# Illinois retired power plant site for data centers: about 800 MW former plant, transmission on site

> A retired Illinois power plant site (northern) with about 800 MW of former generation and high-voltage transmission still on site. Not listed for sale; we approach the owner for qualified buyers. Details on a call or at market.invariant-ai.com.

URL: https://invariant-ai.com/blog/illinois-retired-power-plant-site-800-mw-data-center  
Published: 2026-11-19 · Updated: 2026-11-22 · Publisher: Invariant · Region: Illinois, United States

We are tracking a retired power plant site in northern Illinois that once generated about 800 MW. The plant is shut, but the switchyard and the high-voltage lines that carried its output are still there. It is within reach of the Chicago data center market and its fiber, on the lakeshore with water for cooling.

## Key points

- Power: about 800 MW former generating capacity, high-voltage transmission on site. The public listing gives no confirmed MW for new load.
- Land: About 220 acres on the plant parcel, mostly outside the 100-year floodplain.
- Grid: PJM.
- Status: Off-market: not listed for sale; we approach the owner on a buyer's behalf.
- Location, utility documents and price are shared on a call.

## What we can share publicly

| Item | Summary |
| --- | --- |
| Power | about 800 MW former generating capacity, high-voltage transmission on site. The public listing gives no confirmed MW for new load |
| Land | About 220 acres on the plant parcel, mostly outside the 100-year floodplain |
| Grid | PJM |
| Status | Off-market: not listed for sale; we approach the owner on a buyer's behalf |
| Use | AI, HPC and large colocation campuses |
| Price and terms | Shared on a call |

Sources: ([U.S. Energy Information Administration](https://www.eia.gov/electricity/state/illinois/)) ([PJM](https://www.pjm.com/))

## Why this site is worth a call

Existing lines and a switchyard can help identify connection options. Ask the owner about access and the serving utility about the new load it can study, the upgrades it expects and the resulting service schedule.

## Who this site fits

Colocation and AI buyers who want a Chicago-region campus of 100 MW or more on built transmission. Remediation of the former plant is part of the work, so not suited to buyers who need to build this year.

## What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

- Exact location, parcel and owner
- Switchyard and interconnection details
- Site risk and power reports
- Approach to the owner and likely terms
- Comparable sites that fit your load

If this one is not right, we bring others that are. Most of what we place is never posted.

## Questions

### How much power could a data center get at the Illinois plant site?

The plant generated about 800 MW. The utility would need to evaluate the load and the point of delivery to establish usable MW, upgrades and a service date.

### How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

### Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

### Where can I find more data center sites like this?

Browse Invariant Market at https://market.invariant-ai.com. It lists over 100 US powered sites with a free teaser for each, plus risk, power and full site reports you can unlock.

## Sources

- U.S. Energy Information Administration: [EIA Illinois electricity profile](https://www.eia.gov/electricity/state/illinois/)
- PJM: [PJM Interconnection](https://www.pjm.com/)

## Related

- [Powered Land for Sale in the U.S. | Data Center and Mining Sites](https://invariant-ai.com/blog/powered-land-for-sale-data-center-sites)
- [Illinois Data Center Sites and Powered Land | ComEd and MISO](https://invariant-ai.com/blog/data-center-sites-for-sale-illinois)
- [Retired power plant sites for data centers: what transfers and what can sink the deal](https://invariant-ai.com/blog/retired-power-plant-sites-for-data-centers)

---

Site screens and power studies: pranav@invariant-ai.com, (628) 220-8972, https://cal.com/pranav-goswami/website-30min
