not be accessed from the operational and successful charge metrics.",
    "operational_rate": "Point-in-time result from plug-in tests and observations, with weighting described on printed page 6.",
    "successful_charge_attempt_rate": "Successful charges among operational ports in the plug-in tests. The test protocol allowed alternative payment options after an unsuccessful method."
  },
  "initial_payment_attempt_failure_pct": {
    "all_assigned_methods": 17.7,
    "credit_or_debit_card": 34.4,
    "plug_in_payment": 2.3,
    "other": 14.0
  },
  "federal_uptime": {
    "source": "https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-680/section-680.116",
    "section": "680.116(b)",
    "applies_to": "Ports covered by the federal rule",
    "threshold_pct": 97,
    "comparison": "greater_than",
    "measurement": "prior 12 months, calculated monthly using qualifying outage exclusions"
  }
}