# Data centres in Bengaluru: capacity, Whitefield, Hoskote and water (2026)

> Bengaluru had 162 MW of operational data centre capacity in H1 2026 (Cushman & Wakefield), mostly in Whitefield, with 28% vacancy. Water is the binding constraint.

URL: https://invariant-ai.com/blog/data-centres-in-bengaluru  
Published: 2026-11-21 · Publisher: Invariant · Region: Bengaluru, Karnataka, India

Bengaluru had 162 MW of operational data centre capacity in H1 2026, about 9% of India’s top seven cities, according to Cushman & Wakefield. That makes it a mid-sized market, with only 8 MW under construction and 28% colocation vacancy, in a city Anarock describes as having a large concentration of IT firms, global capability centres and startups. Most capacity is in Whitefield in the east. Karnataka’s Sustainable Data Centre Policy 2026-31 targets 1 GW of IT load by 2031 and pays for low PUE and water efficiency. Water is the constraint: Newslaundry reports that most of the city’s data centres sit in its worst water-stressed areas.

## Key points

- Bengaluru had 162 MW operational, 8 MW under construction and 92 MW planned in H1 2026 (Cushman & Wakefield). Anarock counts 137 MW IT.
- Peripheral East (Whitefield) holds 128 MW of Bengaluru’s capacity and Peripheral South (Electronic City) 22 MW, per Cushman & Wakefield. Anarock names Devanahalli in the north as the primary hyperscale growth corridor.
- Karnataka’s 2026-31 policy pays Rs 20 crore for PUE between 1.00 and 1.20 sustained for three years and plans parks at Hoskote, Mysuru and Mangaluru.
- Newslaundry, citing the CGWB, reports that Bengaluru extracts almost 10 times the groundwater it recharges each year.

## Bengaluru data centre market: key facts (H1 2026)

| Item | Figure and period |
| --- | --- |
| Operational capacity | 162 MW, about 9% of top seven cities (Cushman & Wakefield, H1 2026); 137 MW IT (Anarock) |
| Under construction and planned | 8 MW under construction; 92 MW planned (Cushman & Wakefield) |
| Colocation vacancy | 28.0% (Cushman & Wakefield, H1 2026) |
| Sub-markets | Peripheral East (Whitefield) 128 MW; Peripheral South (Electronic City) 22 MW |
| State policy | Karnataka Sustainable Data Centre Policy 2026-31, issued by the state IT department (reported 30 September 2026) |
| Physical risk note | Seismic Zone II (IS 1893 Part 1:2002); groundwater extraction far above recharge (CGWB, via Newslaundry) |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([The News Minute](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([Newslaundry](https://www.newslaundry.com/2026/04/16/in-bengalurus-water-stressed-areas-sit-most-of-its-data-centres))

Cushman & Wakefield attributes Bengaluru’s high colocation vacancy to relatively muted enterprise demand and low hyperscaler activity. Anarock forecasts 400 MW IT by 2030. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

## Bengaluru data centre sub-markets: Whitefield, Electronic City, Devanahalli and Hoskote

Whitefield and Bengaluru’s eastern periphery hold most of the city’s live capacity, 128 of 162 MW, per Cushman & Wakefield. Anarock lists NTT’s Bengaluru 4 in Electronic City, about 67 MW of IT load, among upcoming supply, and names Devanahalli and North Bengaluru as the primary hyperscale growth corridor. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

Cushman & Wakefield reports a planned 500 MW data centre park near Hoskote, with the government committing solar power and treated water, and 500 MW planned at Mysuru and Mangaluru. The 2026-31 policy offers park land on 30 plus 30 year leases with dual-grid power connectivity. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([The News Minute](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say))

## Karnataka’s Sustainable Data Centre Policy 2026-31

Karnataka’s Sustainable Data Centre Policy 2026-31, issued by the state IT department, sets an IT load target and pays for low PUE and water efficiency. Its main terms: ([The News Minute](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say))

- A target of 1 GW of cumulative data centre IT load by 2031.
- A one-time PUE incentive of Rs 20 crore for PUE between 1.00 and 1.20, paid in the fourth year after the PUE is shown for three consecutive years.
- WUE reimbursement up to Rs 30 lakh a year for two years at 0.7 to 1.3 litres per kWh, and treated water reimbursement up to Rs 8 lakh a year for five years.
- Customised packages for strategically important projects above Rs 3,000 crore, including cable landing stations and desalination plants.

Sources: ([The News Minute](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say))

Anarock notes the earlier Karnataka Data Centre Policy 2022-27. Check which policy a project falls under before relying on its terms. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

## Water: the binding constraint for Bengaluru data centres

Newslaundry reported in April 2026 that most of Bengaluru’s data centres are in the eastern and south-eastern tech corridors around Whitefield and Electronic City, running through the city’s worst water-stressed areas in summer, and quoted a hydrologist saying data centres mostly consume groundwater. Citing the CGWB, it reported that Bengaluru extracts almost 10 times the water it recharges each year. ([Newslaundry](https://www.newslaundry.com/2026/04/16/in-bengalurus-water-stressed-areas-sit-most-of-its-data-centres))

Under CGWA guidelines, new industries other than MSMEs cannot get groundwater NOCs in over-exploited assessment units, and expansion that increases abstraction there is not allowed. Anarock estimates about 25.5 million litres per MW per year for cooling towers, so a new Bengaluru site needs a water plan, such as treated water or air-cooled or closed-loop systems, from day one. ([Central Ground Water Authority, Ministry of Jal Shakti](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

## Other data centre site risks in Bengaluru

- Seismic: Bengaluru is Zone II (zone factor 0.10) in the IS 1893 (Part 1):2002 town list.
- Airport: Anarock cites airport connectivity as an advantage of Devanahalli and North Bengaluru. AAI height NOCs apply up to 20 km from VFR airports and 56 km from IFR airports.

Sources: ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Airports Authority of India](https://nocas2.aai.aero/nocas/FAQ.html))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Bengaluru the groundwater unit and the water plan decide the site before power does.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much data centre capacity does Bengaluru have?

Bengaluru had 162 MW of operational data centre capacity in H1 2026, according to Cushman & Wakefield, with 8 MW under construction and 92 MW planned. Anarock counted 137 MW IT. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### Where are the data centres in Bengaluru?

Most of Bengaluru’s data centre capacity is in Whitefield and the eastern periphery (128 MW), followed by Electronic City (22 MW), per Cushman & Wakefield. Anarock names Devanahalli as the hyperscale growth corridor, and a 500 MW park is planned near Hoskote. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### What does Karnataka’s new data centre policy offer?

Karnataka’s Sustainable Data Centre Policy 2026-31 offers Rs 20 crore for a PUE of 1.00 to 1.20, water efficiency and treated water reimbursements, and parks at Hoskote, Mysuru and Mangaluru. It targets 1 GW by 2031. ([The News Minute](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say))

### Is water a problem for data centres in Bengaluru?

Yes. Newslaundry reports that most of the city’s data centres are in its worst water-stressed areas and that Bengaluru extracts almost 10 times the groundwater it recharges. CGWA guidelines restrict new industrial abstraction in over-exploited units. ([Newslaundry](https://www.newslaundry.com/2026/04/16/in-bengalurus-water-stressed-areas-sit-most-of-its-data-centres)) ([Central Ground Water Authority, Ministry of Jal Shakti](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf))

### Why is data centre vacancy high in Bengaluru?

Cushman & Wakefield attributes Bengaluru’s high vacancy to relatively muted enterprise demand and low hyperscaler activity. Vacancy was 28.0% in H1 2026. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

## Sources

- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- The News Minute: [Karnataka’s new data centre policy puts water, energy in focus](https://www.thenewsminute.com/karnataka/karnatakas-new-data-centre-policy-puts-water-energy-in-focus-what-does-it-say)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- Newslaundry: [In Bengaluru’s water-stressed areas sit most of its data centres](https://www.newslaundry.com/2026/04/16/in-bengalurus-water-stressed-areas-sit-most-of-its-data-centres)
- Central Ground Water Authority, Ministry of Jal Shakti: [Guidelines to regulate and control ground water extraction in India (24 September 2020)](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)
- Airports Authority of India: [NOCAS frequently asked questions (height clearance under GSR 751(E))](https://nocas2.aai.aero/nocas/FAQ.html)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Karnataka data centre policy 2026-31: incentives, water rules and the 2022 policy](https://invariant-ai.com/blog/karnataka-data-centre-policy)
- [Water for data centres in India: groundwater NOC, water stress and state rules](https://invariant-ai.com/blog/data-centre-water-india)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)