# Virginia retired power plant site for data centers: about 1.2 GW former plant, transmission on site

> A retired Virginia power plant site (eastern) with about 1.2 GW of former generation and high-voltage transmission still on site. Not listed for sale; we approach the owner for qualified buyers. Details on a call or at market.invariant-ai.com.

URL: https://invariant-ai.com/blog/virginia-retired-power-plant-site-1-2-gw-data-center  
Published: 2026-11-19 · Updated: 2026-11-22 · Publisher: Invariant · Region: Virginia, United States

We are tracking a retired power plant site in eastern Virginia that once generated about 1.2 GW. The plant is shut, but the switchyard and the high-voltage lines that carried its output are still there. The site sits in the coastal part of the state, in PJM, the most active data center market in the country.

## Key points

- Power: about 1.2 GW former generating capacity, high-voltage transmission on site. The public listing gives no confirmed MW for new load.
- Land: About 115 acres on the plant parcel, outside the 100-year floodplain.
- Grid: PJM.
- Status: Off-market: not listed for sale; we approach the owner on a buyer's behalf.
- Location, utility documents and price are shared on a call.

## What we can share publicly

| Item | Summary |
| --- | --- |
| Power | about 1.2 GW former generating capacity, high-voltage transmission on site. The public listing gives no confirmed MW for new load |
| Land | About 115 acres on the plant parcel, outside the 100-year floodplain |
| Grid | PJM |
| Status | Off-market: not listed for sale; we approach the owner on a buyer's behalf |
| Use | AI, HPC and large colocation campuses |
| Price and terms | Shared on a call |

Sources: ([U.S. Energy Information Administration](https://www.eia.gov/electricity/state/virginia/)) ([PJM](https://www.pjm.com/))

## Why this site is worth a call

Existing lines and a switchyard can help identify connection options. Ask the owner about access and the serving utility about the new load it can study, the upgrades it expects and the resulting service schedule.

## Who this site fits

Developers and hyperscalers who want a PJM campus on built transmission and can work through a brownfield redevelopment. Not suited to buyers who need power energized within months.

## What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

- Exact location, parcel and owner
- Switchyard and interconnection details
- Site risk and power reports
- Approach to the owner and likely terms
- Comparable sites that fit your load

If this one is not right, we bring others that are. Most of what we place is never posted.

## Questions

### How much power could a data center get at the Virginia plant site?

The plant generated about 1.2 GW. The utility would need to evaluate the load and the point of delivery to establish usable MW, upgrades and a service date.

### How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

### Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

### Where can I find more data center sites like this?

Browse Invariant Market at https://market.invariant-ai.com. It lists over 100 US powered sites with a free teaser for each, plus risk, power and full site reports you can unlock.

## Sources

- U.S. Energy Information Administration: [EIA Virginia electricity profile](https://www.eia.gov/electricity/state/virginia/)
- PJM: [PJM Interconnection](https://www.pjm.com/)

## Related

- [Powered Land for Sale in the U.S. | Data Center and Mining Sites](https://invariant-ai.com/blog/powered-land-for-sale-data-center-sites)
- [Virginia Data Center Sites for Sale and Powered Land](https://invariant-ai.com/blog/data-center-sites-for-sale-virginia)
- [Retired power plant sites for data centers: what transfers and what can sink the deal](https://invariant-ai.com/blog/retired-power-plant-sites-for-data-centers)

---

Site screens and power studies: pranav@invariant-ai.com, (628) 220-8972, https://cal.com/pranav-goswami/website-30min
