# Odisha data centre policy 2022: capital subsidy, power subsidy and SGST refund

> Odisha's State Data Centre Policy 2022 gives a 20% capital subsidy up to ₹25 crore, a 30% power bill subsidy for five years and 100% net SGST reimbursement.

URL: https://invariant-ai.com/blog/odisha-data-centre-policy  
Published: 2026-11-21 · Publisher: Invariant · Region: Odisha, India

Odisha’s State Data Centre Policy 2022 gives data centre units a capital subsidy of 20% of fixed capital investment, excluding land, up to ₹25 crore. Power support is a 30% power bill subsidy for five years up to ₹2 crore, plus 100% electricity duty and electrical inspection fee exemption for 10 years up to 5 MVA of contract demand. Net SGST is reimbursed in full for up to seven years, and land comes at concessional IDCO rates. OCAC is the nodal agency. Neither the policy text nor the official page states a validity period, so a data center project should confirm the policy is still open before applying.

## Key points

- Odisha’s State Data Centre Policy 2022 gives a capital subsidy of 20% of fixed capital investment, excluding land, up to ₹25 crore per unit.
- Odisha data centres get a 30% power bill subsidy for five years up to ₹2 crore, and 100% electricity duty relief for 10 years up to 5 MVA of contract demand.
- The Odisha policy reimburses 100% of net SGST for up to seven years, capped at fixed capital investment excluding land and building.
- Power from captive renewable plants in Odisha gets 100% transmission and wheeling reimbursement under the 2022 policy.
- Mega projects and projects of strategic importance can get customised packages under Odisha’s 2022 policy.

## Odisha State Data Centre Policy 2022: key facts

| Item | Detail (checked 21 November 2026) |
| --- | --- |
| Policy | Odisha State Data Centre Policy 2022 |
| Nodal agency | Odisha Computer Application Centre (OCAC); single window clearance |
| Capital subsidy | 20% of fixed capital investment (excluding land) up to ₹25 crore per unit |
| Power | Power bill subsidy 30% for 5 years up to ₹2 crore; electricity duty and inspection fee 100% for 10 years up to 5 MVA |
| Tax | 100% net SGST reimbursement for up to 7 years, capped at fixed capital investment excluding land and building |
| Validity | Not stated in the policy text or on the official page |

Sources: ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

## Odisha data centre incentives in full

The Odisha State Data Centre Policy 2022 gives data centre units the incentives below. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

- Land at concessional IDCO rates.
- Stamp duty 100% on the first transaction and 50% on the second.
- 100% reimbursement of land conversion charges; building fee reimbursement of 50% up to ₹2 lakh.
- Capital subsidy of 20% of fixed capital investment, excluding land, up to ₹25 crore.
- Electricity duty and inspection fee 100% for 10 years, up to 5 MVA contract demand; industrial power tariff applies.
- Power bill subsidy of 30% for 5 years, up to ₹2 crore.
- Energy audit reimbursement of 75% up to ₹2 lakh.
- 100% transmission and wheeling reimbursement for power from captive renewable plants in the state.
- 100% net SGST reimbursement for up to 7 years, capped at fixed capital investment excluding land and building.
- Skilling, EPF and ESI, and bandwidth support; customised packages for mega projects.

Sources: ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

## Odisha and other state data centre policies

Odisha’s 2022 policy is one of several state data centre policies: Invest India and Cushman & Wakefield counted eleven states with dedicated data centre policies in force as of September 2026. ([Invest India and Cushman & Wakefield](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf))

**Read next:** [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india)

For a site in Odisha, Invariant checks how it gets power and the evidence behind that path (the distribution or transmission connection, the open access route, the nearest substations), screens seismic zone, flood history, groundwater status and airport height limits, and maps the central and state approvals the project needs, with the authority behind each one.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### Does Odisha have a data centre policy?

Yes. Odisha has the State Data Centre Policy 2022, implemented through the Odisha Computer Application Centre (OCAC) with single window clearance. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

### What capital subsidy does Odisha give data centres?

Odisha gives 20% of fixed capital investment, excluding land, up to ₹25 crore per unit. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

### What power incentives does a data center get in Odisha?

A 30% power bill subsidy for five years up to ₹2 crore, and 100% electricity duty and inspection fee exemption for 10 years up to 5 MVA. Power from captive renewable plants in the state also gets 100% transmission and wheeling reimbursement. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

### Does Odisha reimburse SGST for data centres?

Yes. Odisha reimburses 100% of net SGST for up to seven years, capped at fixed capital investment excluding land and building. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

### Is the Odisha data centre policy still open?

Neither the Odisha policy text nor the official page states its validity. Confirm with OCAC before applying. ([Invest Odisha, Government of Odisha](https://investodisha.gov.in/datacentre-policy)) ([Electronics and IT Department, Government of Odisha](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf))

## Sources

- Invest Odisha, Government of Odisha: [Odisha State Data Centre Policy 2022](https://investodisha.gov.in/datacentre-policy)
- Electronics and IT Department, Government of Odisha: [Odisha State Data Centre Policy 2022 (policy text)](https://odisha.gov.in/policies-it/data_centre_policy_2022/data_centre_policy_2022_approved.pdf)
- Invest India and Cushman & Wakefield: [India's data centre growth story (October 2026)](https://static.investindia.gov.in/s3fs-public/2026-10/latest-news-India-Data-Centre-Growth-Story.pdf)

## Related

- [Data centre policy in India: state data centre policies compared (2026)](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison)
- [Data centres in Kolkata and East India: New Town, Salt Lake and Bhubaneswar (2026)](https://invariant-ai.com/blog/data-centres-in-kolkata)
- [West Bengal data centre policy 2021: incentives, essential services and status](https://invariant-ai.com/blog/west-bengal-data-centre-policy)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)