  "title": "Tennessee certified industrial site evidence from two listing records",
  "sources_checked_on": "2026-11-22",
  "scope": "Published listing fields and selected public assessments. Listing source dates, current availability and project utility commitments were not established.",
  "sources": {
    "certification": "https://www.tn.gov/ecd/news/2024/9/12/tnecd-announces-two-new-select-tennessee-certified-sites.html",
    "program_criteria": "https://www.tn.gov/content/dam/tn/ecd/documents/certified-sites/Criteria-and-Definitions-June-2024.pdf#page=2",
    "tva_canterbury": "https://www.tva.com/environment/environmental-stewardship/environmental-reviews/nepa-detail/economic-development-grant-proposal-for-the-canterbury-site",
    "tva_canterbury_ea": "https://www.tva.com/docs/default-source/1-float/fy22_investprep_dickson_county_tn_eaff3cd386-f8ad-4f6f-83f9-b90bb2aed4d3.pdf",
    "tva_brownsville": "https://www.tva.com/environment/environmental-stewardship/environmental-reviews/nepa-detail/economic-development-grant-proposal-for-the-i-40-advantage-site",
    "ky_standards": "https://ced.ky.gov/edis/PDF/Site/BuildReady_Standards.pdf"
  },
  "sites": [
    {
      "name": "Canterbury Site",
      "county": "Dickson",
      "state": "TN",
      "source_url": "https://tnecd.com/certifiedsite/canterbury-site/",
      "source_response_sha256": "0d515360966d39c3273c6b4cb485d82862d6b1a1f7e5d3b616034007384b7724",
      "certification_announcement_date": "2024-09-12",
      "raw_listing_fields": {
        "Site Acreage": "30",
        "Developable Acreage": "24",
        "Additional acreage available": "15",
        "Zoning": "Light Industrial",
        "Electric line serving site": "12.47 kV & 7.2 kV",
        "Electric service to substation": "161 kV",
        "Excess water system capacity": "4.5 MGD",
        "Excess wastewater capacity": "1.0 MGD",
        "Rail Service": "Not Available",
        "Flood hazard": "Available"
      },
      "normalized_listing_fields": {
        "gross_site_acres": 30.0,
        "developable_acres": 24.0,
        "system_excess_water_mgd": 4.5,
        "system_excess_wastewater_mgd": 1.0
      },
      "project_specific_confirmations": {
        "for_sale_now": null,
        "contiguous_usable_acres": null,
        "electric_service_mw": null,
        "water_allocation_mgd": null,
        "wastewater_allocation_mgd": null,
        "service_date": null
      }
    },
    {
      "name": "I-40 Advantage Industrial Park Site",
      "county": "Haywood",
      "state": "TN",
      "source_url": "https://tnecd.com/certifiedsite/i-40-advantage-industrial-park-site/",
      "source_response_sha256": "91033e55eecf3e02c96b48d234f835171299f523491806938c2c0b8454fc331e",
      "certification_announcement_date": "2024-09-12",
      "raw_listing_fields": {
        "Site Acreage": "160 acres",
        "Developable Acreage": "154 acres",
        "Additional acreage available": "95 acres",
        "Zoning": "General Industrial",
        "Electric line serving site": "13 kV",
        "Electric service to substation": "161 kV",
        "Excess water system capacity": "2.5 MGD",
        "Excess wastewater capacity": "1.0 MGD",
        "Rail Service": "CSX Railroad adjacent to park",
        "Flood hazard": "Available"
      },
      "normalized_listing_fields": {
        "gross_site_acres": 160.0,
        "developable_acres": 154.0,
        "system_excess_water_mgd": 2.5,
        "system_excess_wastewater_mgd": 1.0
      },
      "project_specific_confirmations": {
        "for_sale_now": null,
        "contiguous_usable_acres": null,
        "electric_service_mw": null,
        "water_allocation_mgd": null,
        "wastewater_allocation_mgd": null,
        "service_date": null
      }
    }
  ],
  "public_environmental_review_records": [
    {
      "site": "Canterbury Site",
      "publisher": "Tennessee Valley Authority",
      "record": "FY22 InvestPrep environmental assessment and FONSI",
      "project_area_acres": 28.4,
      "larger_site_described_acres": 55,
      "report_reference": "Sections 1, 4.1, and 4.2",
      "mapped_floodplain_finding": "The assessment places the 28.4-acre project area outside the identified 100-year floodplain in its cited FEMA panel.",
      "firm_panel": "47043C0265C",
      "firm_panel_effective_date_in_report": "2009-09-25",
      "wetland_documented_outside_project_area_acres": 0.14,
      "source": "https://www.tva.com/docs/default-source/1-float/fy22_investprep_dickson_county_tn_eaff3cd386-f8ad-4f6f-83f9-b90bb2aed4d3.pdf"
    },
    {
      "site": "I-40 Advantage Industrial Park Site",
      "publisher": "Tennessee Valley Authority",
      "record": "Environmental assessment and FONSI for proposed development grant",
      "decision_date": "2025-06-09",
      "project_area_acres": 110,
      "scope_summary": "The review covered a proposal involving clearing, grading for a dirt pad and rerouting a gravel access road.",
      "source": "https://www.tva.com/environment/environmental-stewardship/environmental-reviews/nepa-detail/economic-development-grant-proposal-for-the-i-40-advantage-site"
    }
  ],
  "illustrative_screen": {
    "scope": "A screening exercise, not a review for an actual manufacturer or a current utility capacity check. Water is reported system excess, not service committed to the parcel.",
    "minimum_reported_developable_acres": 25,
    "minimum_reported_system_excess_water_mgd": 3.0,
    "results": [
      {
        "site": "Canterbury Site",
        "public_listing_meets_acreage_threshold": false,
        "public_listing_meets_system_water_threshold": true
      },
      {
        "site": "I-40 Advantage Industrial Park Site",
        "public_listing_meets_acreage_threshold": true,
        "public_listing_meets_system_water_threshold": false
      }
    ]
  }
}