# Data centres in Hyderabad: capacity, hyperscalers and power (2026)

> Hyderabad had 151 MW of operational data centre capacity in H1 2026 and India’s second-largest pipeline after Mumbai, with AWS and Microsoft cloud regions.

URL: https://invariant-ai.com/blog/data-centres-in-hyderabad  
Published: 2026-11-21 · Publisher: Invariant · Region: Hyderabad, Telangana, India

Hyderabad had 151 MW of operational data centre capacity in H1 2026, about 8% of India’s top seven cities, according to Cushman & Wakefield. The same count gives Hyderabad 668 MW planned and 18% of all upcoming supply to 2030, the second-largest pipeline after Mumbai. AWS launched its Hyderabad region in November 2022 and has started a greenfield campus at Bharat Future City, and Microsoft launched its India South Central region in Hyderabad on 21 September 2026. Telangana adopted a dedicated data centre policy in 2016, and officials have cited about 5 GW by 2029 or 2030.

## Key points

- Hyderabad had 151 MW operational, 42 MW under construction and 668 MW planned in H1 2026 (Cushman & Wakefield).
- South Hyderabad holds 92 MW at 0% colocation vacancy, with 1,758 MW at early stage; West Hyderabad holds 59 MW (Cushman & Wakefield, H1 2026).
- Knight Frank puts the committed and early-stage pipeline at about 1.9 GW and says AWS holds 46% of live IT capacity.
- Hyderabad is Seismic Zone II, the lowest zone in the IS 1893 (Part 1):2002 scheme. The main recent hazard event was the October 2020 flood, when Greater Hyderabad recorded 324 mm of rain in 24 hours (Times of India).

## Hyderabad data centre market: key facts (H1 2026)

| Item | Figure and period |
| --- | --- |
| Operational capacity | 151 MW, about 8% of top seven cities (Cushman & Wakefield, H1 2026); 151.4 MW at end 2025 (Knight Frank) |
| Under construction and planned | 42 MW under construction; 668 MW planned (Cushman & Wakefield) |
| Share of upcoming supply | 18% of 3,860 MW in the top seven cities to 2030, second to Mumbai (Cushman & Wakefield) |
| Colocation vacancy | 28.0% (Cushman & Wakefield, H1 2026); 23% average in 2025 (Knight Frank) |
| Hyperscale regions | AWS Asia Pacific (Hyderabad), launched 22 November 2022; Microsoft India South Central, launched 21 September 2026 |
| State policy | Dedicated data centre policy since 2016 (Cushman & Wakefield); about 5 GW by 2029 (Deccan Chronicle) or 2030 (Commissioner of Industries, ANI) |
| Grid note | Crisil Ratings: data centre capacity could equal about 20% of Hyderabad’s current peak demand by fiscal 2030 |
| Physical risk note | Seismic Zone II (IS 1893 Part 1:2002); October 2020 floods |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Telangana Today](https://telanganatoday.com/hyderabad-emerges-as-indias-fast-growing-hyperscale-data-centre-hub)) ([Amazon](https://press.aboutamazon.com/in/2022/11/aws-launches-second-infrastructure-region-in-india)) ([Microsoft](https://news.microsoft.com/source/asia/2026/09/21/ai-ambition-into-action-microsoft-brings-ai-ready-capabilities-across-its-india-cloud-infrastructure-establishes-india-south-central-region-as-a-strategic-hub-for-asia-and-global-south/)) ([Cushman & Wakefield](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)) ([ANI](https://www.aninews.in/news/business/hyderabad-emerging-as-major-ai-data-centre-hub-with-usd-10-20-billion-investments-in-pipeline-telangana-govt-official20260528202824/)) ([Deccan Chronicle](https://www.deccanchronicle.com/amp/southern-states/telangana/telangana-targets-5gw-data-centre-capacity-by-2029-as-microsoft-opens-hyderabad-region-1990282)) ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([The Times of India](https://timesofindia.indiatimes.com/city/hyderabad/at-324-mm-greater-hyd-scores-one-day-maximum-after-20-years/articleshow/78670445.cms))

Hyderabad capacity baselines differ. Cushman & Wakefield and Knight Frank both put the city at about 151 MW. Deccan Chronicle reported the state government citing 300 MW operating across its hyperscale and AI infrastructure ecosystem, a figure on a different basis. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Telangana Today](https://telanganatoday.com/hyderabad-emerges-as-indias-fast-growing-hyperscale-data-centre-hub)) ([Deccan Chronicle](https://www.deccanchronicle.com/amp/southern-states/telangana/telangana-targets-5gw-data-centre-capacity-by-2029-as-microsoft-opens-hyderabad-region-1990282))

## Hyderabad data centre sub-markets: the southern ORR belt, HITEC City and Bharat Future City

| Sub-market | Operational | Vacancy | Pipeline |
| --- | --- | --- | --- |
| South Hyderabad | 92 MW in 3 data centres | 0.0% | 39 MW under construction, 634 MW planned, 1,758 MW early stage |
| West Hyderabad | 59 MW in 8 data centres | 28.0% | 3 MW under construction, 34 MW planned |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

Anarock calls the southern outer ring road belt through Maheshwaram, Shamshabad and Tukkuguda the primary hyperscale growth corridor, and HITEC City and Gachibowli the established enterprise and colocation hub, where land scarcity is driving multi-storey builds. CtrlS plans a 40-acre park at Chandanvelly Industrial Park with over 600 MW of potential IT load and 250 MW of sanctioned power for phase one. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([CtrlS](https://www.ctrls.com/press-release-ctrls-unveils-plans-for-new-datacenter-park-on-a-40-acre-land-parcel-near-hyderabad/))

Anarock names Kongara Kalan and Bharat Future City as the next-generation expansion zone. Cushman & Wakefield reports that AWS has started a greenfield data centre at Bharat Future City, expected live in 2028, and ThePrint reported that the state allocated 202 acres in Bharat Future City and 98 acres in Chandanvelly to Amazon. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([ThePrint](https://theprint.in/india/governance/telangana-secures-amazons-biggest-india-data-centre-project-months-after-google-announced-ai-hub-in-ap/2987492/))

## Power for Hyderabad data centres: Telangana supply rules and tariffs

Crisil Ratings estimates that by fiscal 2030 data centre capacity in Hyderabad could equal about 20% of the city’s current peak power demand, a third of the share it projects for Mumbai. CtrlS reports 250 MW of sanctioned power for the first phase of its Chandanvelly park, an example of the document a buyer should ask to see. ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631)) ([CtrlS](https://www.ctrls.com/press-release-ctrls-unveils-plans-for-new-datacenter-park-on-a-40-acre-land-parcel-near-hyderabad/))

Telangana’s supply rules put contracted demand above 10,000 kVA on a common feeder, or above 20,000 kVA on a dedicated feeder, at 132 kV or above. Supply at 132 kV or above is through a dedicated feeder or a loop-in loop-out arrangement decided by TS Transco, and a consumer on a dedicated feeder pays the full cost of the service line. HT industrial supply at 132 kV and above was Rs 6.65 per kVAh with a Rs 500 per kVA monthly demand charge in the FY 2024-25 order; The Hans India reported no tariff hike for 2026-27. ([Telangana Electricity Regulatory Commission](https://tgerc.telangana.gov.in/file_upload/uploads/Clarifications/GTCS%20Amendment_19102022.pdf)) ([Telangana Electricity Regulatory Commission](https://tgerc.telangana.gov.in/file_upload/uploads/Tariff%20Orders/Current%20Year%20Orders/2024/FY24-25%20RST%20Order.pdf)) ([The Hans India](https://www.thehansindia.com/telangana/no-power-tariff-hike-for-202627-tgerc-1061820))

Cushman & Wakefield notes that Telangana was the first state to implement a dedicated data centre policy, in 2016. ThePrint reported that the state’s land allocations to Amazon came with incentives worth Rs 125 crore. ([Cushman & Wakefield](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)) ([ThePrint](https://theprint.in/india/governance/telangana-secures-amazons-biggest-india-data-centre-project-months-after-google-announced-ai-hub-in-ap/2987492/))

## Data centre site risks in Hyderabad

- Seismic: Hyderabad is Zone II (zone factor 0.10) in the IS 1893 (Part 1):2002 town list, the lowest zone in that scheme.
- Flood: on 13 October 2020 Greater Hyderabad and its outskirts recorded 324 mm of rain in 24 hours, per the Times of India. A state minister said 33 people died in the GHMC and adjoining areas. Low-lying plots need a drainage check.
- Groundwater: under CGWA guidelines, new industries other than MSMEs cannot get groundwater NOCs in over-exploited assessment units. Check the specific unit before relying on borewells.
- Airport: Anarock cites airport proximity as an advantage of the southern corridor. AAI height NOCs apply up to 20 km from VFR airports and 56 km from IFR airports.

Sources: ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([The Times of India](https://timesofindia.indiatimes.com/city/hyderabad/at-324-mm-greater-hyd-scores-one-day-maximum-after-20-years/articleshow/78670445.cms)) ([The Times of India](https://timesofindia.indiatimes.com/city/hyderabad/telangana-rains-death-toll-goes-up-to-70-government-on-alert-with-fresh-spell-forecast/articleshow/78749477.cms)) ([Central Ground Water Authority, Ministry of Jal Shakti](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Airports Authority of India](https://nocas2.aai.aero/nocas/FAQ.html))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Hyderabad the questions are which substation serves the corridor, what is already allocated on it, and the height surface over the plot.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much data centre capacity does Hyderabad have?

Hyderabad had 151 MW of operational data centre capacity in H1 2026, according to Cushman & Wakefield, with 42 MW under construction and 668 MW planned. Knight Frank put the committed and early-stage pipeline at about 1.9 GW. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Telangana Today](https://telanganatoday.com/hyderabad-emerges-as-indias-fast-growing-hyperscale-data-centre-hub))

### Where are the data centres in Hyderabad?

Hyderabad’s data centres sit in two Cushman & Wakefield sub-markets, South Hyderabad (92 MW) and West Hyderabad (59 MW). Anarock names the southern ORR belt through Maheshwaram, Shamshabad and Tukkuguda as the main hyperscale corridor and HITEC City and Gachibowli as the established hub. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### Which hyperscalers have data centres in Hyderabad?

AWS launched its Hyderabad region in November 2022, and Microsoft launched its India South Central region in Hyderabad on 21 September 2026. Knight Frank says AWS holds 46% of live IT capacity. ([Amazon](https://press.aboutamazon.com/in/2022/11/aws-launches-second-infrastructure-region-in-india)) ([Microsoft](https://news.microsoft.com/source/asia/2026/09/21/ai-ambition-into-action-microsoft-brings-ai-ready-capabilities-across-its-india-cloud-infrastructure-establishes-india-south-central-region-as-a-strategic-hub-for-asia-and-global-south/)) ([Telangana Today](https://telanganatoday.com/hyderabad-emerges-as-indias-fast-growing-hyperscale-data-centre-hub))

### Does Telangana have a data center policy?

Telangana was the first state to implement a dedicated data centre policy, in 2016, according to Cushman & Wakefield. Officials have cited about 5 GW of capacity by 2029 or 2030. ([Cushman & Wakefield](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)) ([ANI](https://www.aninews.in/news/business/hyderabad-emerging-as-major-ai-data-centre-hub-with-usd-10-20-billion-investments-in-pipeline-telangana-govt-official20260528202824/)) ([Deccan Chronicle](https://www.deccanchronicle.com/amp/southern-states/telangana/telangana-targets-5gw-data-centre-capacity-by-2029-as-microsoft-opens-hyderabad-region-1990282))

### What is the earthquake risk for a data centre in Hyderabad?

Hyderabad is Seismic Zone II in the IS 1893 (Part 1):2002 town list, the lowest zone in that scheme. Flood drainage is the more relevant site check, given the October 2020 floods. ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([The Times of India](https://timesofindia.indiatimes.com/city/hyderabad/at-324-mm-greater-hyd-scores-one-day-maximum-after-20-years/articleshow/78670445.cms))

## Sources

- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Cushman & Wakefield: [India Data Center Market Overview H1 2025](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)
- Telangana Today: [Hyderabad emerges as India’s fast-growing hyperscale data centre hub (Knight Frank)](https://telanganatoday.com/hyderabad-emerges-as-indias-fast-growing-hyperscale-data-centre-hub)
- Amazon: [AWS launches second infrastructure region in India](https://press.aboutamazon.com/in/2022/11/aws-launches-second-infrastructure-region-in-india)
- Microsoft: [Microsoft establishes India South Central region as a strategic hub](https://news.microsoft.com/source/asia/2026/09/21/ai-ambition-into-action-microsoft-brings-ai-ready-capabilities-across-its-india-cloud-infrastructure-establishes-india-south-central-region-as-a-strategic-hub-for-asia-and-global-south/)
- ANI: [Hyderabad emerging as major AI data centre hub: Telangana official](https://www.aninews.in/news/business/hyderabad-emerging-as-major-ai-data-centre-hub-with-usd-10-20-billion-investments-in-pipeline-telangana-govt-official20260528202824/)
- Deccan Chronicle: [Telangana targets 5 GW data centre capacity by 2029 as Microsoft opens Hyderabad region](https://www.deccanchronicle.com/amp/southern-states/telangana/telangana-targets-5gw-data-centre-capacity-by-2029-as-microsoft-opens-hyderabad-region-1990282)
- Deccan Herald: [India set for five times surge in its data centre capacity by 2030 (Crisil Ratings)](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- The Times of India: [At 324 mm, Greater Hyderabad scores one-day maximum after 20 years](https://timesofindia.indiatimes.com/city/hyderabad/at-324-mm-greater-hyd-scores-one-day-maximum-after-20-years/articleshow/78670445.cms)
- The Times of India: [Telangana rains: death toll goes up to 70](https://timesofindia.indiatimes.com/city/hyderabad/telangana-rains-death-toll-goes-up-to-70-government-on-alert-with-fresh-spell-forecast/articleshow/78749477.cms)
- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- CtrlS: [CtrlS unveils plans for new data center park on 40-acre land parcel near Hyderabad](https://www.ctrls.com/press-release-ctrls-unveils-plans-for-new-datacenter-park-on-a-40-acre-land-parcel-near-hyderabad/)
- Telangana Electricity Regulatory Commission: [GTCS amendment: voltage of supply by contracted demand (19 October 2022)](https://tgerc.telangana.gov.in/file_upload/uploads/Clarifications/GTCS%20Amendment_19102022.pdf)
- Telangana Electricity Regulatory Commission: [Retail supply tariff order FY 2024-25 (28 October 2024)](https://tgerc.telangana.gov.in/file_upload/uploads/Tariff%20Orders/Current%20Year%20Orders/2024/FY24-25%20RST%20Order.pdf)
- The Hans India: [No power tariff hike for 2026-27: TGERC](https://www.thehansindia.com/telangana/no-power-tariff-hike-for-202627-tgerc-1061820)
- ThePrint: [Telangana secures Amazon’s biggest India data centre project](https://theprint.in/india/governance/telangana-secures-amazons-biggest-india-data-centre-project-months-after-google-announced-ai-hub-in-ap/2987492/)
- Central Ground Water Authority, Ministry of Jal Shakti: [Guidelines to regulate and control ground water extraction in India (24 September 2020)](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)
- Airports Authority of India: [NOCAS frequently asked questions (height clearance under GSR 751(E))](https://nocas2.aai.aero/nocas/FAQ.html)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Telangana data centre policy: the 2016 policy, incentives and Hyderabad (2026)](https://invariant-ai.com/blog/telangana-data-centre-policy)
- [Mumbai vs Chennai vs Hyderabad for data centres: power, policy and risk (2026)](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Data centres in Visakhapatnam: Google’s AI hub, gigawatt campuses and risks (2026)](https://invariant-ai.com/blog/data-centres-in-visakhapatnam)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)