# Data centres in Chennai: capacity, Ambattur, Siruseri and flood risk (2026)

> Chennai had 214 MW of operational data centre capacity in H1 2026 (Cushman & Wakefield), mostly in Ambattur and Siruseri, with 26.7% vacancy and flood risk.

URL: https://invariant-ai.com/blog/data-centres-in-chennai  
Published: 2026-11-21 · Publisher: Invariant · Region: Chennai, Tamil Nadu, India

Chennai had 214 MW of operational data centre capacity in H1 2026 across 18 facilities, about 12% of India’s top seven cities, according to Cushman & Wakefield. Chennai is India’s second-largest data centre market by both Cushman & Wakefield’s and Savills’ counts; Savills puts it at 320 MW IT. Colocation vacancy was 26.7% after significant new supply. Most capacity is in Ambattur in the west and Siruseri on the OMR. The city has 7 cable landing stations with 2 under construction. Tamil Nadu’s Data Centre Policy 2021 applies to data centres incorporated from 1 April 2021 until 31 March 2026.

## Key points

- Chennai had 214 MW operational, 55 MW under construction and 313 MW planned in H1 2026 (Cushman & Wakefield). Savills counts 320 MW IT; Anarock 298 MW IT.
- Chennai’s colocation vacancy was 26.7% in H1 2026, against 7.9% in Mumbai, and Siruseri’s was 41.7% (Cushman & Wakefield).
- Tamil Nadu’s 2021 policy applies to data centres incorporated from 1 April 2021 to 31 March 2026. Check what applies to a later project before relying on any incentive.
- Chennai’s Meenambakkam station recorded 1,178.3 mm of rain in November 2015, its all-time record monthly total for November (India Meteorological Department).

## Chennai data centre market: key facts (H1 2026)

| Item | Figure and period |
| --- | --- |
| Operational capacity | 214 MW, about 12% of top seven cities (Cushman & Wakefield, H1 2026); 320 MW IT, 18% of India (Savills, H1 2026) |
| Under construction and planned | 55 MW under construction; 313 MW planned (Cushman & Wakefield) |
| Added in H1 2026 | 8 MW (Cushman & Wakefield) |
| Colocation vacancy | 26.7% (Cushman & Wakefield, H1 2026) |
| Facilities | 18 data centres (Cushman & Wakefield) |
| Cable landing stations | 7 existing, 2 under construction (Cushman & Wakefield) |
| State policy | Tamil Nadu Data Centre Policy 2021, for data centres incorporated 1 April 2021 to 31 March 2026 |
| Physical risk note | Seismic Zone III (IS 1893 Part 1:2002); November 2015 record rainfall at Meenambakkam |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Government of Tamil Nadu (via National Single Window System)](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([India Meteorological Department, RMC Chennai](https://mausam.imd.gov.in/chennai/mcdata/extreme_meenambakkam.pdf))

Chennai capacity counts differ by method: Cushman & Wakefield counts colocation and hyperscale cloud capacity; Savills counts IT load; Anarock gives 298 MW IT across 25 facilities and forecasts 900 MW by 2030. Tamil Nadu’s 2021 policy says the state has the second-highest number of submarine cable landing stations in India. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Government of Tamil Nadu (via National Single Window System)](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf))

Cushman & Wakefield attributes Chennai’s high vacancy largely to significant supply entering the market in recent quarters, notes a large GPU deployment by a neocloud provider in H1 2026, and expects hyperscaler and neocloud deployments to raise occupancy. JLL says Chennai accounted for 50% of India’s H1 2026 supply additions in its count. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers))

## Chennai data centre sub-markets: Ambattur, Siruseri and the Sriperumbudur corridor

| Sub-market | Operational | Vacancy | Pipeline |
| --- | --- | --- | --- |
| Ambattur | 92 MW in 6 data centres | 12.1% | 42 MW under construction, 124 MW planned, 548 MW early stage |
| Siruseri | 104 MW in 9 data centres | 41.7% | 14 MW under construction, 171 MW planned, 141 MW early stage |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

Ambattur, in the city’s west, is where large new buildings are going. CapitaLand Data Centre Chennai 01 in Ambattur, with 34 MW of IT capacity, is due for completion by the end of 2026. Lumina CloudInfra, which AirTrunk has acquired, bought 16 acres in Ambattur for a campus with an initial 216 MW of IT load. Siruseri hosts Equinix CN1, opened in September 2025 with 800 cabinets of initial capacity, and campuses from STT GDC and Sify. ([DCD](https://www.datacenterdynamics.com/en/news/capitaland-to-launch-53mw-data-center-in-chennai-india-before-the-end-of-the-year/)) ([Entrepreneur India](https://india.entrepreneur.com/news-and-trends/blackstone-plans-216-mw-data-centre-hub-in-chennai/502233)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Equinix](https://newsroom.equinix.com/2025-09-19-Equinix-Opens-First-AI-Ready-Data-Center-in-Chennai,1)) ([Analytics India Magazine](https://analyticsindiamag.com/ai-news/stt-gdc-india-expands-chennai-footprint-as-part-of-4200-cr-commitment)) ([Sify Infinit Spaces](https://sifyinfinitspaces.com/))

Anarock identifies the Oragadam industrial belt and the Parandur-Sriperumbudur corridor as the emerging and long-term growth zone, with larger and cheaper land. Digital Connexion, the Reliance, Brookfield and Digital Realty joint venture, launched its first Chennai campus in January 2024 with capacity for up to 100 MW of critical IT load. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Business Today](https://www.businesstoday.in/latest/corporate/story/reliance-brookfield-digital-realty-jv-to-invest-11-billion-in-andhra-pradesh-to-build-1-gw-data-centre-503905-2025-11-27))

## Power for Chennai data centres and the Tamil Nadu policy after March 2026

Tamil Nadu’s Data Centre Policy 2021 gave incentives to projects investing above Rs 500 crore that meet at least 30% of their energy use from renewable sources. It offered a 100% electricity tax subsidy for 5 years, open access charges at 50% of the conventional charge, a concessional cross subsidy surcharge, dual power from two grids for sanctioned loads of 50 MW or more, and an additional feeder above 100 MW. ([Government of Tamil Nadu (via National Single Window System)](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf))

Under the Tamil Nadu supply rules, loads from 10 MVA up to 50 MVA are supplied at 110 kV and loads above 50 MVA at 230 kV. TNERC’s tariff order of June 2025 sets HT-I (industries, factories and IT services, which include data centres) at Rs 7.50 per kWh and Rs 608 per kVA per month from 1 July 2025; check for later revisions. ([TNPDCL](https://app1.tangedco.org/nsconline/tcateg.xhtml)) ([Tamil Nadu Electricity Regulatory Commission](https://www.tnpdcl.org/static/tnpdcl/assets/files/tariff/2025/TO062025/TO62025.pdf))

The Tamil Nadu policy applies to data centres incorporated from 1 April 2021 until 31 March 2026. Projects incorporated after that date should not assume these terms apply. ELCOT drafted the policy; confirm with the state what is available now, and get it in writing. ([Government of Tamil Nadu (via National Single Window System)](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf))

## Data centre land prices in Chennai

Anarock’s national benchmarks put land for 10 to 30 MW facilities at Rs 5 to 20 crore per acre, varying by state and zone, and land for 100 to 500 MW parks, in locations including outer Chennai, at Rs 3 to 10 crore per acre. Lumina’s 16 acres in Ambattur were reported at over Rs 500 crore in January 2026. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Entrepreneur India](https://india.entrepreneur.com/news-and-trends/blackstone-plans-216-mw-data-centre-hub-in-chennai/502233))

SIPCOT and ELCOT industrial land and private land follow different routes. Whether a separate land-use conversion is needed depends on the parcel; confirm it with the allotting agency or district authority before signing.

## Data centre site risks in Chennai: flood, cyclone and water

- Flood: Meenambakkam recorded 1,178.3 mm in November 2015, its all-time record monthly total for November. During Cyclone Michaung, Meenambakkam received 415 mm from 3 December to 1.30 pm on 4 December 2023, per The News Minute.
- Seismic: Chennai is Zone III (zone factor 0.16) in the IS 1893 (Part 1):2002 town list.
- Heat: the 1991 to 2020 mean daily maximum at Meenambakkam is 37.3 degrees C in May, which sets the cooling design point.
- Water: SBI names Bengaluru, Chennai and Gurugram as water-stressed metros where data centre water use is under scrutiny. Under CGWA guidelines, new industries other than MSMEs cannot get groundwater NOCs in over-exploited assessment units.

Sources: ([India Meteorological Department, RMC Chennai](https://mausam.imd.gov.in/chennai/mcdata/extreme_meenambakkam.pdf)) ([The News Minute](https://www.thenewsminute.com/tamil-nadu/chennai-records-highest-amount-of-rainfall-since-2015-floods)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([SBI CHAKRA Centre of Excellence](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)) ([Central Ground Water Authority, Ministry of Jal Shakti](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Chennai, plot elevation and drainage relative to the 2015 and 2023 flood extents come before anything else.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much data centre capacity does Chennai have?

Chennai had 214 MW of operational data centre capacity in H1 2026, according to Cushman & Wakefield, with 55 MW under construction and 313 MW planned. Savills counted 320 MW IT and Anarock 298 MW IT. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### Where are the data centres in Chennai?

Chennai’s data centres are mainly in Siruseri (104 MW) and Ambattur (92 MW), per Cushman & Wakefield’s H1 2026 count. Anarock names the Oragadam and Parandur-Sriperumbudur corridors as the emerging zone for large campuses. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### Is the Tamil Nadu data centre policy still in force?

Tamil Nadu’s Data Centre Policy 2021 applies to data centres incorporated from 1 April 2021 to 31 March 2026. For a project incorporated later, check current terms with the state before relying on them. ([Government of Tamil Nadu (via National Single Window System)](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf))

### Why is Chennai good for a data center?

Chennai’s draw is its cable landing stations, according to Cushman & Wakefield: seven existing and two under construction, which have driven demand from colocation and hyperscale cloud providers. The trade-off is flood exposure, shown by the November 2015 record rainfall. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([India Meteorological Department, RMC Chennai](https://mausam.imd.gov.in/chennai/mcdata/extreme_meenambakkam.pdf))

### Why is data centre vacancy high in Chennai?

Cushman & Wakefield attributes Chennai’s high vacancy largely to significant recent supply. Vacancy was 26.7% in H1 2026, with Siruseri at 41.7%, and the firm expects hyperscaler and neocloud deployments to raise occupancy. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

## Sources

- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Communications Today: [India's data centre capacity additions jump 59% in H1 2026 (Savills India)](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)
- Government of Tamil Nadu (via National Single Window System): [Tamil Nadu Data Centre Policy 2021](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf)
- TNPDCL: [New service connection: categories of supply (Tamil Nadu Electricity Supply Code)](https://app1.tangedco.org/nsconline/tcateg.xhtml)
- Tamil Nadu Electricity Regulatory Commission: [TNERC Suo-motu Tariff Order 6 of 2025 (30 June 2025)](https://www.tnpdcl.org/static/tnpdcl/assets/files/tariff/2025/TO062025/TO62025.pdf)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- India Meteorological Department, RMC Chennai: [Meenambakkam climate extremes](https://mausam.imd.gov.in/chennai/mcdata/extreme_meenambakkam.pdf)
- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- JLL: [India data centers: 2026 mid-year report](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)
- DCD: [CapitaLand to launch 53 MW data center in Chennai](https://www.datacenterdynamics.com/en/news/capitaland-to-launch-53mw-data-center-in-chennai-india-before-the-end-of-the-year/)
- Entrepreneur India: [Blackstone plans 216 MW data centre hub in Chennai](https://india.entrepreneur.com/news-and-trends/blackstone-plans-216-mw-data-centre-hub-in-chennai/502233)
- Equinix: [Equinix opens first AI-ready data center in Chennai](https://newsroom.equinix.com/2025-09-19-Equinix-Opens-First-AI-Ready-Data-Center-in-Chennai,1)
- Analytics India Magazine: [STT GDC India expands Chennai footprint](https://analyticsindiamag.com/ai-news/stt-gdc-india-expands-chennai-footprint-as-part-of-4200-cr-commitment)
- Sify Infinit Spaces: [Sify Infinit Spaces data centres](https://sifyinfinitspaces.com/)
- Business Today: [Reliance, Brookfield, Digital Realty JV to invest $11 billion in Andhra Pradesh for 1 GW data centre](https://www.businesstoday.in/latest/corporate/story/reliance-brookfield-digital-realty-jv-to-invest-11-billion-in-andhra-pradesh-to-build-1-gw-data-centre-503905-2025-11-27)
- The News Minute: [Chennai records highest rainfall since 2015 floods](https://www.thenewsminute.com/tamil-nadu/chennai-records-highest-amount-of-rainfall-since-2015-floods)
- SBI CHAKRA Centre of Excellence: [Data Centres in India: sector report (April 2026)](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)
- Central Ground Water Authority, Ministry of Jal Shakti: [Guidelines to regulate and control ground water extraction in India (24 September 2020)](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Tamil Nadu data centre policy: the 2021 policy, incentives and status (2026)](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy)
- [Mumbai vs Chennai vs Hyderabad for data centres: power, policy and risk (2026)](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Seismic zones, flood and cyclone risk for data centres in India (2026)](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)