A shovel-ready designation tells you what a site program reviewed. To decide whether a factory can start on schedule, check the exact tract, the accepted land use, the usable acreage and the utilities that can commit to the project. Two sites in the same Tennessee certification announcement illustrate the difference. One clears the example acreage requirement. The other clears the initial water screen.

## Key points

- Keep the certifying program, date and tract boundary with the designation.
- Compare usable site area with the latest layout and keep related acreage figures tied to their original boundaries.
- Ask each provider for a service offer at the proposed connection point, including the project’s volume, required upgrades and delivery date.
- Publish an evidence date and a next action for every open constraint in the inventory.

## What shovel-ready certification covers

Select Tennessee generally requires at least 20 developable acres, truck-quality access, documented site conditions and utilities onsite or a formal extension plan. A site in an industrial park in a Tier 3 or Tier 4 county can qualify with 15 developable acres. The program accepts current zoning or an expedited rezoning plan. For a buyer, the difference between an installed connection and an extension plan can be months of work. ([Tennessee Department of Economic and Community Development](https://www.tn.gov/content/dam/tn/ecd/documents/certified-sites/Criteria-and-Definitions-June-2024.pdf#page=2)) ([Tennessee Department of Economic and Community Development](https://www.tn.gov/ecd/news/2024/9/12/tnecd-announces-two-new-select-tennessee-certified-sites.html))

Read the actual program rules when comparing badges. Kentucky’s separate Build-Ready designation builds on its shovel-ready criteria and requires a completed, engineer-certified pad for a building of at least 50,000 square feet, with room to expand to at least 100,000. The building pad and its expansion area are distinct from the gross tract acreage. ([Kentucky Cabinet for Economic Development](https://ced.ky.gov/edis/PDF/Site/BuildReady_Standards.pdf))

## Compare two certified Tennessee sites

Tennessee named Canterbury in Dickson and I-40 Advantage in Brownsville in the same September 2024 certification announcement. The state’s public listings report different combinations of acreage, zoning and utility characteristics. The table uses the public records as reviewed on November 22, 2026. Confirm present availability and which tract is offered before using either site in a live search. ([Tennessee Department of Economic and Community Development](https://www.tn.gov/ecd/news/2024/9/12/tnecd-announces-two-new-select-tennessee-certified-sites.html)) ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/canterbury-site/)) ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/i-40-advantage-industrial-park-site/))

| Published field | Canterbury Site | I-40 Advantage Industrial Park |
| --- | --- | --- |
| Gross / developable acres | 30 / 24 | 160 / 154 |
| Zoning | Light Industrial | General Industrial |
| Reported excess water system capacity | 4.5 MGD | 2.5 MGD |
| Reported excess wastewater system capacity | 1.0 MGD | 1.0 MGD |
| Electric service to the substation | 161 kV | 161 kV |
| Rail | No service listed | CSX adjacent to the park |

Sources: ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/canterbury-site/)) ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/i-40-advantage-industrial-park-site/))

Suppose a manufacturer needs at least 25 contiguous developable acres and 3 million gallons per day (MGD) of water. Canterbury’s listed 24 developable acres are below the acreage requirement. Brownsville’s listed 154 developable acres clear the numerical acreage screen, subject to a layout and contiguity check. Its 2.5 MGD of reported system excess water capacity is below the initial water screen. The public figures leave a blocker at each site. For a live decision, ask the water provider what it can actually commit to at the parcel, including flow and pressure at peak demand. ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/canterbury-site/)) ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/i-40-advantage-industrial-park-site/))

The equal 161 kV entries describe voltage at the substation. To compare deliverable electric service, request MW, voltage at the meter, reliability, deposit and upgrade requirements, and the service date. Wastewater also needs its own confirmation for flow, pollutant limits and pretreatment. A rail line next to a park only identifies a connection to investigate.

[Download the two site records and example screen (JSON)](https://invariant-ai.com/blog/shovel-ready-industrial-site-checklist.json)

[Screen a site with the API](https://docs.invariant-ai.com/screen-a-site)

## Check what land each study reviewed

TVA’s Canterbury assessment covered proposed work on 28.4 acres of a larger site it described as 55 acres. It placed that project area outside the identified 100-year floodplain on its cited FEMA panel. It also documented a roughly 0.14-acre wetland on the larger site outside the project area. The acreage in the report answers a different question from the 24 developable acres in the state listing. Use the report boundary and map date when repeating the comparison. ([Tennessee Valley Authority](https://www.tva.com/docs/default-source/1-float/fy22_investprep_dickson_county_tn_eaff3cd386-f8ad-4f6f-83f9-b90bb2aed4d3.pdf)) ([Tennessee Department of Economic and Community Development](https://tnecd.com/certifiedsite/canterbury-site/))

At Brownsville, TVA completed a June 2025 environmental review of proposed work on 110 acres, including clearing, grading for a dirt pad and rerouting a gravel road. That report follows the September 2024 certification announcement. Ask for the dated as-built pad certification or survey to establish what work is in place for the tract being offered. ([Tennessee Valley Authority](https://www.tva.com/environment/environmental-stewardship/environmental-reviews/nepa-detail/economic-development-grant-proposal-for-the-i-40-advantage-site)) ([Tennessee Department of Economic and Community Development](https://www.tn.gov/ecd/news/2024/9/12/tnecd-announces-two-new-select-tennessee-certified-sites.html))

**Diligence for the actual site:** [Verify contiguous manufacturing acreage and rail](https://invariant-ai.com/blog/manufacturing-site-selection-100-buildable-acres) · [Check the FEMA map vintage and revisions](https://invariant-ai.com/blog/fema-flood-zone-history-for-underwriting)

## What to publish in an industrial site inventory

Build the inventory around an identifiable tract. Retain each source record with its own date and geographic scope. Publish certification and project fit as separate fields so a buyer can see why a site is listed and which evidence would move it onto a shortlist.

| Inventory entry | Evidence to attach |
| --- | --- |
| Tract and availability | Parcel IDs, a boundary for the offered land, current owner or option holder, last confirmation date and any partial disposition. |
| Buildable land | Survey and measured usable acres, development envelope, pad status, access easements, flood map dates and delineation limits. |
| Zoning and approvals | Jurisdiction, zoning district, permitted use or approval needed, and the approvals and conditions that apply to the buyer’s proposed layout. |
| Utilities | Provider, point of service, status of the extension, service offered to the project, delivery date, cost responsibility and signed or dated evidence. |
| Verification history | Source publication date, date the field was checked, evidence owner and next action. Retain previous values when a tract or utility status changes. |

**Related records:** [Use the site selection due diligence checklist](https://invariant-ai.com/blog/site-selection-due-diligence) · [Trace facility permits to a parcel](https://invariant-ai.com/blog/industrial-environmental-permit-history-by-parcel) · [Compare GIS APIs for site selection](https://invariant-ai.com/blog/best-gis-apis-for-site-selection)

## Questions

### Does shovel-ready mean utilities are already connected?

Check the certifying program and the provider’s evidence. Tennessee’s program can accept a formal extension plan. The provider’s service offer should identify the connection, offered capacity, upgrades and date for your project. ([Tennessee Department of Economic and Community Development](https://www.tn.gov/content/dam/tn/ecd/documents/certified-sites/Criteria-and-Definitions-June-2024.pdf#page=2))

### What is the difference between shovel-ready and pad-ready?

Shovel-ready describes the work and evidence required by the program. A pad-ready claim concerns a specific building pad. For example, Kentucky’s Build-Ready standards require a completed pad certified by a licensed engineer. Ask for the certification and the pad dimensions. ([Kentucky Cabinet for Economic Development](https://ced.ky.gov/edis/PDF/Site/BuildReady_Standards.pdf))

### How do I verify a listed site’s water capacity?

Ask the water provider for written confirmation of the available project volume, peak flow, pressure, connection location and service date. Keep the number labeled as system capacity until the provider confirms what it can allocate to the project.

## Sources

- Tennessee Department of Economic and Community Development: [Select Tennessee certification announcement, September 12, 2024](https://www.tn.gov/ecd/news/2024/9/12/tnecd-announces-two-new-select-tennessee-certified-sites.html)
- Tennessee Department of Economic and Community Development: [Select Tennessee Certified Sites criteria](https://www.tn.gov/content/dam/tn/ecd/documents/certified-sites/Criteria-and-Definitions-June-2024.pdf#page=2)
- Tennessee Department of Economic and Community Development: [Canterbury Site listing](https://tnecd.com/certifiedsite/canterbury-site/)
- Tennessee Department of Economic and Community Development: [I-40 Advantage Industrial Park Site listing](https://tnecd.com/certifiedsite/i-40-advantage-industrial-park-site/)
- Tennessee Valley Authority: [Canterbury environmental assessment, sections 1, 4.1 and 4.2](https://www.tva.com/docs/default-source/1-float/fy22_investprep_dickson_county_tn_eaff3cd386-f8ad-4f6f-83f9-b90bb2aed4d3.pdf)
- Tennessee Valley Authority: [I-40 Advantage environmental review, June 9, 2025](https://www.tva.com/environment/environmental-stewardship/environmental-reviews/nepa-detail/economic-development-grant-proposal-for-the-i-40-advantage-site)
- Kentucky Cabinet for Economic Development: [Kentucky Build-Ready Standards](https://ced.ky.gov/edis/PDF/Site/BuildReady_Standards.pdf)

## Related

- [Manufacturing site selection for 100 buildable acres](https://invariant-ai.com/blog/manufacturing-site-selection-100-buildable-acres)
- [Environmental permits and enforcement by parcel](https://invariant-ai.com/blog/industrial-environmental-permit-history-by-parcel)
- [Best GIS APIs for U.S. site selection](https://invariant-ai.com/blog/best-gis-apis-for-site-selection)