# How to Check Power Outage and Road Closure History

> Find historical outages and road closures near a facility. Compare county readings, state snapshots, and I-40 reopening records from Hurricane Helene.

URL: https://invariant-ai.com/blog/power-outage-road-closure-history  
Published: 2026-11-23 · Publisher: Invariant · Region: Haywood County, North Carolina

To check disruption history near a facility, match local outage records to the service address and road reports to the routes people and freight actually use. County and state outage data help identify periods to investigate. After Hurricane Helene, Haywood County’s highest observed outage count was 23,076 customers on September 27, 2024. The damaged stretch of I-40 in the Pigeon River Gorge reopened with one lane in each direction on March 1, 2025.

## Key points

- Use county data to identify when to request exact service interruptions from the utility or facility operator.
- Save the observation time, reporting geography, and source. Keep missing measurements separate from reported zeros.
- Check reopening restrictions for the vehicles a facility needs. An open road can still have lane limits, detours or size restrictions.

## Where can I find outage and road closure history for a location?

| Decision | Record to request or download | What it can establish |
| --- | --- | --- |
| Did this facility lose utility service? | Serving utility’s service interruption record for the premise or meter, plus facility power logs. | A service-level timeline. Compare with generator or transfer-switch logs to see whether the site itself lost power. |
| When did the surrounding area have outages? | ORNL EAGLE-I county observations, DOE situation reports, or DOE-417 incident summaries. | Observed customer counts by reporting geography or incidents that meet the applicable reporting criteria. ([EAGLE-I county outage metadata](https://doi.ccs.ornl.gov/dataset/2be78213-ef9e-5433-b1b0-9762d051146c)) ([DOE Helene situation reports](https://www.energy.gov/ceser/hurricane-helene-situation-reports)) ([DOE-417 incident reports](https://doe417.energy.gov/)) |
| Could employees or trucks reach the site? | State or local DOT incident records and notices for the route, direction, entry point and vehicle class. | Reported closure, detour, reopening and restrictions for a specific road segment. ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices)) ([Road event dates and lane status](https://github.com/usdot-jpo-ode/wzdx/blob/develop/spec-content/objects/WorkZoneRoadEvent.md)) |

For a facility, use the service address and serving utility to request premise-level records. For road access, trace the primary and backup routes from the actual site entrance. Check the direction of travel and whether the detour is usable by the trucks or other vehicles the site relies on. ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices)) ([Road event dates and lane status](https://github.com/usdot-jpo-ode/wzdx/blob/develop/spec-content/objects/WorkZoneRoadEvent.md))

## How did reported power outages change after Helene?

EAGLE-I recorded its highest Haywood County count in the study window at 6:15 p.m. Eastern Daylight Time on September 27, 2024. The count was 23,076 customers. The window ran from September 25 through October 15 in local time. EAGLE-I provided values for 1,996 of the 2,016 quarter-hour slots. The download preserves all 20 missing observations and the one reported zero. ([EAGLE-I county outage metadata](https://doi.ccs.ornl.gov/dataset/2be78213-ef9e-5433-b1b0-9762d051146c)) ([Versioned EAGLE-I files and license](https://api.figshare.com/v2/articles/24237376/versions/4))

The Department of Energy published separate statewide snapshots. We joined them to county values only when the recorded timestamps matched exactly. The resulting table shows counts from each source at the same time, with each source’s geographic scope intact. ([DOE Helene situation reports](https://www.energy.gov/ceser/hurricane-helene-situation-reports)) ([Versioned EAGLE-I files and license](https://api.figshare.com/v2/articles/24237376/versions/4)) ([EAGLE-I time fields and methods](https://www.nature.com/articles/s41597-024-03095-5))

| 2024 observation time, EDT | North Carolina, DOE | Haywood County, EAGLE-I |
| --- | --- | --- |
| September 27, 3:00 p.m. | 896,206 | 21,524 |
| October 2, 3:00 p.m. | 333,662 | 7,387 |
| October 9, 10:00 a.m. | 83,340 | 302 |
| October 11, 10:00 a.m. | 50,392 | 1,385 |
| October 15, 12:30 p.m. | 13,104 | 13 |

The statewide snapshots kept falling between October 9 and 11 while the county readings at those times rose. The county series is based on utility public outage maps. It can include later interruptions or changes in reporting. The two counts alone cannot establish which customers lost or regained power, or why. ([October 9 state outage table](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Public%20Situation%20Report%2013.pdf#page=2)) ([October 11 state outage table](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Situation%20Report%2014.pdf#page=2)) ([October 15 state outage table](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Situation%20Report%2015.pdf#page=2)) ([Versioned EAGLE-I files and license](https://api.figshare.com/v2/articles/24237376/versions/4))

[Download the county time series, 15 state snapshots, and I-40 closure milestones (JSON)](https://invariant-ai.com/blog/power-outage-road-closure-history.json)

[Review site due diligence](https://invariant-ai.com/blog/site-selection-due-diligence)

## When did I-40 reopen in the Pigeon River Gorge?

NCDOT reported severe damage on September 27, 2024, and said it closed the interstate immediately. Traffic resumed March 1, 2025, a difference of 155 calendar days. NCDOT described a temporary pattern with one lane each way for about 12 miles between North Carolina Exit 7 and Tennessee Exit 447. ([NCDOT project and damage record](https://xfer.services.ncdot.gov/pdea/EnvironmentalPermits/Helene%20I-40%20Haywood%20Restoration/I-40%202025-06%20Application%20Package%20File%201%20of%202.pdf#page=2)) ([Temporary I-40 reopening restrictions](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-02-26-i-40-reopens-unusual-conditions.aspx)) ([Confirmed March 1 reopening](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-06-03-ncdot-selects-sites-rebuild-I-40-helene.aspx)) ([NCDOT closure and recovery review](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-09-26-helene-ncdot-one-year-milestone.aspx))

| Local date | Reported change | Effect on access |
| --- | --- | --- |
| September 27, 2024 | Helene damage prompted closure. | Through traffic stopped on the affected segment. ([NCDOT project and damage record](https://xfer.services.ncdot.gov/pdea/EnvironmentalPermits/Helene%20I-40%20Haywood%20Restoration/I-40%202025-06%20Application%20Package%20File%201%20of%202.pdf#page=2)) ([NCDOT closure and recovery review](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-09-26-helene-ncdot-one-year-milestone.aspx)) |
| December 20, 2024 | NCDOT reported additional roadway damage. | The agency delayed its planned temporary reopening. ([December closure update](https://www.ncdot.gov/news/press-releases/Pages/2024/2024-12-20-i-40-gorge-delay.aspx)) |
| March 1, 2025 | The temporary lanes opened. | One lane each way. North Carolina’s reopening guidance allowed standard 18-wheelers and excluded wide loads. ([Temporary I-40 reopening restrictions](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-02-26-i-40-reopens-unusual-conditions.aspx)) ([Confirmed March 1 reopening](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-06-03-ncdot-selects-sites-rebuild-I-40-helene.aspx)) |
| June 18–27, 2025 | A separate rockslide closed the gorge segment again. | The interval between closure and reopening dates was nine calendar days. ([June repeat closure chronology](https://storymaps.arcgis.com/stories/8887acbd2dbd4d28a68e79fe53cbfaa3)) |

For freight diligence, record the restrictions in effect at each reopening. NCDOT’s March guidance described a 35 mph limit on the North Carolina side and warned standard 18-wheelers against suggested local alternates beyond Exit 20. A historical opening date cannot answer whether the route is open today. For current conditions, check the relevant DOT traffic service. ([Temporary I-40 reopening restrictions](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-02-26-i-40-reopens-unusual-conditions.aspx)) ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices))

## What should an outage and road closure API return for a site?

Keep separate time fields for when an incident happened, when a count was observed, and when a source published or updated the record. Identify the geography and unit for power counts. Store the road segment and direction with closure state, restriction details, and whether an opening was scheduled or confirmed. Preserve gaps in coverage. ([DOE Helene situation reports](https://www.energy.gov/ceser/hurricane-helene-situation-reports)) ([Versioned EAGLE-I files and license](https://api.figshare.com/v2/articles/24237376/versions/4)) ([Road event dates and lane status](https://github.com/usdot-jpo-ode/wzdx/blob/develop/spec-content/objects/WorkZoneRoadEvent.md)) ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices))

Invariant Earth’s public field catalog documents nearby road names, classes and distances. Those fields can help identify candidate approaches before you check the official road event records for each route. When you assess resilience, keep documented service interruptions, utility-wide reliability statistics, and access interruptions attached to the right geography. ([Invariant Earth field catalog](https://api.invariant-ai.com/v1/meta/fields)) ([Utility reliability data](https://www.eia.gov/electricity/data/eia861/)) ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices))

[Compare annual freight volumes before checking route disruptions](https://invariant-ai.com/blog/freight-analysis-framework-data)

## Questions

### Can I find historical power outages by address?

Ask the serving utility for records associated with the service premise or meter, subject to the utility’s access rules. County and state data show surrounding conditions. Facility logs can establish how the site’s equipment and backup systems responded. ([EAGLE-I county outage metadata](https://doi.ccs.ornl.gov/dataset/2be78213-ef9e-5433-b1b0-9762d051146c)) ([DOE Helene situation reports](https://www.energy.gov/ceser/hurricane-helene-situation-reports))

### Does a missing outage record mean the power was on?

A missing observation leaves the customer count unknown. Keep missing values separate from a measured zero and use utility or facility records for conclusions about an individual site. ([EAGLE-I county outage metadata](https://doi.ccs.ornl.gov/dataset/2be78213-ef9e-5433-b1b0-9762d051146c)) ([Versioned EAGLE-I files and license](https://api.figshare.com/v2/articles/24237376/versions/4))

### How do I find past road closures near a property?

Use the DOT incident or public notice archive for the road, direction and segment. Save the closure date, the confirmed reopening, restrictions, and links to the notices. Check the current feed separately for travel planning. ([North Carolina traffic incident API](https://tims.ncdot.gov/tims/V2/webservices)) ([Temporary I-40 reopening restrictions](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-02-26-i-40-reopens-unusual-conditions.aspx)) ([Confirmed March 1 reopening](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-06-03-ncdot-selects-sites-rebuild-I-40-helene.aspx))

## Sources

- U.S. Department of Energy: [Hurricane Helene Situation Reports, DOE public archive of 15 reports](https://www.energy.gov/ceser/hurricane-helene-situation-reports)
- U.S. Department of Energy: [Helene Situation Report 13, North Carolina outage snapshot October 9](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Public%20Situation%20Report%2013.pdf#page=2)
- U.S. Department of Energy: [Helene Situation Report 14, North Carolina outage snapshot October 11](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Situation%20Report%2014.pdf#page=2)
- U.S. Department of Energy: [Helene Situation Report 15, North Carolina outage snapshot October 15](https://www.energy.gov/sites/default/files/2024-10/Hurricane%20Helene%20Situation%20Report%2015.pdf#page=2)
- Oak Ridge National Laboratory: [EAGLE-I Power Outage Data 2024 metadata and scope](https://doi.ccs.ornl.gov/dataset/2be78213-ef9e-5433-b1b0-9762d051146c)
- Oak Ridge National Laboratory: [EAGLE-I Recorded Electricity Outages 2014–2025, version 4, including the raw 2024 CSV](https://api.figshare.com/v2/articles/24237376/versions/4)
- Oak Ridge National Laboratory researchers: [EAGLE-I archival data dictionary, including UTC observation timestamps](https://www.nature.com/articles/s41597-024-03095-5)
- U.S. Department of Energy: [DOE-417 emergency disturbance reporting program and public annual summaries](https://doe417.energy.gov/)
- North Carolina Department of Transportation: [NCDOT Pigeon River Gorge restoration application, project location and September 2024 damage](https://xfer.services.ncdot.gov/pdea/EnvironmentalPermits/Helene%20I-40%20Haywood%20Restoration/I-40%202025-06%20Application%20Package%20File%201%20of%202.pdf#page=2)
- North Carolina Department of Transportation: [NCDOT one-year Helene review, I-40 closure and temporary reopening](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-09-26-helene-ncdot-one-year-milestone.aspx)
- North Carolina Department of Transportation: [NCDOT December 20, 2024 update, additional slide delays reopening](https://www.ncdot.gov/news/press-releases/Pages/2024/2024-12-20-i-40-gorge-delay.aspx)
- North Carolina Department of Transportation: [NCDOT March reopening configuration, segment endpoints, speed, and freight restrictions](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-02-26-i-40-reopens-unusual-conditions.aspx)
- North Carolina Department of Transportation: [NCDOT June follow-up confirming I-40 lanes opened March 1](https://www.ncdot.gov/news/press-releases/Pages/2025/2025-06-03-ncdot-selects-sites-rebuild-I-40-helene.aspx)
- NOAA National Centers for Environmental Information: [Helene in Southern Appalachia timeline, June 2025 repeat I-40 closure and reopening](https://storymaps.arcgis.com/stories/8887acbd2dbd4d28a68e79fe53cbfaa3)
- North Carolina Department of Transportation: [NCDOT Travel Information Management System public traffic web services](https://tims.ncdot.gov/tims/V2/webservices)
- U.S. Department of Transportation: [USDOT Work Zone Data Exchange road event data format](https://github.com/usdot-jpo-ode/wzdx/blob/develop/spec-content/objects/WorkZoneRoadEvent.md)
- U.S. Energy Information Administration: [Form EIA-861 electricity industry data, utility reliability reporting](https://www.eia.gov/electricity/data/eia861/)
- USDA Farm Production and Conservation: [USDA 2022 National Agriculture Imagery Program aerial mosaic](https://imagery.geoplatform.gov/iipp/rest/services/NAIP/NAIP2022_CONUS/ImageServer)
- Invariant Earth: [Invariant Earth public field catalog](https://api.invariant-ai.com/v1/meta/fields)

## Related

- [Warehouse site selection for rail, trucks and trailer parking](https://invariant-ai.com/blog/warehouse-site-selection-rail-truck-access)
- [How to check if a substation has capacity for a data center](https://invariant-ai.com/blog/data-center-substation-capacity-check)