# Data centres in India: capacity, cities, companies, policy and power (2026)

> India had about 1.6 to 1.8 GW of live data centre capacity in mid-2026, half of it in Mumbai. Data centre counts by city, the operators, policy and power supply.

URL: https://invariant-ai.com/blog/data-centres-in-india  
Published: 2026-11-21 · Publisher: Invariant · Region: India

India had between 1.6 GW and 1.8 GW of operational data centre capacity in mid-2026, according to JLL, Cushman & Wakefield and Savills, and Cushman & Wakefield counted 147 data centres in the top seven cities. The estimates differ partly because each publisher counts different facilities. The government told Parliament in August 2026 that capacity had grown from 375 MW in 2020 to about 1,575 MW. Mumbai holds about half. A further 509 MW was under construction and 3,351 MW planned in H1 2026, and forecasts for 2030 run from about 5.6 GW to 8 GW. Crisil Ratings says the pace will hinge on timely power connectivity, regulatory approvals and project execution.

## Key points

- India’s live data centre capacity in mid-2026 was about 1.6 GW on JLL’s count, 1,789 MW on Cushman & Wakefield’s (top seven cities) and 1,819 MW of IT load on Savills’ count; CBRE expects 2 GW by the end of 2026.
- Mumbai holds about 50% of India’s operational data centre capacity, followed by Chennai (12%), Delhi NCR (10%), Bengaluru (9%), Hyderabad (8%), Pune (7%) and Kolkata (2%), according to Cushman & Wakefield for H1 2026.
- NTT had the largest operator share in H1 2026 at 21%, ahead of Sify and STT GDC at 19% each, according to Anarock.
- India still has no notified national data centre policy. Data centres of 5 MW IT load or more have had infrastructure status since 2022, and Budget 2026-27 added a tax holiday to 2047 for foreign cloud firms using Indian data centre services.
- The Central Electricity Authority estimates data centre power demand of about 17 GW by 2031-32.

## India data centres in numbers (as of 21 November 2026)

| Measure | Figure | Source and period |
| --- | --- | --- |
| Operational capacity (government estimate) | About 1,575 MW, up from 375 MW in 2020 | Rajya Sabha reply, 7 August 2026 |
| Operational capacity (top seven cities) | 1,789 MW in 147 data centres, 33 operators | Cushman & Wakefield, H1 2026 |
| Under construction | 509 MW | Cushman & Wakefield, H1 2026 |
| Planned, to 2030 | 3,351 MW (3,860 MW upcoming in total) | Cushman & Wakefield, H1 2026 |
| Expected by end-2026 | 2 GW | CBRE, as reported by IBEF, October 2026 |
| Colocation vacancy | 14.9% (Mumbai 7.9%) | Cushman & Wakefield, H1 2026 |
| Largest market | Mumbai, 890 MW (about 50%) | Cushman & Wakefield, H1 2026 |
| Power demand outlook | About 17 GW by 2031-32 | Central Electricity Authority, via PIB |
| Share of national power capacity | Less than 1% | Government statement, August 2026 |
| States with dedicated data centre policies | 11 | Invest India and Cushman & Wakefield, as of September 2026 |

Sources: ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([IBEF](https://www.ibef.org/news/india-likely-to-add-more-than-200-mw-of-new-data-centre-capacity-in-h2-2026-pushing-total-capacity-to-2-gw-cbre)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

The government figure and the broker figures measure slightly different things. A parliamentary committee report, as reported by MediaNama, records that MeitY maintains no official data on data centre capacity, so every capacity number here, including the official one, is an estimate with a stated basis. ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108)) ([MediaNama](https://www.medianama.com/2026/10/223-meity-data-centre-parliament-panel-mea/))

## India’s data centre capacity in 2026, by research house

Five research houses published estimates of India’s live data centre capacity for H1 2026. They agree on the order of magnitude and disagree on the last few hundred MW, partly because they count different things: SBI counts only colocation, Cushman & Wakefield counts colocation and hyperscale cloud in the top seven cities but excludes captive facilities, and Savills includes enterprise and edge facilities. ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/))

| Publisher | Live capacity | Period | What it counts |
| --- | --- | --- | --- |
| JLL | About 1.6 GW | Mid-2026 | Not stated |
| Cushman & Wakefield | 1,789 MW | H1 2026 | Top seven cities, colocation plus hyperscale cloud, excludes captive |
| Savills | 1,819 MW IT | H1 2026 | All segments including edge and enterprise |
| Anarock | More than 1.8 GW | H1 2026 | Not stated |
| CBRE | 2 GW expected | End-2026 | Not stated |
| SBI CHAKRA | About 1.5 GW | 2025 | Colocation only |

Sources: ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([IBEF](https://www.ibef.org/news/india-likely-to-add-more-than-200-mw-of-new-data-centre-capacity-in-h2-2026-pushing-total-capacity-to-2-gw-cbre)) ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866))

India added between 85 MW (JLL) and 178 MW (Cushman & Wakefield) of capacity in H1 2026, or 258 MW of IT load on Savills’ count. Hyperscalers took more than 80% of absorption in the half, and pre-leased capacity roughly doubled to 1.15 GW. ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

## India’s data centre capacity forecast to 2030

Forecasts for India’s data centre capacity at the end of the decade run from 5,649 MW by end-2030, if Cushman & Wakefield’s pipeline is delivered, to about 8 GW in its AI scenario; JLL, SBI CHAKRA, Anarock, Savills and Crisil Ratings fall in between. ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)) ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631))

| Publisher | Forecast | Horizon |
| --- | --- | --- |
| Cushman & Wakefield (pipeline delivered) | 5,649 MW | End-2030 |
| JLL | About 6 GW | 2029 |
| SBI CHAKRA | More than 6.5 GW | 2030 |
| Anarock | More than 6.7 GW | 2030 |
| Savills | More than 7 GW IT | 2030 |
| Crisil Ratings | About 7.5 GW | March 2030 |
| Cushman & Wakefield (AI scenario) | About 8 GW | End-2030 |

Sources: ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)) ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631))

Crisil expects about three quarters of the roughly 6 GW now upcoming to sit in Visakhapatnam, Mumbai and Hyderabad, and the hyperscaler share of leased capacity to rise from 60 to 65% in FY26 to 75 to 80% by FY30. Crisil also reports that contract tenors have lengthened to 15 to 20 years. ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631))

## Where India’s data centres are: capacity by city

Mumbai and Navi Mumbai held 890 MW, about half of India’s operational data centre capacity, in H1 2026, according to Cushman & Wakefield. Chennai was second with 214 MW, followed by Delhi NCR, Bengaluru, Hyderabad, Pune and Kolkata. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

| City | Operational MW (H1 2026) | Share of operational | Share of upcoming | Colocation vacancy |
| --- | --- | --- | --- | --- |
| Mumbai and Navi Mumbai | 890 | 50% | 45% | 7.9% |
| Chennai | 214 | 12% | 9% | 26.7% |
| Delhi NCR | 183 | 10% | 10% | 10.9% |
| Bengaluru | 162 | 9% | 3% | 28.0% |
| Hyderabad | 151 | 8% | 18% | 28.0% |
| Pune | 133 | 7% | 7% | 22.1% |
| Kolkata | 22 | 2% | 2% | 19.4% |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

Mumbai has 13 cable landing stations, with two more due in 2026, and its Thane-Belapur Road cluster alone holds 675 MW in operation. Hyderabad has the second-largest share of upcoming supply. Cushman & Wakefield maps more than 4 GW of early-stage or announced capacity at Visakhapatnam and more than 1 GW at Jamnagar in Gujarat. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

**City guides:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

## Largest data centre operators in India

NTT had the largest share of India’s data centre market in H1 2026, according to Anarock. Its operator shares for the half: NTT 21%, Sify 19%, STT GDC 19%, Nxtra (Airtel) 15%, CtrlS 15%, Yotta 5%, Princeton Digital 3%, Iron Mountain (Web Werks) 2% and AdaniConneX 1%. Hyperscalers also build their own campuses. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

| Commitment | Amount | Announced |
| --- | --- | --- |
| Google AI hub, Visakhapatnam (gigawatt-scale) | About US$15 bn over 2026 to 2030 | 14 October 2025 |
| Microsoft, cloud and AI infrastructure, skilling and operations | US$17.5 bn over 2026 to 2029 | 9 December 2025 |
| Amazon, all India businesses (includes US$13 bn added for AI and cloud infrastructure) | US$48 bn for 2026 to 2030 | 25 June 2026 |

Sources: ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([Microsoft](https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/)) ([Amazon](https://www.aboutamazon.com/news/company-news/amazon-india-investment))

**Operators and investment:** [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india)

## Data centre policy in India: national, tax and state rules

India has no notified national data centre policy. MeitY issued a draft in November 2020 that was never notified, and revived consultations in August 2025. On 14 October 2026 NITI Aayog released a Data Centre Evaluation Framework, described as a guidance document, that asks each state to publish a data centre approval matrix and bring clearances onto one digital interface. ([S&R Associates](https://www.snrlaw.in/indian-budget-2026-27-tax-incentives-for-data-centres/)) ([BW Legal World](https://www.bwlegalworld.com/article/meity-resumes-national-data-centre-policy-talks-experts-seek-global-alignment-567223)) ([MediaNama](https://www.medianama.com/2026/10/223-niti-aayog-meity-data-centre-evaluation/))

- Infrastructure status: data centres of at least 5 MW IT load were added to the Harmonised Master List under Communication on 11 October 2022; Anarock says the status has improved access to long-tenor financing.
- Tax: Budget 2026-27, enacted through the Finance Act 2026, exempts foreign cloud companies from tax from tax year 2026-27 to 2046-47 on income from serving global customers using Indian data centre services; a 15% cost safe harbour applies where the Indian provider is related.
- States: as of September 2026, 11 states had dedicated data centre policies in force. Priority incentives include land concessions, stamp duty and electricity duty exemptions and single-window facilitation.

Sources: ([Ministry of Finance, Department of Economic Affairs](https://www.pppinindia.gov.in/report/Harmonised%20Master%20list%20of%20Infrastruture%20sub%20sectors%202022_1685079764.pdf)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2221894)) ([PIB](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2227953)) ([S&R Associates](https://www.snrlaw.in/indian-budget-2026-27-tax-incentives-for-data-centres/)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

Data localisation rules also drive demand: RBI requires payment system data to be stored only in India (2018); SEBI requires regulated entities’ cloud data to stay within India (2023); CERT-In requires 180 days of logs kept in India and five years of subscriber records from data centres (2022); and the DPDP Rules 2025, notified in November 2025 with an 18-month phased compliance timeline, require significant data fiduciaries to comply with government-specified restrictions on certain data, including localisation where required. ([Reserve Bank of India](https://www.rbi.org.in/Scripts/NotificationUser.aspx?Id=11244&Mode=0)) ([SEBI](https://www.sebi.gov.in/legal/circulars/mar-2023/framework-for-adoption-of-cloud-services-by-sebi-regulated-entities-res-_68740.html)) ([CERT-In](https://www.cert-in.org.in/PDF/CERT-In_Directions_70B_28.04.2022.pdf)) ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2190014))

**Policy and approvals:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india)

## How India’s data centres get power

Data centre capacity is less than 1% of India’s installed power capacity, the government told Parliament in August 2026, but the Central Electricity Authority puts data centre power demand at about 17 GW by 2031-32. Locally the numbers are already large: Crisil estimates that by FY2030 data centre capacity could equal about 60% of Mumbai’s current peak demand and about 80% of Visakhapatnam’s. ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108)) ([Deccan Herald](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631))

Structure Research reports that MSEDCL has allocated about 6 GW of grid capacity to data centres in Navi Mumbai and that committed and under-construction capacity is approaching that threshold, pushing new builds to Panvel, Taloja and Rasayani, where separate substation infrastructure can be commissioned. For a site buyer, the document behind the MW and the date of the connection matter more than distance to a line. ([Structure Research](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/))

**Power guides:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india)

## Data centre construction cost, rents and land prices in India

Building a data centre in India costs US$7.4 million per MW on Cushman & Wakefield’s benchmark, about 23% below Malaysia, and the firm uses US$9.0 million per MW for incremental AI capacity. SBI’s sector report gives ₹50 to 55 crore per MW for an air-cooled Tier III, non-AI build and up to ₹75 crore for AI facilities with immersion cooling or Tier IV. ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866))

Wholesale colocation for 5 MW and above was quoted at ₹6,000 to 7,500 per kW per month in Mumbai in H1 2025, Cushman & Wakefield’s latest rent table (its H1 2026 report has none). Anarock puts land for 100 to 500 MW parks at ₹3 to 10 crore per acre and for small suburban Mumbai sites at ₹35 to 60 crore. ([Cushman & Wakefield](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

**Cost, land and sites:** [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india)

## AI data centres and GPUs in India

India’s IndiaAI Mission had onboarded more than 38,000 GPUs, offered at ₹65 per hour, by February 2026. Announced AI campuses include Google’s AI hub in Visakhapatnam, Reliance’s multi-gigawatt build at Jamnagar and TCS HyperVault, whose first customer is OpenAI. Anarock puts an Nvidia H100 GPU cluster at 30 to 60 kW per rack against 8 to 10 kW traditionally. ([PIB](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2225781)) ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([TechCrunch](https://techcrunch.com/2026/02/19/reliance-unveils-110b-ai-investment-plan-as-india-ramps-up-tech-ambitions/)) ([TechCrunch](https://techcrunch.com/2026/02/18/openai-taps-tata-for-100mw-ai-data-center-capacity-in-india-eyes-1gw/)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

## How Invariant helps

For a site or a shortlist in India, Invariant checks how the site gets power (the discom or transmission connection, the open access route and the nearest substations), screens seismic zone, flood history, groundwater status and airport height limits, and maps the central and state approvals the project needs with the authority behind each. Send the state, the MW and the date you need power.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How many data centres are there in India?

India had 147 operational data centres in its top seven cities in H1 2026, run by 33 operators, according to Cushman & Wakefield. Anarock counted 164 operational data centres. By capacity, India had about 1.6 to 1.8 GW live in mid-2026. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([JLL](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers))

### What is the total data centre capacity in India in 2026?

Estimates run from about 1,575 MW (government, August 2026) to 1,819 MW of IT load (Savills, H1 2026). Cushman & Wakefield counts 1,789 MW across the top seven cities in H1 2026, and CBRE expects 2 GW by the end of 2026. ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([IBEF](https://www.ibef.org/news/india-likely-to-add-more-than-200-mw-of-new-data-centre-capacity-in-h2-2026-pushing-total-capacity-to-2-gw-cbre))

### How much data centre capacity is under construction in India?

Cushman & Wakefield counted 509 MW under construction in H1 2026, with 3,351 MW more planned to 2030, or 3,860 MW upcoming in total. Mumbai has 45% of the upcoming supply and Hyderabad 18%. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### Which city has the most data centres in India?

Mumbai has the most, with 890 MW in H1 2026, about half of the operational capacity in India’s top seven cities, most of it in Navi Mumbai along Thane-Belapur Road. Chennai is second with 214 MW. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### Which state has the most data centres in India?

Maharashtra: Mumbai (50%) and Pune (7%) together hold more than half of the operational capacity in India’s top seven cities on Cushman & Wakefield’s H1 2026 count. Chennai in Tamil Nadu is next at 12%. For pipeline, Hyderabad has the second-largest share of upcoming supply (18%), and more than 4 GW of early-stage or announced capacity is mapped at Visakhapatnam in Andhra Pradesh. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

### Does India have a national data centre policy?

India has no notified national data centre policy. MeitY’s 2020 draft was never notified and consultations were revived in August 2025. National measures in force include infrastructure status for data centres of 5 MW IT load or more (2022) and the Budget 2026-27 tax holiday for foreign cloud firms using Indian data centres, enacted through the Finance Act 2026. ([S&R Associates](https://www.snrlaw.in/indian-budget-2026-27-tax-incentives-for-data-centres/)) ([BW Legal World](https://www.bwlegalworld.com/article/meity-resumes-national-data-centre-policy-talks-experts-seek-global-alignment-567223)) ([Ministry of Finance, Department of Economic Affairs](https://www.pppinindia.gov.in/report/Harmonised%20Master%20list%20of%20Infrastruture%20sub%20sectors%202022_1685079764.pdf)) ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2221894))

### How much electricity will Indian data centres need?

About 17 GW by 2031-32, according to the Central Electricity Authority’s estimate of data centre power demand. Current data centre capacity is less than 1% of India’s installed power capacity. ([PIB, Ministry of Electronics and IT](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108))

### How much does it cost to build a data center in India per MW?

About US$7.4 million per MW on Cushman & Wakefield’s benchmark, which excludes land. SBI’s sector report gives ₹50 to 55 crore per MW for an air-cooled Tier III build and up to ₹75 crore for AI or Tier IV builds. ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([SBI CHAKRA](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866))

### Who are the largest data centre operators in India?

NTT had the largest share in H1 2026 at 21%, according to Anarock, followed by Sify and STT GDC at 19% each and Nxtra (Airtel) and CtrlS at 15% each. Hyperscalers also build their own campuses. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

### What are the largest data centre projects in India?

Announced gigawatt-scale campuses include Google’s AI hub in Visakhapatnam (about US$15 billion over 2026 to 2030) and Reliance’s multi-gigawatt build at Jamnagar. Cushman & Wakefield maps more than 4 GW of early-stage or announced capacity in Visakhapatnam alone. ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([TechCrunch](https://techcrunch.com/2026/02/19/reliance-unveils-110b-ai-investment-plan-as-india-ramps-up-tech-ambitions/)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

## Sources

- PIB, Ministry of Electronics and IT: [Installed data centre capacity and CEA demand estimate (Rajya Sabha reply, 7 August 2026)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2298108)
- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Invest India and Cushman & Wakefield: [India's Data Centre Growth Story (October 2026)](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)
- JLL: [India data centres, 2026 mid-year report](https://www.jll.com/en-in/insights/market-dynamics/india-data-centers)
- IBEF: [India likely to add more than 200 MW in H2 2026, pushing total capacity to 2 GW (CBRE)](https://www.ibef.org/news/india-likely-to-add-more-than-200-mw-of-new-data-centre-capacity-in-h2-2026-pushing-total-capacity-to-2-gw-cbre)
- Communications Today: [India's data centre capacity additions jump 59% in H1 2026 (Savills)](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)
- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- SBI CHAKRA: [Data Centres in India, sector report (April 2026)](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)
- Ministry of Finance, Department of Economic Affairs: [Harmonised Master List of Infrastructure Sub-sectors, notification of 11 October 2022](https://www.pppinindia.gov.in/report/Harmonised%20Master%20list%20of%20Infrastruture%20sub%20sectors%202022_1685079764.pdf)
- PIB, Ministry of Electronics and IT: [Budget 2026-27: tax holiday for foreign cloud companies using Indian data centres](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2221894)
- Reserve Bank of India: [Storage of payment system data (6 April 2018)](https://www.rbi.org.in/Scripts/NotificationUser.aspx?Id=11244&Mode=0)
- SEBI: [Framework for adoption of cloud services by SEBI regulated entities (6 March 2023)](https://www.sebi.gov.in/legal/circulars/mar-2023/framework-for-adoption-of-cloud-services-by-sebi-regulated-entities-res-_68740.html)
- CERT-In: [Directions under section 70B(6) of the IT Act (28 April 2022)](https://www.cert-in.org.in/PDF/CERT-In_Directions_70B_28.04.2022.pdf)
- PIB, Ministry of Electronics and IT: [DPDP Rules 2025 notified (14 November 2025)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2190014)
- Structure Research: [Mumbai and Pune data centre report 2026](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/)
- PIB: [Democratising AI in India (10 February 2026)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2225781)
- Cushman & Wakefield: [India Data Centre Market Overview H1 2025 (rent tables)](https://assets.cushmanwakefield.com/-/media/cw/apac/india/insights/indiadatacentreupdateh12025v4.pdf?rev=4a5dd53b2388421ea3935afb03302def)
- Google: [Our first AI hub in India, powered by a $15 billion investment](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)
- Microsoft: [Microsoft invests US$17.5 billion in India](https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/)
- Amazon: [Amazon India investment (US$48 billion for 2026 to 2030)](https://www.aboutamazon.com/news/company-news/amazon-india-investment)
- MediaNama: [NITI Aayog and MeitY data centre evaluation framework](https://www.medianama.com/2026/10/223-niti-aayog-meity-data-centre-evaluation/)
- S&R Associates: [Indian Budget 2026-27: tax incentives for data centres](https://www.snrlaw.in/indian-budget-2026-27-tax-incentives-for-data-centres/)
- PIB: [Budget 2026-27 backgrounder on the data centre tax holiday (14 February 2026)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2227953)
- MediaNama: [MeitY tells parliamentary panel it maintains no data centre capacity data](https://www.medianama.com/2026/10/223-meity-data-centre-parliament-panel-mea/)
- BW Legal World: [MeitY resumes national data centre policy talks](https://www.bwlegalworld.com/article/meity-resumes-national-data-centre-policy-talks-experts-seek-global-alignment-567223)
- TechCrunch: [Reliance unveils $110B AI investment plan](https://techcrunch.com/2026/02/19/reliance-unveils-110b-ai-investment-plan-as-india-ramps-up-tech-ambitions/)
- TechCrunch: [OpenAI taps Tata for 100 MW AI data center capacity in India, eyes 1 GW](https://techcrunch.com/2026/02/18/openai-taps-tata-for-100mw-ai-data-center-capacity-in-india-eyes-1gw/)
- Deccan Herald: [India set for five times surge in its data centre capacity by 2030 (Crisil Ratings)](https://www.deccanherald.com/business/india-set-for-five-times-surge-in-its-data-centre-capacity-by-2030-4205631)

## Related

- [Data centre companies in India: the largest operators and recent deals (2026)](https://invariant-ai.com/blog/data-centre-companies-india)
- [Data centre policy in India: state data centre policies compared (2026)](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Data centres in Mumbai and Navi Mumbai: capacity, sub-markets and power (2026)](https://invariant-ai.com/blog/data-centres-in-mumbai)
- [How to find a data centre site in India: power, fibre, land and risk (2026)](https://invariant-ai.com/blog/find-data-centre-site-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)