# Data centres in Pune: capacity, Hinjewadi, PBD North and power (2026)

> Pune had 133 MW of operational data centre capacity in H1 2026, per Cushman & Wakefield, mostly in PBD North and Hinjewadi. Sub-markets, power, policy and risks.

URL: https://invariant-ai.com/blog/data-centres-in-pune  
Published: 2026-11-21 · Publisher: Invariant · Region: Pune, Maharashtra, India

Pune had 133 MW of operational data centre capacity across 12 facilities in H1 2026, about 7% of India’s operational capacity, according to Cushman & Wakefield. The same count shows 31 MW under construction and 227 MW planned; Savills puts Pune at 182 MW IT, about 10% of the national total. Most capacity sits in PBD North and Hinjewadi. Cushman & Wakefield reports that Microsoft Azure has a cloud region in Pune and has acquired land for captive cloud developments, and Structure Research describes Pune as a core cloud region for one major hyperscaler because it is close to Mumbai. Maharashtra’s data centre policies apply in Pune as in Mumbai.

## Key points

- Pune had 133 MW operational, 31 MW under construction and 227 MW planned in H1 2026, according to Cushman & Wakefield; Savills counts 182 MW IT.
- In Pune, PBD North holds 92 MW in 2 facilities at 16.5% vacancy and Hinjewadi 37 MW in 5 at 32.5% vacancy (Cushman & Wakefield, H1 2026).
- Maharashtra’s IT/ITES Policy 2023 and the Integrated Green Data Centre Parks framework, extended statewide in June 2026, apply in Pune.
- Pune is in Seismic Zone III in the IS 1893 (Part 1):2002 town list.

## Pune data centre market: key facts (H1 2026)

| Item | Figure and period |
| --- | --- |
| Operational capacity | 133 MW in 12 data centres, about 7% of India’s operational capacity (Cushman & Wakefield, H1 2026); 182 MW IT, about 10% (Savills) |
| Under construction and planned | 31 MW under construction; 227 MW planned (Cushman & Wakefield) |
| Colocation vacancy | 22.1% (Cushman & Wakefield, H1 2026) |
| Sub-markets | PBD North 92 MW; Hinjewadi 37 MW |
| Hyperscale | Microsoft Azure cloud region; land acquired for captive cloud developments |
| State policy | Maharashtra IT/ITES Policy 2023; Integrated Green Data Centre Parks (up to 20 parks statewide since June 2026) |
| Physical risk note | Seismic Zone III |

Sources: ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)) ([Cyril Amarchand Mangaldas](https://corporate.cyrilamarchandblogs.com/2023/07/key-highlights-of-maharashtra-it-ites-policy-2023-it-ites-units-iitts-and-data-centers/)) ([International Bar Association](https://www.ibanet.org/green-data-centres-in-India-policy-meets-practice)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf))

Cushman & Wakefield’s figures include colocation and hyperscale cloud service providers; Savills reports operational stock in MW of IT load. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/))

## Pune data centre sub-markets: PBD North and Hinjewadi

In Pune, the PBD North cluster holds 92 MW in two facilities, with 19 MW under construction and 169 MW planned, according to Cushman & Wakefield. Hinjewadi holds 37 MW across five facilities, with 12 MW under construction, 58 MW planned and 160 MW at early stage. AdaniConneX lists 250 MW of potential IT load in Pune, with phase one live from October 2025. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([AdaniConneX](https://www.adaniconnex.com/data-centers))

## Power and policy for Pune data centres

Maharashtra’s IT/ITES Policy 2023, which applies in Pune, gives a 100% stamp duty exemption on land or premises for a new data centre and a Rs 1 per unit tariff subsidy for 5 years for new units outside Zone I. A notification of 22 June 2026 exempts data centre units from electricity duty for 20 years. A June 2026 government resolution extended the Integrated Green Data Centre Parks framework to the whole state, raised the number of eligible parks from 3 to 20, and cut the green power requirement for core operations from 100% to 51%. ([Cyril Amarchand Mangaldas](https://corporate.cyrilamarchandblogs.com/2023/07/key-highlights-of-maharashtra-it-ites-policy-2023-it-ites-units-iitts-and-data-centers/)) ([Government of Maharashtra (gazette copy via Simpliance)](https://simpliance.in/download/file/dXBsb2Fkcy9nb3Z0bm90aWZpY2F0aW9uL05vdGlmaWNhdGlvbiByZWdhcmRpbmcgRXhlbXB0aW9uIGZyb20gUGF5bWVudCBvZiBFbGVjdHJpY2l0eSBEdXR5IHRvIElUIGFuZCBJVEVTIGFuZCBEYXRhIENlbnRyZSBVbml0cyB1bmRlciB0aGUgSW5mb3JtYXRpb24gVGVjaG5vbG9neSBhbmQgSW5mb3JtYXRpb24ucGRm)) ([International Bar Association](https://www.ibanet.org/green-data-centres-in-India-policy-meets-practice))

For grid supply in Pune, the MERC Supply Code sets 33 kV supply up to 10,000 kVA of contract demand (20,000 kVA in a Metropolitan Area or on an express feeder elsewhere), extra high voltage above that, and a one-year standard where a new distribution substation is needed. MERC classifies data centres under the industrial category. ([Maharashtra Electricity Regulatory Commission (via MSEDCL)](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MERC-SOP-including-PQ-Reg-2021.pdf)) ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf))

Structure Research reports that MSEDCL has allocated about 6 GW of grid power to data centres in Navi Mumbai and that committed and under-construction capacity there is approaching that level. Confirm the serving substation and sanction for the specific Pune plot. ([Structure Research](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/))

## Site risks for data centres in Pune

- Seismic: Pune is Zone III (zone factor 0.16) in the IS 1893 (Part 1):2002 town list.
- Airport: AAI height clearance under GSR 751(E) applies within 20 km of the aerodrome reference point for visual flight rules airports, or 56 km for instrument flight rules airports.
- Water: check the groundwater assessment unit and the municipal or MIDC supply before planning evaporative cooling.

Sources: ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([Airports Authority of India](https://nocas2.aai.aero/nocas/FAQ.html))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. For a Pune site, we lay out the comparison with a Navi Mumbai plot on power date and latency.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### How much data centre capacity does Pune have?

Pune had 133 MW of operational data centre capacity in H1 2026, according to Cushman & Wakefield, with 31 MW under construction and 227 MW planned. Savills counts 182 MW IT. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([Communications Today](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/))

### Where are the data centres in Pune?

Most of Pune’s data centre capacity is in the PBD North cluster (92 MW) and Hinjewadi (37 MW), according to Cushman & Wakefield. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### What is the data centre vacancy rate in Pune?

Colocation vacancy in Pune was 22.1% in H1 2026, according to Cushman & Wakefield. PBD North was at 16.5% and Hinjewadi at 32.5%. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### Does Microsoft have a data center in Pune?

Microsoft Azure has a cloud region in Pune, according to Cushman & Wakefield, which also reports that Microsoft has added availability zones and acquired land for captive cloud developments. ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b))

### Do Maharashtra data centre incentives apply in Pune?

Yes. The IT/ITES Policy 2023 is a state policy, and a June 2026 government resolution extended the Integrated Green Data Centre Parks framework beyond the Mumbai Metropolitan Region to the rest of the state. ([Cyril Amarchand Mangaldas](https://corporate.cyrilamarchandblogs.com/2023/07/key-highlights-of-maharashtra-it-ites-policy-2023-it-ites-units-iitts-and-data-centers/)) ([International Bar Association](https://www.ibanet.org/green-data-centres-in-India-policy-meets-practice))

## Sources

- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- Communications Today: [India's data centre capacity additions jump 59% in H1 2026 (Savills India)](https://www.communicationstoday.co.in/indias-data-centre-capacity-additions-jump-59-in-h1-2026/)
- Cyril Amarchand Mangaldas: [Key highlights of Maharashtra IT/ITES Policy 2023: data centers](https://corporate.cyrilamarchandblogs.com/2023/07/key-highlights-of-maharashtra-it-ites-policy-2023-it-ites-units-iitts-and-data-centers/)
- Government of Maharashtra (gazette copy via Simpliance): [Notification No. CEI-2025/CR-158/Energy-1 of 22 June 2026 under the Maharashtra Electricity Duty Act, 2016](https://simpliance.in/download/file/dXBsb2Fkcy9nb3Z0bm90aWZpY2F0aW9uL05vdGlmaWNhdGlvbiByZWdhcmRpbmcgRXhlbXB0aW9uIGZyb20gUGF5bWVudCBvZiBFbGVjdHJpY2l0eSBEdXR5IHRvIElUIGFuZCBJVEVTIGFuZCBEYXRhIENlbnRyZSBVbml0cyB1bmRlciB0aGUgSW5mb3JtYXRpb24gVGVjaG5vbG9neSBhbmQgSW5mb3JtYXRpb24ucGRm)
- International Bar Association: [Green data centres in India: policy meets practice](https://www.ibanet.org/green-data-centres-in-India-policy-meets-practice)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- AdaniConneX: [Data centers](https://www.adaniconnex.com/data-centers)
- Maharashtra Electricity Regulatory Commission (via MSEDCL): [MERC Electricity Supply Code and Standards of Performance Regulations 2021](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MERC-SOP-including-PQ-Reg-2021.pdf)
- Maharashtra Electricity Regulatory Commission: [MERC MYT Order for MSEDCL, Case 217 of 2024 (28 March 2025)](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf)
- Structure Research: [Mumbai and Pune data centre report 2026](https://www.structureresearch.net/product/mumbai-pune-dcai-report-2026-data-centre-colocation-hyperscale-cloud-ai-interconnection/)
- Airports Authority of India: [NOCAS frequently asked questions (height clearance under GSR 751(E))](https://nocas2.aai.aero/nocas/FAQ.html)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Data centres in Mumbai and Navi Mumbai: capacity, sub-markets and power (2026)](https://invariant-ai.com/blog/data-centres-in-mumbai)
- [Maharashtra data centre policy 2026: green data centre parks and IT/ITES incentives](https://invariant-ai.com/blog/maharashtra-data-centre-policy)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)
