# How much power does a GPU cluster need? H100, B200 and GB200 NVL72 in MW

> GPU cluster power requirements in MW: H100, B200 and GB200 NVL72 from 256 to 100,000 GPUs, kW per GPU, rack density, PUE and what to ask a data center for.

URL: https://invariant-ai.com/blog/gpu-cluster-power-requirements  
Published: 2026-11-20 · Publisher: Invariant · Region: United States

A GPU cluster needs about 1.8 kW per H100, 2.6 kW per B200 and 2.4 kW per GB200 GPU at the meter, once you count the server, networking, storage and cooling. That puts 1,024 B200 GPUs at about 2.6 MW, 16,384 GB200 GPUs at about 39 MW and 100,000 GB200 GPUs at about 238 MW. The figures come from NVIDIA’s published system power, plus about 10% for networking and storage and a PUE of 1.3.

## Key points

- Size from the system, not the GPU. An H100 is rated up to 700 W, but an eight-GPU DGX H100 draws up to 10.2 kW.
- Rack density decides cooling: four DGX H100s is about 41 kW a rack; a GB200 NVL72 is about 120 kW.
- PUE turns IT load into what the utility sees. 1.3 is a reasonable planning figure for a new liquid-cooled build.
- Ask a data center for MW at the meter and kW per cabinet, both with dates.

## Power per GPU

| System | kW per GPU, system | kW per GPU, with networking and storage | kW per GPU at the meter (PUE 1.3) |
| --- | --- | --- | --- |
| H100 (DGX H100, 8 GPUs, 10.2 kW max) | 1.27 | 1.40 | 1.82 |
| B200 (DGX B200, 8 GPUs, 14.3 kW max) | 1.79 | 1.97 | 2.56 |
| GB200 NVL72 (72 GPUs, about 120 kW a rack) | 1.67 | 1.83 | 2.38 |

Sources: ([NVIDIA](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html)) ([NVIDIA](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html)) ([eeNews Europe](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard))

NVIDIA rates the H100 SXM at up to 700 W, but the GPU is only part of the server. CPUs, memory, NICs and fans take the eight-GPU DGX H100 to 10.2 kW at maximum, and the DGX B200 to 14.3 kW. ([NVIDIA](https://www.nvidia.com/en-us/data-center/h100/)) ([NVIDIA](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html)) ([NVIDIA](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html))

The GB200 NVL72 packs 36 Grace CPUs and 72 Blackwell GPUs into one liquid-cooled rack drawing about 120 kW. ([NVIDIA](https://www.nvidia.com/en-us/data-center/gb200-nvl72/)) ([eeNews Europe](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard))

## Cluster size to MW

| GPUs | H100, facility MW | B200, facility MW | GB200 NVL72, facility MW |
| --- | --- | --- | --- |
| 256 | 0.5 MW | 0.7 MW | 0.6 MW |
| 1,024 | 1.9 MW | 2.6 MW | 2.4 MW |
| 4,096 | 7.5 MW | 10 MW | 9.8 MW |
| 16,384 | 30 MW | 42 MW | 39 MW |
| 32,768 | 60 MW | 84 MW | 78 MW |
| 100,000 | 182 MW | 256 MW | 238 MW |

Sources: ([NVIDIA](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html)) ([NVIDIA](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html)) ([eeNews Europe](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard))

Our arithmetic: system kW per GPU, times 1.10 for networking and storage, times 1.3 for PUE. Max-rated system power is a sensible sizing basis because training runs keep GPUs near full load for weeks.

## Rack density and what it means for the building

| Configuration | Approximate kW per rack | Cooling |
| --- | --- | --- |
| 2 DGX H100 per rack | About 20 | Air, in most modern halls |
| 4 DGX H100 per rack | About 41 | Air with rear-door heat exchangers, or liquid |
| 4 DGX B200 per rack | About 57 | Rear-door or direct-to-chip liquid |
| GB200 NVL72 | About 120 | Direct-to-chip liquid, required |

Sources: ([NVIDIA](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html)) ([NVIDIA](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html)) ([eeNews Europe](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard))

Most colocation built before 2023 was designed for 5 to 15 kW a cabinet. So the binding question for a dense cluster is often cooling, not floor space or even total MW.

## Where PUE comes in

PUE is total facility power divided by IT power. Uptime Institute’s data shows large, newer facilities run more efficiently than the industry average. We use 1.3 for a new liquid-cooled build; an older air-cooled colo hall may run higher, and you pay for that in the power bill or the price per kW. ([Uptime Institute](https://journal.uptimeinstitute.com/large-data-centers-are-mostly-more-efficient-analysis-confirms/))

## More for neoclouds and AI labs

**For neoclouds and AI labs:** [Capacity for neoclouds and AI labs](https://invariant-ai.com/blog/ai-compute-capacity-for-neoclouds) · [GPU colocation: what to ask a provider](https://invariant-ai.com/blog/gpu-colocation-for-ai-labs) · [Liquid cooling for 40 to 130 kW racks](https://invariant-ai.com/blog/liquid-cooling-gpu-data-center) · [Where to put 1 to 10 MW of GPUs](https://invariant-ai.com/blog/small-gpu-cluster-1-to-10-mw) · [Build, lease or colocate](https://invariant-ai.com/blog/neocloud-build-lease-or-colocate) · [Power longstop dates in GPU leases](https://invariant-ai.com/blog/gpu-lease-power-longstop-diligence) · [Power check on a provider or site](https://invariant-ai.com/blog/provider-power-check-for-ai-tenants)

**Sites and power:** [AI data center sites](https://invariant-ai.com/blog/ai-data-center-site) · [Energized sites available now](https://invariant-ai.com/blog/energized-data-center-sites-available-now) · [Built data centers for sale and lease](https://invariant-ai.com/blog/data-center-for-sale) · [10 MW data center site](https://invariant-ai.com/blog/10-mw-data-center-site) · [100 MW data center site](https://invariant-ai.com/blog/100-mw-data-center-site) · [Converting a mining site to AI](https://invariant-ai.com/blog/convert-bitcoin-mining-site-to-ai-hpc-data-center) · [Behind-the-meter power](https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers) · [Utility-grade power study](https://invariant-ai.com/blog/utility-grade-power-study) · [Site due diligence](https://invariant-ai.com/blog/data-center-site-due-diligence)

## Questions

### How much power does an H100 cluster use?

About 1.8 kW per GPU at the meter, so roughly 1.8 MW per 1,000 H100s, based on DGX H100 at 10.2 kW per eight GPUs, about 10% for networking and storage and a PUE of 1.3. ([NVIDIA](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html))

### How much power does a GB200 NVL72 rack use?

About 120 kW per rack, liquid cooled. With networking, storage and a PUE of 1.3, that is about 170 kW per rack at the meter. ([eeNews Europe](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard))

### How many MW for 100,000 GPUs?

About 182 MW for H100, 256 MW for B200 and 238 MW for GB200 NVL72 at the meter, using the method on this page.

### What is the power draw of a DGX B200?

NVIDIA lists 14.3 kW maximum for the eight-GPU DGX B200 system. ([NVIDIA](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html))

### Can Invariant find capacity for my cluster size?

Yes. Send the GPU count, type and date to pranav@invariant-ai.com and we send powered options that fit.

## Sources

- NVIDIA: [Introduction to the NVIDIA DGX H100 system](https://docs.nvidia.com/dgx/dgxh100-user-guide/introduction-to-dgxh100.html)
- NVIDIA: [Introduction to the NVIDIA DGX B200 system](https://docs.nvidia.com/dgx/dgxb200-user-guide/introduction-to-dgxb200.html)
- NVIDIA: [NVIDIA H100 Tensor Core GPU](https://www.nvidia.com/en-us/data-center/h100/)
- NVIDIA: [NVIDIA GB200 NVL72](https://www.nvidia.com/en-us/data-center/gb200-nvl72/)
- eeNews Europe: [Nvidia offers 120 kW liquid-cooled Blackwell rack as industry standard](https://www.eenewseurope.com/en/nvidia-offers-120kw-liquid-cooled-blackwell-rack-as-industry-standard)
- Uptime Institute: [Large data centers are mostly more efficient, analysis confirms](https://journal.uptimeinstitute.com/large-data-centers-are-mostly-more-efficient-analysis-confirms/)

## Related

- [Data center capacity for neoclouds and AI labs: power, space and cooling for your GPUs (2026)](https://invariant-ai.com/blog/ai-compute-capacity-for-neoclouds)
- [Liquid cooling for GPU racks: what a data center needs for 40 to 130 kW racks](https://invariant-ai.com/blog/liquid-cooling-gpu-data-center)
- [GPU colocation for AI labs and neoclouds: what to ask a provider before you sign](https://invariant-ai.com/blog/gpu-colocation-for-ai-labs)

---

Site screens and power studies: pranav@invariant-ai.com, (628) 220-8972, https://cal.com/pranav-goswami/website-30min