{
  "name": "Redmond powered shell marketing, permit and utility records",
  "as_of": "2026-11-26",
  "version": "1.0.0",
  "methodology": "Compare two copies of the brokers’ Redmond conversion brochure available at review. Preserve the basis and date expression of each quoted quantity. Join the work address to the county’s 2012 export and keep the PacifiCorp regulatory records separate from project-specific evidence. PDF page references are one-based.",
  "property": {
    "address": "2999 SW 6th Street, Redmond, OR 97756",
    "building_area_sqft_marketed": 77260,
    "lot_area_acres_marketed_approximate": 13.13,
    "layout_marketed": "Mainly open office",
    "source_id": "redmond-brochure",
    "pdf_page": 3,
    "broker_directory_status": "Available",
    "status_observed_on": "2026-11-26",
    "availability_source_id": "redmond-directory",
    "utility_confirmed_deliverable_mw": null,
    "utility_confirmed_service_date": null,
    "commissioned_critical_it_mw": null,
    "current_purchase_terms_verified": null
  },
  "marketing_versions": [
    {
      "source_id": "redmond-brochure",
      "pdf_page": 6,
      "source_context": "Brochure linked from the Five 9s Digital inventory",
      "publication_date": null,
      "milestones": [
        {
          "quantity_mw": 6,
          "basis": "Utility load",
          "timing": "By end of 2026"
        },
        {
          "quantity_mw": 11,
          "approximate": true,
          "basis": "Marketed ramp",
          "timing": "Q1 to Q2 2027"
        }
      ],
      "regional_transmission_project_target_year_claimed": 2030
    },
    {
      "source_id": "redmond-brochure-copy",
      "pdf_page": 6,
      "source_context": "Brochure copy hosted by Baxtel",
      "publication_date": null,
      "milestones": [
        {
          "quantity_mw": 4,
          "basis": "Additional power",
          "timing": "End of 2026 or early 2027"
        },
        {
          "quantity_mw": 10,
          "basis": "Potential ramp associated with feeder and substation upgrades",
          "timing": "2027 to 2028 upgrade window"
        }
      ],
      "regional_transmission_project_target_year_claimed": 2032
    }
  ],
  "permit": {
    "source_id": "redmond-permit",
    "id": "711-B70073",
    "tax_lot_at_permit": "151321D000332",
    "situs": "2999 SW 6TH ST REDMOND OR 97756",
    "status": "Finaled",
    "issue_date": "2012-11-27",
    "final_date": "2012-11-27",
    "scope_summary": "Relocate and recable rooftop antennas",
    "supports": "Historical address and tax lot match"
  },
  "regional_tariff": {
    "docket": "UE 463",
    "order": "26-443",
    "order_date": "2026-11-13",
    "compliance_advice": "26-020",
    "compliance_filed_on": "2026-11-24",
    "effective_date_stated_in_filing": "2027-01-01",
    "schedule": "401",
    "large_energy_use_facility_statutory_definition_threshold_mw": 20,
    "statutory_classification": "Primarily providing a service in 2022 NAICS 518210",
    "application_fee_usd": 25000,
    "application_fee_nonrefundable": true,
    "engineering_studies_funded_separately": true,
    "initial_contract_years_min": 10,
    "initial_contract_years_max": 30,
    "term_includes_ramp": true,
    "application_at_redmond_verified": null,
    "source_ids": [
      "oregon-401-order",
      "oregon-401-filing"
    ]
  },
  "sources": [
    {
      "id": "redmond-directory",
      "title": "Oregon powered shell listing index",
      "publisher": "Five 9s Digital",
      "url": "https://www.five9sdigital.com/data-centers/",
      "sha256": "d9a0ccb26695969345e68552dd17fb42f680c154aab9cada83f2d5069ceae01e"
    },
    {
      "id": "redmond-brochure",
      "title": "Redmond power schedule in the broker directory’s linked brochure",
      "publisher": "Five 9s Digital and Romans Properties",
      "url": "https://assets.ctfassets.net/o03ihmgd94o7/6qKUjPyKMFhYAyTxhdMpDv/eccf8e3ee00ab2a5c03c5d9d445fa348/Redmond_OR_Power-Ready_Shell.pdf",
      "pdf_pages": [
        3,
        6
      ],
      "sha256": "aceb3d9560abca80de4412acdc2a996e6fed2a2e0a0faaeef58c869d56fce067"
    },
    {
      "id": "redmond-brochure-copy",
      "title": "Alternate Redmond brochure copy hosted by Baxtel",
      "publisher": "Five 9s Digital and Romans Properties",
      "url": "https://cdn.baxtel.com/data-center/redmond-or-4-10mw/files/Redmond_OR_Data_Center_Conversion_Opportunity__1_.pdf",
      "pdf_pages": [
        3,
        6,
        13
      ],
      "sha256": "1147d7ea3263dccd5a3fbfbc625ddda7b3513d80a49f1e34e7eba546e8ee57d7"
    },
    {
      "id": "redmond-permit",
      "title": "Deschutes County permit export for November 27, 2012",
      "publisher": "Deschutes County",
      "url": "https://webapps.deschutes.org/CDDPermits/Building/Export?startDate=11%2F27%2F2012&endDate=11%2F27%2F2012&fieldDelim=%2C&textDelim=%22&fileExt=csv",
      "sha256": "93a021e31bd74d83fdacd01a3664584cfcabb25c54a473785d8bb7c500709aab"
    },
    {
      "id": "oregon-401-order",
      "title": "Order 26-443 adopting the stipulation in docket UE 463",
      "publisher": "Oregon Public Utility Commission",
      "url": "https://apps.puc.state.or.us/orders/2026ords/26-443.pdf",
      "pdf_pages": [
        4,
        12,
        13,
        41
      ],
      "sha256": "be290a5a3daa44c98d30434e358a3ac58f920b2c7127f8feef05e2bb58c19107"
    },
    {
      "id": "oregon-401-filing",
      "title": "November 24 compliance filing and proposed Schedule 401 sheets",
      "publisher": "PacifiCorp",
      "url": "https://edocs.puc.state.or.us/efdocs/UHR/ue463uhr350945028.pdf",
      "pdf_pages": [
        1,
        18,
        19,
        21
      ],
      "sha256": "9b8173539b1fdab735683bc2577d6ae2a0777944d11bc8c7bc0d3e45d6812c5b"
    }
  ]
}
