# Commercial Property Replacement Cost by Address

> Look up commercial building replacement cost by address. Compare modeled values with city records, and see what a documented Florida rebuild tells an underwriter.

URL: https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address  
Published: 2026-11-24 · Updated: 2026-11-25 · Publisher: Invariant · Region: United States

Start with the building you intend to insure, then check which kind of value the source returns. The U.S. Army Corps of Engineers publishes two modeled costs for structures in its 2026 National Structure Inventory. A city assessment measures the property for taxation. A carrier uses its accepted reconstruction valuation and policy terms to determine coverage. At 32 Old Slip in Manhattan, those public sources put four different figures beside the same street address.

Browse [Property underwriting](https://invariant-ai.com/blog/property-underwriting) for related guides.

## Key points

- Use the 2026 National Structure Inventory for an initial comparison of full and depreciated reconstruction costs. Both estimates use approximately August 2025 prices.
- Match the federal points to the intended building. At 32 Old Slip, seven occupancy records share one location and footprint ID. Keeping only the largest row would omit about $28.8 million from the published model’s full replacement total.
- Check the estimator’s floor area, occupancy, construction and valuation date before relying on it. For underwriting, resolve discrepancies against the insured schedule, building records and the carrier’s accepted estimate.
- Use an actual rebuild to check which costs the estimate covers. Verify insurance limits and valuation terms in the policy documents.

## [Which value are you looking for?](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#which-replacement-cost>)

| Value on the report | What it measures | Where to start |
| --- | --- | --- |
| Full modeled replacement cost | Estimated cost to reconstruct a comparable new structure. The NSI model excludes land. | Use fullrep in the 2026 NSI for an initial comparison. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>)) |
| Depreciated modeled replacement cost | The NSI structure estimate after its depreciation adjustment. | Use val_struct for that model’s depreciated value. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) |
| Tax market value and actual assessment | The local authority’s property valuation and the amount assigned under its assessment rules. In NYC, Class 4 market value is based on income potential and expenses. | Use the final assessment roll and preserve the tax year and lot ID. ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-market-value.page>)) ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-assessed-value.page>)) |
| Insurance replacement cost | An estimate to replace covered property with property of comparable kind and quality. Coverage depends on the policy’s scope and limits. | Confirm the building and scope with the insurer’s accepted estimator or valuation. ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>)) |

Start with the valuation date and what the number includes. A policy’s treatment of actual cash value follows its terms and applicable rules. Keep that policy measure separate from the depreciated figure in the federal model. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

## [What the records show for 32 Old Slip](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#32-old-slip>)

NYC Geosearch identifies the address as building 1000867 on tax lot 1000350001. The final tax roll calls the lot 77 Front Street. The city’s footprint query returns one polygon for the building ID. Both the city’s address point and the seven selected federal records fall inside it. Eight other federal records in the surrounding query fall outside the footprint. ([NYC Department of City Planning](<https://geosearch.planninglabs.nyc/v2/search?text=32+Old+Slip%2C+Manhattan&size=3>)) ([NYC Office of Technology and Innovation](<https://services2.arcgis.com/IsDCghZ73NgoYoz5/ArcGIS/rest/services/NYC_Building_Footprint/FeatureServer/0/query?where=BIN%3D1000867&outFields=BIN%2CBASE_BBL%2CMPLUTO_BBL%2CDOITT_ID&returnGeometry=true&outSR=4326&f=json>)) ([NYC Department of Finance](<https://data.cityofnewyork.us/resource/8y4t-faws.json?%24where=parid%3D%271000350001%27+AND+year%3D%272027%27&%24select=parid%2Cyear%2Crectype%2Cperiod%2Cstreet_name%2Chousenum_lo%2Cfintaxclass%2Cfinmkttot%2Cfinacttot%2Cfintrntot%2Cfintxbtot>)) ([U.S. Army Corps of Engineers](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>))

| Record | Reported or calculated amount | What it covers |
| --- | --- | --- |
| NSI full model, sum of fullrep | $331.97 million | Seven occupancy rows at one matched footprint. ([U.S. Army Corps of Engineers](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) |
| NSI depreciated model, sum of val_struct | $276.05 million | The same occupancy rows after modeled depreciation. ([U.S. Army Corps of Engineers](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) |
| NYC FY2027 tax market value | $283.52 million | Final roll value for the entire tax lot. ([NYC Department of Finance](<https://data.cityofnewyork.us/resource/8y4t-faws.json?%24where=parid%3D%271000350001%27+AND+year%3D%272027%27&%24select=parid%2Cyear%2Crectype%2Cperiod%2Cstreet_name%2Chousenum_lo%2Cfintaxclass%2Cfinmkttot%2Cfinacttot%2Cfintrntot%2Cfintxbtot>)) ([NYC Department of Finance](<https://data.cityofnewyork.us/api/views/8y4t-faws/files/2e925830-8a86-453a-9072-1e6045ed92a4>)) ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-market-value.page>)) |
| NYC FY2027 actual assessed value | $127.58 million | Actual assessment at 45% of the city’s tax market value. ([NYC Department of Finance](<https://data.cityofnewyork.us/resource/8y4t-faws.json?%24where=parid%3D%271000350001%27+AND+year%3D%272027%27&%24select=parid%2Cyear%2Crectype%2Cperiod%2Cstreet_name%2Chousenum_lo%2Cfintaxclass%2Cfinmkttot%2Cfinacttot%2Cfintrntot%2Cfintxbtot>)) ([NYC Department of Finance](<https://data.cityofnewyork.us/api/views/8y4t-faws/files/2e925830-8a86-453a-9072-1e6045ed92a4>)) ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-assessed-value.page>)) |

The largest NSI row, professional and technical services, accounts for $303.17 million of the full modeled total. Six other rows at the same point account for the remaining $28.81 million. The Corps uses shared footprint IDs for stacked occupancy records. Preserve the rows during review and use the footprint ID to count the modeled building once. ([U.S. Army Corps of Engineers](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>))

The seven inventory rows total 1,256,816 square feet. PLUTO 26v3 reports 973,587 square feet of building area on this one-building tax lot. That is a 29% difference relative to PLUTO. The public records do not establish which area definition applies to a given policy. Ask for the insured floor area, occupancy split and recent renovations before estimating reconstruction cost. ([U.S. Army Corps of Engineers](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>)) ([NYC Department of City Planning](<https://data.cityofnewyork.us/resource/64uk-42ks.json?bbl=1000350001>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

[Download the seven matched records and FY2027 assessment (JSON)](https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address.json)

[Download citation (CSL JSON)](https://invariant-ai.com/citations/commercial-property-replacement-cost-by-address.dataset.csl.json)

[Review the property underwriting workflow](https://invariant-ai.com/blog/commercial-property-insurance-data-apis)

## [Can a construction contract establish replacement cost for insurance?](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#sanibel-reconstruction-cost>)

A rebuild contract establishes the price for a defined scope at a given date. For insurance, use that scope to check the carrier’s reconstruction estimate. At 5171 Sanibel Captiva Road in Florida, the district rebuilt Fire Station 172 after Hurricane Ian. Its signed resolutions and audited financial statements give underwriters several different records to reconcile at one address. ([Contract and contingency authorization](<https://www.sanibelfire.com/files/34e87b7ca/RESOLUTION%2B24-010_SIGNED.pdf>)) ([Spending, estimate and occupancy milestones](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)) ([Flood insurance authorization](<https://www.sanibelfire.com/files/9b51dbb92/RESOLUTION%2B25-025_SIGNED.pdf>))

| Record | What the district reported | How to use it |
| --- | --- | --- |
| Contract authorization, March 13, 2024 | $7,439,017.49 for the construction contract, with up to $500,000 separately authorized for contingencies. | Keep the authorization and contingency ceiling separate. Request the executed scope and change orders. ([Contract and contingency authorization](<https://www.sanibelfire.com/files/34e87b7ca/RESOLUTION%2B24-010_SIGNED.pdf>)) |
| Construction spending at September 30, 2025 | $8,249,324 spent on construction. The audit separately estimated total construction costs at approximately $8.5 million. | Record the spending cutoff and keep the estimate marked as provisional. Request a cost breakdown before comparing the amounts. ([Spending, estimate and occupancy milestones](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)) |
| Flood insurance authorization, December 10, 2025 | The board authorized the chief to obtain flood insurance. The resolution records a quoted annual premium of $11,500. | Log the quote and authorization as separate records. Verify the issued policy, building limit, deductible and dates. ([Flood insurance authorization](<https://www.sanibelfire.com/files/9b51dbb92/RESOLUTION%2B25-025_SIGNED.pdf>)) |
| Permanent certificate of occupancy, February 13, 2026 | The district reported substantial completion in November 2025 and receipt of the permanent certificate in February 2026. | Use both milestones to date the building record and ask for the final closeout costs separately. ([Spending, estimate and occupancy milestones](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)) |

To use this kind of evidence in a renewal, match the building on the statement of values to the project address and scope. Ask which costs belong to the insured building and which cover site work, contents, temporary operations or design. Then use the insurer’s accepted estimate and check the issued policy’s limits and treatment of debris removal and code upgrades. The records cited here leave final audited project cost and bound flood terms unconfirmed. ([Contract and contingency authorization](<https://www.sanibelfire.com/files/34e87b7ca/RESOLUTION%2B24-010_SIGNED.pdf>)) ([Spending, estimate and occupancy milestones](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)) ([Flood insurance authorization](<https://www.sanibelfire.com/files/9b51dbb92/RESOLUTION%2B25-025_SIGNED.pdf>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

[Download the Sanibel contract, spending and flood authorization records (JSON)](https://invariant-ai.com/blog/sanibel-fire-station-172-reconstruction-cost.json)

[Download citation (CSL JSON)](https://invariant-ai.com/citations/commercial-property-replacement-cost-by-address.dataset-sanibel-reconstruction-cost.csl.json)

**Continue the renewal review:** [Reconcile building and contents values before renewal](https://invariant-ai.com/blog/commercial-property-statement-of-values) · [Check the FEMA flood map effective on a past date](https://invariant-ai.com/blog/fema-flood-zone-history-for-underwriting)

## [Where to pull replacement cost and building evidence](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#choose-a-source>)

| Source | Where it fits | What to test |
| --- | --- | --- |
| Invariant Earth | Match the provided address to a building and parcel. Retrieve documented footprint and assessor fields with their sources. | Test two buildings on one parcel and review the intended structure, date and source of each returned value. ([Invariant Earth](<https://docs.invariant-ai.com/verify-building-by-address>)) |
| USACE National Structure Inventory | Pull public GeoJSON for a small area or use published geographic extracts for initial portfolio screening. | Check for several rows per footprint and keep full and depreciated amounts in separate fields. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/api-reference-guide>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>)) |
| Verisk 360Value | Use its commercial reconstruction estimator when a carrier or underwriting workflow accepts it. | Check which inputs come prefilled and which components, pricing date and local costs the output records. ([Verisk](<https://www.verisk.com/49173a/siteassets/media/downloads/underwriting/360value/360value-for-commercial-property.pdf>)) |
| Cotality commercial valuation data | Use square-foot, component or unit cost methods when the required detail and available inputs support them. | Confirm the occupancy, construction and area basis and how the method handles mixed uses or unusual equipment. ([Cotality](<https://www.cotality.com/resources/commercial-real-estate-overview>)) |

A repeatable workflow starts with the address and building match in Invariant Earth. Keep the parcel’s assessed values alongside the building attributes and send the verified building inputs to the estimator your team accepts. Save the estimator’s output and its assumptions with the same building identifier. ([Invariant Earth](<https://docs.invariant-ai.com/verify-building-by-address>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

## [What to confirm before using the number](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#before-using-a-value>)

- Confirm the specific structures on the property schedule, including accessory structures and shared systems where applicable.
- Reconcile floor area and occupancy with current building plans, the schedule or an inspection. Check construction, renovations and specialized systems.
- Record the pricing date and confirm how the estimate treats demolition, debris removal, code upgrades, building equipment and contents. Verify the applicable policy terms and limits.
- Retain the original source, field definition and building identifier. Route material differences for review while preserving both source values.

Sources: ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>)) ([Invariant Earth](<https://docs.invariant-ai.com/verify-building-by-address>)) ([Verisk](<https://www.verisk.com/49173a/siteassets/media/downloads/underwriting/360value/360value-for-commercial-property.pdf>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>))

**Check the rest of the property record:** [Compare commercial property data APIs for underwriting](https://invariant-ai.com/blog/commercial-property-insurance-data-apis) · [Read actual, transitional and taxable assessments by address](https://invariant-ai.com/blog/commercial-property-tax-assessment-history-by-address) · [Trace 32 Old Slip’s sale and lease records](https://invariant-ai.com/blog/commercial-real-estate-sales-lease-comps-apis) · [Check footprint and parcel identity across providers](https://invariant-ai.com/blog/building-footprint-data-apis) · [Cross-check reported floor area in NYC energy filings](https://invariant-ai.com/blog/building-energy-benchmarking-data-by-address)

## [Questions](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#questions>)

### Can I look up commercial building replacement cost by address?

Use an address match to locate the intended footprint, then query the 2026 NSI for a public screening estimate. For an underwriting valuation, verify the building attributes and use the estimator or appraisal process accepted by the carrier. ([Invariant Earth](<https://docs.invariant-ai.com/verify-building-by-address>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/api-reference-guide>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

### What is the difference between fullrep and val_struct in the 2026 NSI?

Fullrep is the modeled cost to build a comparable new structure. Val_struct is the modeled structural value after depreciation. The published values use approximately August 2025 prices. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>))

### How do I handle multiple NSI rows at the same building?

Check the shared footprint identifier and occupancy codes. The Corps sometimes models several uses as separate records at one footprint. Count the footprint once for building counts and preserve the individual occupancy records when reviewing the model’s total. ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)) ([U.S. Army Corps of Engineers](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>))

### Can tax assessed value be used as building replacement cost?

Use the assessment for the tax decision it describes. For reconstruction, verify the insured building and get a current estimate using the applicable construction costs and coverage scope. For example, NYC’s Class 4 assessment applies a tax ratio to a market value based on income potential and expenses. ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-market-value.page>)) ([NYC Department of Finance](<https://www.nyc.gov/site/finance/property/property-determining-your-assessed-value.page>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

### Can a construction contract or permit value establish a building insurance limit?

Use its dated scope to check a reconstruction estimate. The contract or permit covers the work described in the record. Confirm the carrier’s valuation and the issued policy’s building limit, endorsements and deductible separately. ([Contract and contingency authorization](<https://www.sanibelfire.com/files/34e87b7ca/RESOLUTION%2B24-010_SIGNED.pdf>)) ([Spending, estimate and occupancy milestones](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)) ([Flood insurance authorization](<https://www.sanibelfire.com/files/9b51dbb92/RESOLUTION%2B25-025_SIGNED.pdf>)) ([California Department of Insurance](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>))

## [Sources](<https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#sources>)

- NYC Department of City Planning: [NYC Geosearch address match for 32 Old Slip](<https://geosearch.planninglabs.nyc/v2/search?text=32+Old+Slip%2C+Manhattan&size=3>)
- NYC Office of Technology and Innovation: [Official building footprint query for BIN 1000867](<https://services2.arcgis.com/IsDCghZ73NgoYoz5/ArcGIS/rest/services/NYC_Building_Footprint/FeatureServer/0/query?where=BIN%3D1000867&outFields=BIN%2CBASE_BBL%2CMPLUTO_BBL%2CDOITT_ID&returnGeometry=true&outSR=4326&f=json>)
- NYC Department of City Planning: [PLUTO 26v3 tax lot query for BBL 1000350001](<https://data.cityofnewyork.us/resource/64uk-42ks.json?bbl=1000350001>)
- NYC Department of Finance: [FY2027 Department of Finance rows for BBL 1000350001](<https://data.cityofnewyork.us/resource/8y4t-faws.json?%24where=parid%3D%271000350001%27+AND+year%3D%272027%27&%24select=parid%2Cyear%2Crectype%2Cperiod%2Cstreet_name%2Chousenum_lo%2Cfintaxclass%2Cfinmkttot%2Cfinacttot%2Cfintrntot%2Cfintxbtot>)
- NYC Department of Finance: [Assessment data dictionary and roll period codes](<https://data.cityofnewyork.us/api/views/8y4t-faws/files/2e925830-8a86-453a-9072-1e6045ed92a4>)
- NYC Department of Finance: [How NYC values commercial property for tax](<https://www.nyc.gov/site/finance/property/property-determining-your-market-value.page>)
- NYC Department of Finance: [NYC property tax assessment ratios](<https://www.nyc.gov/site/finance/property/property-determining-your-assessed-value.page>)
- U.S. Army Corps of Engineers: [NSI public structures query around 32 Old Slip](<https://nsi.sec.usace.army.mil/nsiapi/structures?bbox=-74.00835,40.70329,-74.007,40.70329,-74.007,40.7043,-74.00835,40.7043,-74.00835,40.70329&fmt=fc>)
- U.S. Army Corps of Engineers: [National Structure Inventory 2026 API reference](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/api-reference-guide>)
- U.S. Army Corps of Engineers: [NSI 2026 technical documentation for structural values and occupancy types](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/technical-documentation>)
- U.S. Army Corps of Engineers: [NSI 2026 usage guidance on stacked records, price levels and building precision](<https://www.hec.usace.army.mil/confluence/nsi/technicalreferences/2026/frequently-asked-questions>)
- California Department of Insurance: [Commercial insurance coverage and replacement cost valuation](<https://www.insurance.ca.gov/01-consumers/105-type/95-guides/09-comm/commercialguide.cfm>)
- Invariant Earth: [Verify a commercial building by address with Invariant Earth](<https://docs.invariant-ai.com/verify-building-by-address>)
- Verisk: [Verisk 360Value for commercial property replacement cost](<https://www.verisk.com/49173a/siteassets/media/downloads/underwriting/360value/360value-for-commercial-property.pdf>)
- Cotality: [Commercial reconstruction cost data and methods](<https://www.cotality.com/resources/commercial-real-estate-overview>)
- Sanibel Fire & Rescue District: [Resolution 24-010, signed March 13, 2024](<https://www.sanibelfire.com/files/34e87b7ca/RESOLUTION%2B24-010_SIGNED.pdf>)
- Sanibel Fire & Rescue District: [Audited FY2025 financial statements, Note L, pages 54 and 55](<https://www.sanibelfire.com/files/3a0252463/2025%2Bsanibel%2Bfire%2Brescue%2Bdistrict.pdf>)
- Sanibel Fire & Rescue District: [Resolution 25-025, signed December 10, 2025](<https://www.sanibelfire.com/files/9b51dbb92/RESOLUTION%2B25-025_SIGNED.pdf>)

## Related

- [Best commercial property data APIs for insurance underwriting](https://invariant-ai.com/blog/commercial-property-insurance-data-apis)
- [Commercial Property Tax Assessment History by Address](https://invariant-ai.com/blog/commercial-property-tax-assessment-history-by-address)
- [Commercial Real Estate Sales and Lease Comps APIs](https://invariant-ai.com/blog/commercial-real-estate-sales-lease-comps-apis)
- [Building Footprint Data APIs and Open Datasets](https://invariant-ai.com/blog/building-footprint-data-apis)
