A data centre buying power through open access in India pays transmission and wheeling charges for using the wires, a cross subsidy surcharge and often an additional surcharge to the discom, and standby and banking charges, with the figures set every year in each state commission’s tariff order. The Green Energy Open Access Rules 2022 cap what green open access consumers can be charged: no additional surcharge if they pay fixed charges, and a cross subsidy surcharge that cannot rise by more than 50% over 12 years. Several state data centre policies waive part of the charges; Uttar Pradesh’s 2026 policy exempts up to 100% of transmission and wheeling, depending on the renewable source.

## Key points

- Under Section 42(2) of the Electricity Act 2003, cross subsidy surcharge compensates the discom for the cross subsidy it loses when a consumer buys elsewhere; additional surcharge, under Section 42(4), covers fixed costs stranded by its obligation to supply.
- Under the Green Energy Open Access Rules 2022, green open access consumers paying fixed charges do not pay additional surcharge.
- Captive and group captive users meeting the 26% ownership and 51% consumption tests pay neither surcharge, under the captive rules as amended in March 2026.
- In Maharashtra, the banking charge for green open access is 8% of energy banked, according to an MSEDCL commercial circular.
- Data centre policy waivers vary: Uttar Pradesh 2026 up to 100% of transmission and wheeling depending on the renewable source; Odisha 100% for in-state captive renewables; Tamil Nadu’s 2021 concessions applied to data centres incorporated up to 31 March 2026.

## What each open access charge pays for

| Charge | What it pays for | Who sets it |
| --- | --- | --- |
| Transmission charge | Use of the inter-state or intra-state transmission network | CERC regulations for inter-state, the state commission for intra-state |
| Wheeling charge | Use of the discom’s distribution network | State commission, in the tariff order |
| Cross subsidy surcharge | The cross subsidy the discom loses when a consumer buys elsewhere | State commission, under Section 42(2) of the Electricity Act 2003 |
| Additional surcharge | The discom’s fixed costs arising from its obligation to supply | State commission, under Section 42(4) |
| Standby charge | Discom supply when the open access source fails | State commission; capped at 25% of energy charges for green open access by the January 2023 amendment |
| Banking charge | Storing surplus renewable energy for later use | State commission; 8% of energy banked in Maharashtra |

Sources: ([Ministry of Power (gazette copy)](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)) ([Ministry of Power (gazette copy via REC Registry)](https://www.recregistryindia.nic.in/pdf/REC_Regulation/First_Amendment_Green_Energy_Open_Access_Rules_2023.pdf)) ([MSEDCL](https://www.mahadiscom.in/consumer/wp-content/uploads/2024/09/Comm-Circular-No-346.pdf)) ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf)) ([Uttar Pradesh Electricity Regulatory Commission](https://www.uperc.org/App_File/UPPCLTariffOrder-pdf72202630517PM.pdf)) ([PIB, Ministry of New and Renewable Energy](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2241170))

## Caps on green open access charges under the 2022 rules

- The Green Energy Open Access Rules 2022, as amended in January 2023, list transmission, wheeling, cross subsidy surcharge, standby and banking charges, plus fees such as load despatch, scheduling and deviation settlement charges under the commission’s regulations.
- Additional surcharge does not apply to green open access consumers paying fixed charges.
- For green energy from a renewable plant, cross subsidy surcharge cannot rise during 12 years from the plant’s operation by more than 50% of the surcharge fixed for the year open access is granted.
- Cross subsidy and additional surcharges do not apply to green hydrogen or ammonia, or to supply from non-fossil waste-to-energy plants.

Sources: ([Ministry of Power (gazette copy)](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)) ([Ministry of Power (gazette copy via REC Registry)](https://www.recregistryindia.nic.in/pdf/REC_Regulation/First_Amendment_Green_Energy_Open_Access_Rules_2023.pdf))

Captive and group captive plants meeting the 26% ownership and 51% consumption tests avoid both surcharges. Under the March 2026 amendment, surcharges are not levied while the tests are being verified, with carrying cost if the plant fails. ([PIB, Ministry of Power](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2240205)) ([pv magazine India](https://www.pv-magazine-india.com/2026/03/31/reforming-captive-power-in-india-key-changes-under-the-electricity-amendment-rules-2026/))

## Open access charges by state: what we verified

Each state commission sets its own open access charges, and we did not find a single current source listing them for every state; we have not compiled each commission’s current cross subsidy surcharge for this guide. The table records what we did verify and where to look for the rest.

| State | Verified for data centres | Where current charges are set |
| --- | --- | --- |
| Maharashtra | HT wheeling component of ₹0.62/kVAh (FY 2025-26) and ₹0.60/kVAh (FY 2026-27) in the March 2025 multi-year order, since revised by MERC review orders (current rate not verified); 10% wheeling discount for data centres on 100% green power; banking charge 8% | MERC tariff orders and MSEDCL commercial circulars |
| Uttar Pradesh | 2026 data centre policy: transmission and wheeling exemption up to 100% depending on the renewable source; the 2021 policy exempted 50% of transmission and wheeling charges for 25 years on intra-state sale (Invest UP) | UPERC orders; Invest UP for policy benefits |
| Tamil Nadu | 2021 data centre policy: open access charges at 50% and cross subsidy surcharge at 60% (wind) or 70% (solar) of conventional, for projects incorporated up to 31 March 2026 | TNERC orders |
| Odisha | 2022 data centre policy: 100% reimbursement of transmission and wheeling charges for captive renewables in the state | OERC orders; OCAC for policy benefits |
| Haryana | 2026 data centre policy opex reimbursement covers wheeling and transmission charges for power imported from outside the state, among other costs (Sanjay Laul & Co) | HERC orders; state IT department |
| Gujarat | 2026-29 data centre policy allows open access | GERC orders |
| Telangana, Karnataka, Andhra Pradesh, West Bengal | Not verified for this guide | TGERC, KERC, APERC and WBERC tariff and open access orders |

Sources: ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf)) ([MSEDCL](https://www.mahadiscom.in/consumer/wp-content/uploads/2024/09/Comm-Circular-No-346.pdf)) ([Invest UP](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/)) ([Invest UP](https://invest.up.gov.in/policies/up-data-centre-policy-2021/)) ([Government of Tamil Nadu, via National Single Window System](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf)) ([Invest Odisha](https://investodisha.gov.in/datacentre-policy)) ([Sanjay Laul & Co](https://www.sanjaylaulandco.com/post/new-haryana-data-centre-policy-2026-capex-opex-and-fast-track-approvals-for-digital-infrastructure)) ([Cyril Amarchand Mangaldas](https://corporate.cyrilamarchandblogs.com/2026/07/gujarat-data-center-policy-2026-2029-a-push-for-large-scale-data-center-infrastructure/))

## How to compare open access costs across states

- Start from the landed cost per unit: energy price at the generator, plus transmission and wheeling losses and charges, plus cross subsidy and additional surcharge, plus banking and standby.
- Check whether the project qualifies for a state data centre policy waiver, and whether that policy is still open: several lapsed or were replaced in 2026.
- Test captive or group captive: if the 26% and 51% tests are met, the two surcharges fall away.
- Keep the discom connection in the model: demand charges for the contract demand and standby still apply.

Sources: ([PIB, Ministry of Power](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2240205)) ([pv magazine India](https://www.pv-magazine-india.com/2026/03/31/reforming-captive-power-in-india-key-changes-under-the-electricity-amendment-rules-2026/)) ([Government of Tamil Nadu, via National Single Window System](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf)) ([Invest UP](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/)) ([Cyril Amarchand Mangaldas](https://corporate.cyrilamarchandblogs.com/2026/07/gujarat-data-center-policy-2026-2029-a-push-for-large-scale-data-center-infrastructure/))

**Power guides for India:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

## How Invariant helps

For a site or shortlist in India, Invariant checks how the site gets power: the discom or transmission connection, the voltage the load falls under, the nearest substations, the open access or captive route and the document behind the MW. We also screen seismic zone, flood history, groundwater status and airport height limits, and map the central and state approvals with the authority behind each. Send the state, the MW and the date you need power.

## More on data centres in India

**Start here:** [Data centres in India: capacity, cities, policy, power](https://invariant-ai.com/blog/data-centres-in-india) · [How to find a data centre site in India](https://invariant-ai.com/blog/find-data-centre-site-india) · [Data centre companies in India](https://invariant-ai.com/blog/data-centre-companies-india)

**Build and approvals:** [Approvals for a data centre in India](https://invariant-ai.com/blog/data-centre-approvals-india) · [How to set up a data centre in India](https://invariant-ai.com/blog/how-to-set-up-data-centre-india) · [Data centre cost per MW in India](https://invariant-ai.com/blog/data-centre-cost-per-mw-india) · [Site due diligence in India](https://invariant-ai.com/blog/data-centre-site-due-diligence-india) · [Data centre land and powered land in India](https://invariant-ai.com/blog/data-centre-land-india) · [Seismic zones, flood and cyclone risk](https://invariant-ai.com/blog/data-centre-seismic-flood-risk-india) · [Water and groundwater NOC for data centres](https://invariant-ai.com/blog/data-centre-water-india) · [DPDP Act and data localisation](https://invariant-ai.com/blog/dpdp-data-localisation-data-centres-india) · [Infrastructure status, tax holiday and DC SEZs](https://invariant-ai.com/blog/data-centre-incentives-india-central)

**Power:** [Power for data centres in India](https://invariant-ai.com/blog/power-for-data-centres-india) · [Grid connection: DISCOM, STU and CTU paths](https://invariant-ai.com/blog/data-centre-grid-connection-india) · [Green energy open access for data centres](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india) · [Open access charges by state](https://invariant-ai.com/blog/open-access-charges-by-state-india) · [India data centre power demand to 2032](https://invariant-ai.com/blog/data-centre-power-demand-india) · [Power studies for Indian data centre sites](https://invariant-ai.com/blog/power-study-data-centre-india) · [Diesel generators and backup power rules](https://invariant-ai.com/blog/data-centre-backup-power-dg-sets-india)

**Policy by state:** [National data centre policy](https://invariant-ai.com/blog/national-data-centre-policy-india) · [State data centre policies compared](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison) · [Maharashtra data centre policy](https://invariant-ai.com/blog/maharashtra-data-centre-policy) · [Uttar Pradesh data centre policy](https://invariant-ai.com/blog/uttar-pradesh-data-centre-policy) · [Tamil Nadu data centre policy](https://invariant-ai.com/blog/tamil-nadu-data-centre-policy) · [Telangana data centre policy](https://invariant-ai.com/blog/telangana-data-centre-policy) · [Gujarat data centre policy](https://invariant-ai.com/blog/gujarat-data-centre-policy) · [Karnataka data centre policy](https://invariant-ai.com/blog/karnataka-data-centre-policy) · [Andhra Pradesh data centre policy](https://invariant-ai.com/blog/andhra-pradesh-data-centre-policy) · [Haryana data centre policy](https://invariant-ai.com/blog/haryana-data-centre-policy) · [Rajasthan data centre policy](https://invariant-ai.com/blog/rajasthan-data-centre-policy) · [Odisha data centre policy](https://invariant-ai.com/blog/odisha-data-centre-policy) · [West Bengal data centre policy](https://invariant-ai.com/blog/west-bengal-data-centre-policy) · [Madhya Pradesh data centre policy](https://invariant-ai.com/blog/madhya-pradesh-data-centre-policy)

**Cities:** [Data centres in Mumbai and Navi Mumbai](https://invariant-ai.com/blog/data-centres-in-mumbai) · [Data centres in Chennai](https://invariant-ai.com/blog/data-centres-in-chennai) · [Data centres in Hyderabad](https://invariant-ai.com/blog/data-centres-in-hyderabad) · [Data centres in Noida and Delhi NCR](https://invariant-ai.com/blog/data-centres-in-noida) · [Data centres in Bengaluru](https://invariant-ai.com/blog/data-centres-in-bengaluru) · [Data centres in Pune](https://invariant-ai.com/blog/data-centres-in-pune) · [Data centres in Visakhapatnam](https://invariant-ai.com/blog/data-centres-in-visakhapatnam) · [Data centres in Gujarat: GIFT City, Ahmedabad, Jamnagar](https://invariant-ai.com/blog/data-centres-in-gujarat) · [Data centres in Kolkata and East India](https://invariant-ai.com/blog/data-centres-in-kolkata)

**Compare and invest:** [Mumbai vs Chennai vs Hyderabad](https://invariant-ai.com/blog/mumbai-vs-chennai-vs-hyderabad-data-centres) · [India vs Singapore vs Johor](https://invariant-ai.com/blog/india-vs-singapore-vs-johor-data-centres) · [AI data centres and IndiaAI GPUs](https://invariant-ai.com/blog/ai-data-centres-india) · [Data centre investment in India](https://invariant-ai.com/blog/data-centre-investment-india)

## Questions

### What is cross subsidy surcharge in open access?

A charge an open access consumer pays the discom for the cross subsidy the discom loses when that consumer buys power elsewhere. The state commission sets it under Section 42(2) of the Electricity Act 2003; for green open access it cannot rise by more than 50% over 12 years. ([Ministry of Power (gazette copy)](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)) ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf))

### What is additional surcharge in open access?

A charge under Section 42(4) of the Electricity Act 2003 that covers the discom’s fixed costs arising from its obligation to supply. Under the Green Energy Open Access Rules 2022 it does not apply to green open access consumers who pay fixed charges. ([Ministry of Power (gazette copy)](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)) ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf))

### What are wheeling charges for a data centre in India?

Charges for using the discom’s distribution network to carry power from the generator to the consumer, set in the state tariff order. In Maharashtra the March 2025 multi-year order set the HT wheeling component at ₹0.62/kVAh for FY 2025-26, since revised by review orders (current rate not verified), with a 10% discount for data centres on 100% green power. ([Maharashtra Electricity Regulatory Commission](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf))

### Do data centres pay cross subsidy surcharge on captive power?

Not if the plant meets the captive tests: at least 26% ownership and at least 51% of annual generation consumed by captive users, under Rule 3 as amended in March 2026. ([PIB, Ministry of Power](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2240205)) ([pv magazine India](https://www.pv-magazine-india.com/2026/03/31/reforming-captive-power-in-india-key-changes-under-the-electricity-amendment-rules-2026/))

### Which states waive open access charges for data centres?

Uttar Pradesh’s 2026 policy exempts transmission and wheeling up to 100% depending on the renewable source; Odisha’s 2022 policy reimburses them for in-state captive renewables; Tamil Nadu’s 2021 concessions applied to projects incorporated up to 31 March 2026. ([Invest UP](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/)) ([Invest Odisha](https://investodisha.gov.in/datacentre-policy)) ([Government of Tamil Nadu, via National Single Window System](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf))

## Sources

- Ministry of Power (gazette copy): [Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules 2022, G.S.R. 418(E)](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)
- Ministry of Power (gazette copy via REC Registry): [Electricity (Promoting Renewable Energy Through Green Energy Open Access) Amendment Rules 2023, G.S.R. 59(E), 27 January 2023](https://www.recregistryindia.nic.in/pdf/REC_Regulation/First_Amendment_Green_Energy_Open_Access_Rules_2023.pdf)
- MSEDCL: [Commercial Circular No. 346 (September 2024)](https://www.mahadiscom.in/consumer/wp-content/uploads/2024/09/Comm-Circular-No-346.pdf)
- PIB, Ministry of Power: [Electricity (Amendment) Rules 2026 on captive generation](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2240205)
- pv magazine India: [Reforming captive power in India: key changes under the Electricity (Amendment) Rules 2026](https://www.pv-magazine-india.com/2026/03/31/reforming-captive-power-in-india-key-changes-under-the-electricity-amendment-rules-2026/)
- Maharashtra Electricity Regulatory Commission: [MSEDCL multi-year tariff order, Case 217 of 2024 (28 March 2025)](https://www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf)
- Uttar Pradesh Electricity Regulatory Commission: [Tariff order FY 2026-27 for UPPCL distribution companies (2 July 2026)](https://www.uperc.org/App_File/UPPCLTariffOrder-pdf72202630517PM.pdf)
- PIB, Ministry of New and Renewable Energy: [Waiver of ISTS charges for renewable energy projects (Rajya Sabha reply, 17 March 2026)](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2241170)
- Invest UP: [Uttar Pradesh Data Centre Policy 2026](https://invest.up.gov.in/uttar-pradesh-data-centre-policy-2026/)
- Invest UP: [UP Data Centre Policy 2021](https://invest.up.gov.in/policies/up-data-centre-policy-2021/)
- Government of Tamil Nadu, via National Single Window System: [Tamil Nadu Data Centre Policy 2021](https://www.nsws.gov.in/s3fs/2021-12/Data%20Centre%20Policy%202021.pdf)
- Invest Odisha: [Odisha State Data Centre Policy 2022](https://investodisha.gov.in/datacentre-policy)
- Sanjay Laul & Co: [New Haryana Data Centre Policy 2026: capex, opex and fast-track approvals](https://www.sanjaylaulandco.com/post/new-haryana-data-centre-policy-2026-capex-opex-and-fast-track-approvals-for-digital-infrastructure)
- Cyril Amarchand Mangaldas: [Gujarat Data Center Policy 2026-2029](https://corporate.cyrilamarchandblogs.com/2026/07/gujarat-data-center-policy-2026-2029-a-push-for-large-scale-data-center-infrastructure/)

## Related

- [Green energy open access for data centres in India: rules, banking and ISTS (2026)](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india)
- [Power for data centres in India: grid supply, open access and tariffs by state](https://invariant-ai.com/blog/power-for-data-centres-india)
- [Data centre policy in India: state data centre policies compared (2026)](https://invariant-ai.com/blog/data-centre-policy-india-state-comparison)
- [Data centre cost per MW in India: ₹35 to 75 crore to build, plus land (2026)](https://invariant-ai.com/blog/data-centre-cost-per-mw-india)

---

[Email your India data centre project requirements](mailto:pranav@invariant-ai.com) · [Book a call](https://cal.com/pranav-goswami/website-30min)