# Data centres in Noida and Delhi NCR: Greater Noida, YEIDA and Gurugram (2026)

> Noida had 156 MW of the 183 MW of operational data centre capacity in Delhi NCR in H1 2026 (Cushman & Wakefield). UP’s 2026 policy and Jewar airport shape new sites.

URL: https://invariant-ai.com/blog/data-centres-in-noida  
Published: 2026-11-21 · Publisher: Invariant · Region: Delhi NCR, India

Delhi NCR had 183 MW of operational data centre capacity in H1 2026, about 10% of India’s top seven cities, according to Cushman & Wakefield, and Noida held 156 MW of it in 12 facilities. NCR is India’s third data centre market on that count, with 360 MW planned; Gurugram has 18 MW. YEIDA lists a 100-acre Data Centre Park in Sector 28 on the Yamuna Expressway. The Uttar Pradesh Data Centre Policy 2026, notified on 9 July 2026, sets the incentives, and Noida International Airport, which began commercial operations on 15 June 2026, has advised that construction within 20 km needs an AAI height clearance.

## Key points

- Delhi NCR had 183 MW operational, 27 MW under construction and 360 MW planned in H1 2026; Noida had 156 MW and 1,247 MW at early stage (Cushman & Wakefield).
- UP Data Centre Policy 2026 (G.O. 536/78-2-2026, 9 July 2026): base FAR 3.0 plus 1.0 chargeable, 25% land subsidy in Paschimanchal including Gautam Buddha Nagar, 100% stamp duty exemption on land from government authorities.
- Delhi is Seismic Zone IV in IS 1893 (Part 1):2002, a higher design load than Mumbai or Chennai.
- Noida International Airport began commercial operations on 15 June 2026; its July 2025 advisory requires AAI height clearance for construction within 20 km.

## Delhi NCR data centre market: key facts (H1 2026)

| Item | Figure and period |
| --- | --- |
| Operational capacity | 183 MW in 19 data centres, about 10% of top seven cities (Cushman & Wakefield, H1 2026); 191 MW IT (Savills) |
| Noida | 156 MW in 12 data centres; 21 MW under construction; 223 MW planned; 1,247 MW early stage |
| Gurugram | 18 MW in 2 data centres |
| Colocation vacancy | 10.9% (Cushman & Wakefield, H1 2026) |
| State policy | UP Data Centre Policy 2026, G.O. dated 9 July 2026 |
| Land | YEIDA Data Centre Park, Sector 28: 100 acres |
| Physical risk note | Seismic Zone IV (Delhi, IS 1893 Part 1:2002); Noida International Airport height limits |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([Yamuna Expressway Industrial Development Authority](https://www.yamunaexpresswayauthority.com/property/industrial)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([Business Standard](https://www.business-standard.com/industry/aviation/commercial-operations-begin-at-noida-int-l-airport-with-bengaluru-flight-126061500112_1.html))

Anarock counts Delhi NCR at 179 MW IT across 18 facilities and forecasts 550 MW by 2030. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf))

## Noida and NCR data centre sub-markets: Noida Expressway, Greater Noida, YEIDA and Gurugram

Anarock’s NCR data centre zones include the Noida Expressway corridor (Sectors 62, 132, 142, 143 and 150 to 167), the Greater Noida corridor (Knowledge Park, Tech Zone, Pari Chowk), the Yamuna Expressway and Jewar corridor under YEIDA, and the Gurugram-Manesar belt. Its project list includes Yotta’s Greater Noida campus, NTT in Sector 142, STT GDC in Sector 143, Sify in Sector 132 and AdaniConneX in Sectors 62 and 80. Yotta lists 30 MW of IT load at its D1 building in Greater Noida. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Yotta](https://yotta.com/data-center-in-india/))

YEIDA lists a 100-acre Data Centre Park in Sector 28, the same sector as its Medical Devices Park. AdaniConneX lists 150 MW of potential capacity in Noida, and AM Green signed an MoU with Uttar Pradesh in January 2026 for a 1 GW AI data centre in the Greater Noida region, with first capacity targeted for 2028. ([Yamuna Expressway Industrial Development Authority](https://www.yamunaexpresswayauthority.com/property/industrial)) ([AdaniConneX](https://www.adaniconnex.com/data-centers)) ([Communications Today](https://www.communicationstoday.co.in/uttar-pradesh-signs-mou-with-am-green-group-for-1-gw-ai-data-centre/))

## UP Data Centre Policy 2026: subsidies, FAR and power incentives

Uttar Pradesh notified its Data Centre Policy 2026 by G.O. 536/78-2-2026 dated 9 July 2026, repealing the 2021 policy. Parks are 40 MW or more; units are above 2 MW and below 40 MW. Parks get an interest subsidy with an overall ceiling of Rs 50 crore and a dual-grid subsidy; units get a capital subsidy with a ceiling of Rs 20 crore. Booster incentives can raise both ceilings. ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([Invest UP](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/))

- Land subsidy of 25% of prevailing sector rates on land from state agencies in Madhyanchal and Paschimanchal; Gautam Buddha Nagar is listed in Paschimanchal.
- 100% stamp duty exemption on purchase or lease from a government authority, against a bank guarantee released at commencement of commercial operation.
- Base FAR 3.0 free plus 1.0 chargeable; basement parking, storage and DG set space sit outside FAR, rooftop chillers can be installed without counting in FAR, and ground coverage is up to 60% or as per byelaws.
- Units get a 100% electricity duty exemption for 10 years. Wheeling and transmission charges on intrastate purchase are 50% exempt (75% for renewable power from within the state), and 100% exempt on the intrastate system for interstate purchase, for 25 years, until the first eight parks or 2 GW.
- Data centres are classified as an essential service under ESMA, and the state agency assesses water availability before allotting land.

Sources: ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf))

Gurugram and Manesar are in Haryana, so Uttar Pradesh’s terms do not apply there. Compare both states’ terms for an NCR search; the right answer depends on load size and the power route.

## Power and water for data centres in Noida and NCR

Under the UP Supply Code, contracted loads above 10,000 kVA are supplied at 132 kV or 220 kV, and supply on an independent feeder depends on technical feasibility and bay or corridor availability at the substation. UPERC’s FY 2026-27 order prices HV-2 large and heavy power, which covers IT and ITeS units decided by the state through a policy notification, at Rs 6.10 per kVAh above 132 kV and Rs 6.40 above 66 kV up to 132 kV in urban areas, plus Rs 270 per kVA per month. ([DVVNL](https://www.dvvnl.org/UploadFiles/electricityAct/The-Electricity-Act-2005.pdf)) ([Uttar Pradesh Electricity Regulatory Commission](https://www.uperc.org/App_File/UPPCLTariffOrder-pdf72202630517PM.pdf))

The UP policy reimburses the cost of one grid in a dual-grid connection for parks and cuts wheeling and transmission charges, which matters for green open access contracts. Ask for the specific substation and the DISCOM’s sanction letter; sector-level claims of available power do not tell you what is left for a new load. ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf))

Groundwater is a harder constraint. CGWA guidelines bar groundwater NOCs for new industries other than MSMEs in over-exploited assessment units, and SBI lists Gurugram among the water-stressed data centre metros. Plan for treated wastewater or air and closed-loop cooling. ([Central Ground Water Authority, Ministry of Jal Shakti](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)) ([SBI CHAKRA Centre of Excellence](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866))

## Data centre site risks in Noida and NCR

- Seismic: Delhi is Zone IV (zone factor 0.24) in the IS 1893 (Part 1):2002 town list, a higher design load than Mumbai, Chennai or Hyderabad. Confirm the zone for the specific YEIDA sector.
- Airport: Noida International Airport at Jewar began commercial operations on 15 June 2026. In July 2025 the airport advised that no construction or tree planting proceed within 20 km without a height clearance or NOC from AAI.

Sources: ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([Business Standard](https://www.business-standard.com/industry/aviation/commercial-operations-begin-at-noida-int-l-airport-with-bengaluru-flight-126061500112_1.html)) ([ThePrint (PTI)](https://theprint.in/india/height-restrictions-put-in-place-within-20-km-radius-of-noida-airport/2687943/))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In NCR the groundwater unit and the Jewar height surface are checked alongside the power route.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much data centre capacity does Noida have?

Noida had 156 MW of operational data centre capacity in H1 2026, out of 183 MW across Delhi NCR, according to Cushman & Wakefield. Another 1,247 MW was at early stage in Noida. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### What is the YEIDA data centre park?

The YEIDA Data Centre Park is a 100-acre site in Sector 28 on the Yamuna Expressway. YEIDA lists it in its available land bank alongside its Medical Devices Park in the same sector. ([Yamuna Expressway Industrial Development Authority](https://www.yamunaexpresswayauthority.com/property/industrial))

### What incentives does the UP Data Centre Policy 2026 offer?

The UP Data Centre Policy 2026 offers capital and interest subsidies, land and stamp duty concessions, and electricity duty and wheeling and transmission charge exemptions. Parks get an interest subsidy with a Rs 50 crore ceiling and units a capital subsidy with a Rs 20 crore ceiling. Land from state agencies in Madhyanchal and Paschimanchal gets a 25% subsidy, land from government authorities a 100% stamp duty exemption, and units 10 years of electricity duty exemption. ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([Invest UP](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/))

### Is Noida a good location for a data center?

Noida offers proximity to the national capital, extensive fibre connectivity and access to large development land, according to Anarock, and the UP policy adds incentives. The site checks are groundwater, Seismic Zone IV design and height limits near the new Jewar airport. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Government of Uttar Pradesh](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([ThePrint (PTI)](https://theprint.in/india/height-restrictions-put-in-place-within-20-km-radius-of-noida-airport/2687943/))

### Which companies run data centres in Noida?

Anarock lists Yotta, NTT, STT GDC, Sify and AdaniConneX projects in Noida and Greater Noida. AM Green has an MoU for a 1 GW AI data centre in the Greater Noida region. ([Anarock](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)) ([Communications Today](https://www.communicationstoday.co.in/uttar-pradesh-signs-mou-with-am-green-group-for-1-gw-ai-data-centre/))

### Do I need an AAI height clearance near Noida International Airport?

Yes, within 20 km of the airport. In July 2025 Noida International Airport advised that no construction or tree planting proceed within 20 km without a height clearance or NOC from AAI. The airport began commercial operations on 15 June 2026. ([ThePrint (PTI)](https://theprint.in/india/height-restrictions-put-in-place-within-20-km-radius-of-noida-airport/2687943/)) ([Business Standard](https://www.business-standard.com/industry/aviation/commercial-operations-begin-at-noida-int-l-airport-with-bengaluru-flight-126061500112_1.html))

## Sources

- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Communications Today: [India's data centre capacity additions jump 59% in H1 2026 (Savills India)](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)
- Government of Uttar Pradesh: [Uttar Pradesh Data Centre Policy 2026 (G.O. 536/78-2-2026, 9 July 2026)](https://uplc.up.gov.in/downloadmedia/siteContent/202608230935077722DC-policy-2026-English_230826.pdf)
- Yamuna Expressway Industrial Development Authority: [Industrial property and Data Centre Park, Sector 28](https://www.yamunaexpresswayauthority.com/property/industrial)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- Business Standard: [Commercial operations begin at Noida International Airport](https://www.business-standard.com/industry/aviation/commercial-operations-begin-at-noida-int-l-airport-with-bengaluru-flight-126061500112_1.html)
- Anarock: [Data Centre: The Blueprint of the Digital Fortress in India (2026)](https://websitemedia.anarock.com/media/Data_centre_The_blueprint_of_the_digital_fortress_in_India_2026_b36407b0b2.pdf)
- Yotta: [Data centers in India](https://yotta.com/data-center-in-india/)
- AdaniConneX: [Data centers](https://www.adaniconnex.com/data-centers)
- Communications Today: [Uttar Pradesh signs MoU with AM Green Group for 1 GW AI data centre](https://www.communicationstoday.co.in/uttar-pradesh-signs-mou-with-am-green-group-for-1-gw-ai-data-centre/)
- Invest UP: [Uttar Pradesh Data Centre Policy 2026](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/)
- DVVNL: [UP Electricity Supply Code 2005: salient features](https://www.dvvnl.org/UploadFiles/electricityAct/The-Electricity-Act-2005.pdf)
- Uttar Pradesh Electricity Regulatory Commission: [UPPCL tariff order FY 2026-27 (2 July 2026)](https://www.uperc.org/App_File/UPPCLTariffOrder-pdf72202630517PM.pdf)
- Central Ground Water Authority, Ministry of Jal Shakti: [Guidelines to regulate and control ground water extraction in India (24 September 2020)](https://neer.co.in/wp-content/uploads/2022/07/ANNEXURE-2-CGWA-GUIDELINES-FOR-WEBSITE-1.pdf)
- SBI CHAKRA Centre of Excellence: [Data Centres in India: sector report (April 2026)](https://sbi.bank.in/documents/57189647/58231607/Sector+Report+DataCentre.pdf/f1919592-ee66-b50b-ea20-75fbb27c9bb5?t=1779885206866)
- ThePrint (PTI): [Height restrictions put in place within 20 km radius of Noida airport](https://theprint.in/india/height-restrictions-put-in-place-within-20-km-radius-of-noida-airport/2687943/)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Uttar Pradesh data centre policy 2026: parks, capital subsidy and power incentives](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy)
- [Haryana data centre policy 2026: capex and opex support and the 2022 policy](https://invariant-ai.com/blog/haryana-data-centre-policy)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Water for data centres in India: groundwater NOC, water stress and state rules](https://invariant-ai.com/blog/data-centre-water-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)