# Data centre land in India: acres per MW, land prices and powered land (2026)

> Data centre land in India costs ₹3 to 60 crore per acre and about half an acre per MW on Anarock’s 2026 bands. Recent deals, parks, FAR rules and powered land.

URL: https://invariant-ai.com/blog/data-centre-land-india  
Published: 2026-11-21 · Publisher: Invariant · Region: India

A data centre in India needs roughly half an acre of land per MW of IT load, on our calculation from Anarock’s 2026 size bands. Data centre land costs from about ₹3 crore per acre for 100 to 500 MW parks to ₹35 to 60 crore per acre for small sites in Mumbai’s suburbs, on the same Anarock benchmarks. Savills counted more than 120 acres of data centre land transacted in H1 2026, as reported by Communications Today. Land counts as powered land only when the utility has committed MW and a date in writing. State authorities such as YEIDA in Uttar Pradesh and MIDC in Maharashtra have dedicated data centre parks or plans for them.

## Key points

- Anarock size bands: 5 to 10 MW on 2 to 5 acres, up to 100 to 500 MW on 50 to 200 acres (midpoints about 0.4 to 0.5 acre per MW, our calculation).
- Recent deals: STT GDC paid ₹282 crore for 3.48 acres with a building in Navi Mumbai (our conversion from 14,093 sq m); Amazon Data Services paid ₹125.13 crore for 10.6 acres from Lodha.
- Parks: YEIDA lists a 100-acre Data Centre Park in Sector 28; MIDC will take up data centre parks under Maharashtra’s IT/ITeS Policy 2023 (S&R Associates); Cushman & Wakefield reports a planned 500 MW park near Hoskote in Karnataka.
- Building norms help: Uttar Pradesh (2026) and West Bengal (2021) allow FAR 3.0 plus 1.0 purchasable for data centres.

## Land needed per MW for a data centre in India

| Facility size | Typical land (Anarock) | Acres per MW at the midpoint (our calculation) |
| --- | --- | --- |
| 5 to 10 MW | 2 to 5 acres | About 0.47 |
| 10 to 30 MW | 5 to 15 acres | About 0.5 |
| 30 to 100 MW | 15 to 50 acres | About 0.5 |
| 100 to 500 MW | 50 to 200 acres | About 0.42 |

Sources: ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

Land per MW is not fixed. The ratio depends on how many storeys the building has, the FAR the state allows, and how much of the site goes to the substation, generators and fuel. Anarock advises buying 30 to 50% more land than phase 1 needs. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

**Method:** [Acres per MW (method)](https://invariant-ai.com/blog/data-center-land-acres-per-mw)

## Data centre land prices in India

| Facility size | Land price per acre (Anarock, 2026) |
| --- | --- |
| 5 to 10 MW | ₹35 to 60 crore in Mumbai suburbs; ₹4 to 10 crore in secondary cities |
| 10 to 30 MW | ₹5 to 20 crore |
| 30 to 100 MW | ₹4 to 12 crore |
| 100 to 500 MW (Navi Mumbai, outer Chennai, Noida parks) | ₹3 to 10 crore |

Sources: ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

| Buyer | Land | Price | Date |
| --- | --- | --- | --- |
| STT GDC India | 14,093 sq m (about 3.48 acres) with a building, TTC Industrial Area, Navi Mumbai | ₹282 crore | Registered 22 May 2026 |
| Amazon Data Services | 10.6 acres from Lodha, Thane district | ₹125.13 crore | Reported June 2026 |
| Amazon Data Services (AWS) | 38.18 acres from Lodha, Palava | More than ₹450 crore | 2024 |
| Lumina CloudInfra (since acquired by AirTrunk) | 16 acres, Ambattur, Chennai | More than ₹500 crore | Reported January 2026 |
| Brookfield | 30 acres, Ghansoli, Navi Mumbai | ₹600 crore | Reported as agreed, August 2021 |

Sources: ([Communications Today](https://www.communicationstoday.co.in/stt-gdc-india-buys-navi-mumbai-land-for-%E2%82%B9282-crore-data-centre-project/)) ([Zee Business](https://www.zeebiz.com/hindi/real-estate/amazon-data-services-india-has-acquired-approximately-42955-sq-meters-of-non-agricultural-land-from-lodha-developers-256535)) ([DatacenterDynamics](https://datacenterdynamics.com/en/news/aws-acquires-38-acres-near-mumbai-india-for-potential-data-center-build)) ([Entrepreneur India](https://india.entrepreneur.com/news-and-trends/blackstone-plans-216-mw-data-centre-hub-in-chennai/502233)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Business Standard](https://www.business-standard.com/article/companies/canada-s-brookfield-to-buy-30-acre-land-in-navi-mumbai-for-rs-600-crore-121081101870_1.html))

Savills counted more than 120 acres of data centre land transacted in H1 2026, as reported by Communications Today. ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/))

## Data centre parks in India

- Uttar Pradesh: YEIDA lists a 100-acre Data Centre Park in Sector 28. UP’s 2026 policy defines a Data Center Park as a data centre with at least 40 MW of total load capacity.
- Maharashtra: according to S&R Associates, the IT/ITeS Policy 2023 says MIDC will take up data centre parks with all prior clearances for land allotted to data centres.
- Karnataka: Cushman & Wakefield reports a planned 500 MW data centre park near Hoskote, with the government committing solar power and treated water, and 500 MW planned at Mysuru and Mangaluru.
- Andhra Pradesh: ETV Bharat reported in October 2025 that the state offered Google’s subsidiary Raiden Infotech a 25% discount on 480 acres across Rambilli, Adavivaram and Mudasarlova, and Tarluvada.
- Private parks: Lodha has earmarked 400 acres at Palava for a data centre park, as reported by Business Standard in April 2026.

Sources: ([Yamuna Expressway Industrial Development Authority](https://www.yamunaexpresswayauthority.com/property/industrial)) ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([S&R Associates](https://www.snrlaw.in/incentives-and-laws-for-data-centers-in-maharashtra/)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([ETV Bharat](https://www.etvbharat.com/en/technology/andhra-pradesh-offers-rs-22000-crore-incentives-to-googles-raiden-infotech-for-data-centres-enn25101501804)) ([Business Standard](https://www.business-standard.com/industry/news/lodha-to-develop-1-gw-data-centre-capacity-in-mmr-invest-11-000-cr-126042700807_1.html))

## FAR, ground coverage and stamp duty rules for data centres

Uttar Pradesh’s 2026 policy gives data centres base FAR 3.0 free plus 1.0 chargeable, keeps basement parking, storage and DG space out of FAR, extends service FAR to 40% for DG sets, allows ground coverage of up to 60% or as per byelaws, whichever is higher, and places no restriction on floor-to-ceiling height subject to overall height rules. It exempts 100% of stamp duty on land bought or leased from a government authority and gives a land subsidy of 25% of sector rates in the Madhyanchal and Paschimanchal regions (Paschimanchal includes Gautam Buddha Nagar) and 50% in Bundelkhand and Purvanchal. ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf))

West Bengal’s 2021 policy also allows FAR 3.0 plus 1.0 purchasable and 60% ground coverage. ([Government of West Bengal (via wbxpress)](https://wbxpress.com/west-bengal-data-centre-policy-2021/))

**Policy:** [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison)

## What powered land means in India

In India, powered land means land with deliverable electricity for the load, documented by the utility, not land near a substation. In Navi Mumbai, Structure Research reports that the roughly 6 GW MSEDCL allocated to data centres is close to fully committed and that new builds are moving to Panvel, Taloja and Rasayani, where separate substations can be commissioned. ([Structure Research](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/))

**Power evidence:** [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Five rungs of power evidence](https://invariant-ai.com/blog/power-evidence-data-center-site-verification)

## How Invariant helps

Invariant does not list Indian land. For a parcel you are looking at, it checks how the site gets power and the evidence behind the MW, screens seismic, flood, groundwater and airport height risk, and maps the approvals. Send the coordinates or the state, the MW and the date you need power.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much land is needed for a 1 MW data centre?

Anarock’s size bands work out to about 0.4 to 0.5 acre per MW at their midpoints (our calculation), but land per MW is not fixed. The bands start at 2 to 5 acres for 5 to 10 MW. A small facility’s land need depends mostly on how many storeys the state’s FAR allows. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### What does data center land cost in India?

Data centre land in India costs about ₹3 to 10 crore per acre for 100 to 500 MW parks, rising to ₹35 to 60 crore per acre for small sites in Mumbai’s suburbs (Anarock, 2026). ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### Where are the data centre parks in India?

India’s data centre parks include YEIDA’s 100-acre Data Centre Park in Sector 28 (Uttar Pradesh), MIDC data centre parks in Maharashtra, and Karnataka’s planned 500 MW park near Hoskote. Lodha has earmarked 400 acres at Palava for a data centre park. ([Yamuna Expressway Industrial Development Authority](https://www.yamunaexpresswayauthority.com/property/industrial)) ([S&R Associates](https://www.snrlaw.in/incentives-and-laws-for-data-centers-in-maharashtra/)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Business Standard](https://www.business-standard.com/industry/news/lodha-to-develop-1-gw-data-centre-capacity-in-mmr-invest-11-000-cr-126042700807_1.html))

### What does data centre land cost per acre near Mumbai?

Anarock prices small sites of 5 to 10 MW in Mumbai’s suburbs at ₹35 to 60 crore per acre. Zee Business reported in June 2026 that Amazon Data Services paid ₹125.13 crore for 10.6 acres from Lodha in Thane district, about ₹11.8 crore per acre (our calculation). ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Zee Business](https://www.zeebiz.com/hindi/real-estate/amazon-data-services-india-has-acquired-approximately-42955-sq-meters-of-non-agricultural-land-from-lodha-developers-256535))

### What FAR do data centres get in India?

Uttar Pradesh’s 2026 policy and West Bengal’s 2021 policy both allow FAR 3.0 plus 1.0 purchasable and up to 60% ground coverage for data centres; both keep basement parking, storage and DG space out of FAR. ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([Government of West Bengal (via wbxpress)](https://wbxpress.com/west-bengal-data-centre-policy-2021/))

## Sources

- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- Communications Today: [STT GDC India buys Navi Mumbai land for ₹282 crore](https://www.communicationstoday.co.in/stt-gdc-india-buys-navi-mumbai-land-for-%E2%82%B9282-crore-data-centre-project/)
- Zee Business: [Amazon Data Services India acquires land from Lodha Developers](https://www.zeebiz.com/hindi/real-estate/amazon-data-services-india-has-acquired-approximately-42955-sq-meters-of-non-agricultural-land-from-lodha-developers-256535)
- DatacenterDynamics: [AWS acquires 38 acres near Mumbai for potential data center build](https://datacenterdynamics.com/en/news/aws-acquires-38-acres-near-mumbai-india-for-potential-data-center-build)
- Entrepreneur India: [Blackstone plans 216 MW data centre hub in Chennai](https://india.entrepreneur.com/news-and-trends/blackstone-plans-216-mw-data-centre-hub-in-chennai/502233)
- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Business Standard: [Canada's Brookfield to buy 30-acre land in Navi Mumbai for ₹600 crore](https://www.business-standard.com/article/companies/canada-s-brookfield-to-buy-30-acre-land-in-navi-mumbai-for-rs-600-crore-121081101870_1.html)
- Communications Today: [India's data centre capacity additions jump 59% in H1 2026 (Savills)](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)
- Yamuna Expressway Industrial Development Authority: [Industrial property and Data Centre Park, Sector 28](https://www.yamunaexpresswayauthority.com/property/industrial)
- Government of Uttar Pradesh: [Uttar Pradesh Data Center Policy 2026 (G.O. dated 9 July 2026)](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)
- S&R Associates: [Incentives and laws for data centers in Maharashtra (IT/ITeS Policy 2023)](https://www.snrlaw.in/incentives-and-laws-for-data-centers-in-maharashtra/)
- ETV Bharat: [Andhra Pradesh offers ₹22,000 crore incentives to Google’s Raiden Infotech for data centres](https://www.etvbharat.com/en/technology/andhra-pradesh-offers-rs-22000-crore-incentives-to-googles-raiden-infotech-for-data-centres-enn25101501804)
- Business Standard: [Lodha to develop 1 GW data centre capacity in MMR](https://www.business-standard.com/industry/news/lodha-to-develop-1-gw-data-centre-capacity-in-mmr-invest-11-000-cr-126042700807_1.html)
- Government of West Bengal (via wbxpress): [West Bengal Data Centre Policy 2021 (notification of 6 September 2021)](https://wbxpress.com/west-bengal-data-centre-policy-2021/)
- Structure Research: [Mumbai and Pune data centre report 2026](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/)

## Related

- [Data centre cost per MW in India: ₹35 to 75 crore to build, plus land (2026)](https://invariant-ai.com/blog/data-centre-cost-per-mw-india)
- [How to find a data centre site in India: power, fibre, land and risk (2026)](https://invariant-ai.com/blog/find-data-centre-site-india)
- [Data centre site due diligence in India: the feasibility checklist (2026)](https://invariant-ai.com/blog/data-centre-site-due-diligence-india)
- [Data Center Land Requirements: How Many Acres per MW?](https://invariant-ai.com/blog/data-center-land-acres-per-mw)
- [Uttar Pradesh data centre policy 2026: parks, capital subsidy and power incentives](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)