# Data centres in Visakhapatnam: Google’s AI hub, gigawatt campuses and risks (2026)

> Visakhapatnam has more than 4 GW of early-stage or announced data centre capacity, led by Google’s US$15 billion AI hub. Power, cyclone, water and cable checks.

URL: https://invariant-ai.com/blog/data-centres-in-visakhapatnam  
Published: 2026-11-21 · Publisher: Invariant · Region: Visakhapatnam, Andhra Pradesh, India

Visakhapatnam has more than 4 GW of early-stage or announced data centre capacity, according to Invest India and Cushman & Wakefield (October 2026). Google committed about US$15 billion over 2026 to 2030 for its first India AI hub in the city, with AdaniConneX and Nxtra by Airtel, and broke ground at Tarluvada on 28 April 2026. Digital Connexion (1 GW), Colt DCS with RMZ (1.25 GW) and AirTrunk (up to 1.8 GW across two proposed campuses) have announced or proposed large developments. Crisil estimates that by FY2030 data centre capacity in Visakhapatnam could equal about 80% of the city’s current peak power demand.

## Key points

- Announced in and around Visakhapatnam: Google (about US$15 billion, about 1 GW), Digital Connexion (about US$11 billion, 1 GW), Colt DCS and RMZ (1.25 GW, about US$21 billion), AirTrunk (up to 1.8 GW in Anakapalli, proposed).
- Crisil estimates that by FY2030 data centre capacity in Visakhapatnam could equal about 80% of the city’s current peak power demand.
- Andhra Pradesh Data Center Policy 4.0 (2024-29) gives large projects project-specific packages through government orders; the state issued orders for specific projects in 2026.
- Cyclone Hudhud crossed the coast over Visakhapatnam on 12 October 2014 with winds of about 180 km/h and a 1.4 m storm surge.
- New subsea routes into Visakhapatnam: Google’s America-India Connect gateway (announced February 2026) and Sify’s open cable landing station.

## Visakhapatnam data centre market: key facts (2026)

| Item | Figure and period |
| --- | --- |
| Announced capacity | More than 4 GW at early or announced stage (Invest India and Cushman & Wakefield, October 2026) |
| Largest project | Google AI hub, about US$15 billion over 2026 to 2030, groundbreaking 28 April 2026 |
| Grid note | Data centre capacity could equal about 80% of the city’s current peak demand by FY2030 (Crisil) |
| State policy | Andhra Pradesh Data Center Policy 4.0 (2024-29), notified 14 November 2024 according to TeamLease RegTech |
| Cables | Google America-India Connect gateway (announced February 2026); Sify open cable landing station (foundation stone October 2025); Airtel cites a next-generation cable landing station as part of its role in the Google hub |
| Physical risk note | Seismic Zone II; Cyclone Hudhud landfall on 12 October 2014 |

Sources: ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([Adani Group](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem)) ([DD India](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/)) ([TeamLease RegTech](https://teamleaseregtech.com/updates/article/38147/andhra-pradesh-data-center-policy-40-2024-29)) ([Google](https://blog.google/intl/en-in/company-news/announcing-america-india-connect-and-new-investments-to-advance-global-ai-access/)) ([ThePrint (PTI)](https://theprint.in/india/andhra-minister-nara-lokesh-lays-foundation-for-sifys-rs-1500-cr-ai-edge-data-center-in-vizag/2762491/)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)) ([India Meteorological Department](https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_fac6af_hud.pdf))

## Data centre projects announced in and around Visakhapatnam

| Developer | Scale | Where | Status and date |
| --- | --- | --- | --- |
| Google with AdaniConneX and Nxtra by Airtel | Gigawatt-scale, three data centre campuses; about US$15 billion over 2026 to 2030 | Groundbreaking at Tarluvada | Announced 14 October 2025; groundbreaking 28 April 2026 |
| Digital Connexion (Reliance, Brookfield, Digital Realty) | 1 GW; about US$11 billion by 2030 | 400-acre campus | MoU with the AP Economic Development Board, announced November 2025 |
| Colt DCS and RMZ | 1.25 GW; about US$21 billion over the next decade | Visakhapatnam | Announced (Cushman & Wakefield, H1 2026) |
| AirTrunk | Up to 1.8 GW; about US$11 billion | Two campuses in Anakapalli district | Project reports submitted, reported November 2026 (IREI, citing Bloomberg); subject to government approval |
| Sify | 50 MW AI edge data centre and open cable landing station; Rs 1,500 crore | 3.6 acres | Foundation stone 12 October 2025 |

Sources: ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([Adani Group](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem)) ([Business Today](https://www.businesstoday.in/latest/corporate/story/reliance-brookfield-digital-realty-jv-to-invest-11-billion-in-andhra-pradesh-to-build-1-gw-data-centre-503905-2025-11-27)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([IREI](https://irei.com/news/blackstone-backed-airtrunk-advances-11b-india-data-center-development-plans)) ([ThePrint (PTI)](https://theprint.in/india/andhra-minister-nara-lokesh-lays-foundation-for-sifys-rs-1500-cr-ai-edge-data-center-in-vizag/2762491/))

Andhra Pradesh also issued government orders under Policy 4.0 for specific projects in 2026, including ReNew’s 1,000 MW at Makavaripalem in Anakapalli district and AM AI Factory’s 512 MW at Amanam village. ETV Bharat reported that incentives for Google’s subsidiary Raiden Infotech are capped at Rs 22,000 crore against Rs 87,520 crore of investment, including a 25% discount on 480 acres of land. ([MediaNama](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/)) ([ETV Bharat](https://www.etvbharat.com/en/technology/andhra-pradesh-offers-rs-22000-crore-incentives-to-googles-raiden-infotech-for-data-centres-enn25101501804))

## Grid power for Visakhapatnam data centres

Crisil estimates that data centre capacity could equal about 80% of Visakhapatnam’s current peak demand by FY2030, and says this makes timely grid connectivity and transmission augmentation critical. A site in Vizag therefore needs evidence of which transmission scheme serves it and when, not only a state MoU. ([DD India](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/))

Andhra Pradesh grants incentives for large data centre projects one by one, through government orders. Read the project order; the policy text alone does not tell you what a given site gets. ([MediaNama](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/))

## Disadvantages and risks of a data centre in Vizag

- Cyclone: Hudhud crossed the coast over Visakhapatnam on 12 October 2014 with maximum sustained winds of about 180 km/h, central pressure of 950 hPa and a 1.4 m storm surge at the Visakhapatnam tide gauge. Design for wind loads and plan for grid outages after landfall.
- Water: check the groundwater category of the assessment unit before planning evaporative cooling; nationally, 10.8% of assessment units were over-exploited in the 2025 assessment.
- Market depth: Invest India and Cushman & Wakefield map Visakhapatnam’s capacity as early-stage or announced, so early tenants depend on the hyperscale anchors.
- Seismic: Visakhapatnam is Zone II (zone factor 0.10), a low design load.

Sources: ([India Meteorological Department](https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_fac6af_hud.pdf)) ([Press Information Bureau (Ministry of Jal Shakti)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2220203&reg=48&lang=2)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)) ([Bureau of Indian Standards](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf))

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Vizag the questions are which transmission scheme and substation serve the plot, the cyclone design basis, and the water source.

## Subsea cable landings in Visakhapatnam

Google’s America-India Connect, announced on 18 February 2026, includes a new international subsea gateway in Visakhapatnam, a direct path from Vizag and Chennai to South Africa, and a direct path between Vizag and Singapore. At the Google groundbreaking, Airtel cited a next-generation cable landing station as part of what it brings to the Vizag hub, and Sify is building an open cable landing station alongside its 50 MW AI edge data centre. ([Google](https://blog.google/intl/en-in/company-news/announcing-america-india-connect-and-new-investments-to-advance-global-ai-access/)) ([Adani Group](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem)) ([ThePrint (PTI)](https://theprint.in/india/andhra-minister-nara-lokesh-lays-foundation-for-sifys-rs-1500-cr-ai-edge-data-center-in-vizag/2762491/))

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### Which companies are building data centres in Visakhapatnam?

Google (with AdaniConneX and Nxtra by Airtel), Digital Connexion, Colt DCS with RMZ, Sify and AirTrunk have announced or proposed data centres in and around Visakhapatnam. Digital Connexion is backed by Reliance, Brookfield and Digital Realty; AirTrunk has submitted project reports for Anakapalli, according to IREI. ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([Adani Group](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem)) ([Business Today](https://www.businesstoday.in/latest/corporate/story/reliance-brookfield-digital-realty-jv-to-invest-11-billion-in-andhra-pradesh-to-build-1-gw-data-centre-503905-2025-11-27)) ([Cushman & Wakefield](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)) ([ThePrint (PTI)](https://theprint.in/india/andhra-minister-nara-lokesh-lays-foundation-for-sifys-rs-1500-cr-ai-edge-data-center-in-vizag/2762491/)) ([IREI](https://irei.com/news/blackstone-backed-airtrunk-advances-11b-india-data-center-development-plans))

### How much data centre capacity is planned in Visakhapatnam?

More than 4 GW of data centre capacity in Visakhapatnam is at early or announced stage, according to Invest India and Cushman & Wakefield (October 2026). ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

### How big is Google’s data centre in Vizag?

Google committed about US$15 billion over 2026 to 2030 for its India AI hub in Visakhapatnam, which comprises three data centre campuses. The Adani Group described nearly 1 GW in a single location at the groundbreaking on 28 April 2026. ([Google](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)) ([Adani Group](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem))

### What are the disadvantages of a data center in Vizag?

The disadvantages are cyclone exposure (Hudhud in 2014), power build-out relative to the city’s demand, water for cooling, and a market still at early or announced stage. ([India Meteorological Department](https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_fac6af_hud.pdf)) ([DD India](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/)) ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

### Does Andhra Pradesh have a data centre policy?

Yes. Andhra Pradesh Data Center Policy 4.0 (2024-29), notified on 14 November 2024 according to TeamLease RegTech. Large projects receive project-specific incentives through government orders. ([TeamLease RegTech](https://teamleaseregtech.com/updates/article/38147/andhra-pradesh-data-center-policy-40-2024-29)) ([MediaNama](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/))

## Sources

- Invest India and Cushman & Wakefield: [India's Data Centre Growth Story (October 2026)](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)
- Google: [Our first AI hub in India, powered by a $15 billion investment](https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/)
- Adani Group: [Google breaks ground on India AI hub](https://www.adani.com/newsroom/media-releases/google-breaks-ground-on-india-ai-hub-launching-a-national-industrial-ecosystem)
- DD India: [India’s data centre capacity set for 5x surge by 2030 (Crisil Ratings)](https://ddindia.co.in/2026/11/indias-data-centre-capacity-set-for-5x-surge-by-2030/)
- TeamLease RegTech: [Andhra Pradesh Data Center Policy (4.0) 2024-29](https://teamleaseregtech.com/updates/article/38147/andhra-pradesh-data-center-policy-40-2024-29)
- Google: [Announcing America-India Connect and new investments to advance global AI access](https://blog.google/intl/en-in/company-news/announcing-america-india-connect-and-new-investments-to-advance-global-ai-access/)
- ThePrint (PTI): [Andhra minister Nara Lokesh lays foundation for Sify’s Rs 1,500 cr AI edge data center in Vizag](https://theprint.in/india/andhra-minister-nara-lokesh-lays-foundation-for-sifys-rs-1500-cr-ai-edge-data-center-in-vizag/2762491/)
- Bureau of Indian Standards: [IS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors](https://law.resource.org/pub/in/bis/S03/is.1893.1.2002.pdf)
- India Meteorological Department: [Very Severe Cyclonic Storm Hudhud: a report](https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_fac6af_hud.pdf)
- Business Today: [Reliance, Brookfield, Digital Realty JV to invest $11 billion in Andhra Pradesh for 1 GW data centre](https://www.businesstoday.in/latest/corporate/story/reliance-brookfield-digital-realty-jv-to-invest-11-billion-in-andhra-pradesh-to-build-1-gw-data-centre-503905-2025-11-27)
- Cushman & Wakefield: [India Data Centre Market Overview H1 2026](https://content.cushmanwakefield.com/api/public/content/6b60db63971344f3a3f5392374471667?v=90a58a0b)
- IREI: [Blackstone-backed AirTrunk advances $11B India data center development plans](https://irei.com/news/blackstone-backed-airtrunk-advances-11b-india-data-center-development-plans)
- MediaNama: [Andhra Pradesh clears AI data centre projects under Policy 4.0](https://www.medianama.com/2026/08/223-andhra-pradesh-ai-data-centres/)
- ETV Bharat: [Andhra Pradesh offers Rs 22,000 crore incentives to Google’s Raiden Infotech for data centres](https://www.etvbharat.com/en/technology/andhra-pradesh-offers-rs-22000-crore-incentives-to-googles-raiden-infotech-for-data-centres-enn25101501804)
- Press Information Bureau (Ministry of Jal Shakti): [Dynamic Ground Water Resources Assessment 2025](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2220203&reg=48&lang=2)

## Related

- [Data centres in India: capacity, cities, companies, policy and power (2026)](https://invariant-ai.com/blog/data-centres-in-india)
- [Andhra Pradesh data centre policy 4.0 (2024-29): incentives and mega projects](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy)
- [AI data centres in India: gigawatt campuses, IndiaAI GPUs and power (2026)](https://invariant-ai.com/blog/ai-data-centres-india)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Seismic zones, flood and cyclone risk for data centres in India (2026)](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)