# Water Withdrawal Data APIs, Water Rights, and Site Allocation

> Compare U.S. water withdrawal APIs, water rights and utility allocation records. Reproduce a Loudoun and Fairfax County watershed query and see what to verify for a site.

URL: https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation  
Published: 2026-11-23 · Publisher: Invariant · Region: United States

Use the USGS Water Availability Assessment API to compare modeled withdrawals across watersheds. For a project that will draw directly from a well or river, verify the applicable water right or withdrawal permit. For a utility connection, ask the supplier for the volume, pressure, connection point and service date it can commit to. Invariant Earth helps tie the site to a mapped water system and basin so the team can request the right records.

## Key points

- A county filter in the USGS Data Companion can return whole watersheds that cross county lines. Join on the watershed ID and month before comparing results.
- Read the water right or withdrawal permit for the applicable location, allowed use, season and restrictions.
- Verify the site’s peak-day demand, instantaneous flow, potable backup and wastewater terms with the supplier before relying on a service date.

## How do I get water withdrawal data by county or watershed?

The USGS National Water Availability Assessment Data Companion can return monthly modeled values for a watershed. We asked for the public-supply withdrawal variable pswdtot in 2020 using the county filter for Loudoun and Fairfax. The API returned complete records for 22 watersheds overlapping Loudoun and 17 overlapping Fairfax. Four watershed IDs appeared in both responses with identical values in every month. A HUC12 is a 12-digit identifier for a subwatershed. ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/)) ([USGS model metadata](https://api.water.usgs.gov/nwaa-data/models/wu-public-supply-wd)) ([Loudoun API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51107&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([Fairfax API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51059&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0))

| USGS query | Overlapping watersheds | Wholly contained watersheds |
| --- | --- | --- |
| Loudoun County, Virginia | 22 | 5 ([Loudoun API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51107&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/)) |
| Fairfax County, Virginia | 17 | 2 ([Fairfax API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51059&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/)) |
| Combined unique overlap results | 35 | Checked separately by county ([Loudoun API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51107&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([Fairfax API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51059&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) |

If you add both overlap lists for July 2020 you count the four shared watersheds twice, adding 68.97 million gallons per day (MGD) to the unique-watershed sum. Deduplicating gives 35 unique watersheds. For a county total, use data published for the county or a defensible estimate from source locations. Selecting wholly contained watersheds leaves out portions of the county. Even a deduplicated sum includes the parts of watersheds outside both counties. ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/)) ([Loudoun API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51107&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([Fairfax API result](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51059&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)) ([Historic and recent USGS datasets](https://www.usgs.gov/mission-areas/water-resources/science/accessing-water-use-data))

The model for this example runs through December 2020. USGS also publishes historical county-level compilations, including 2015 estimates across multiple sectors. Save the geography, model, variable, period and units with any figure. Keep withdrawn water separate from consumptive use, the portion that does not return to the water system of interest. ([USGS model metadata](https://api.water.usgs.gov/nwaa-data/models/wu-public-supply-wd)) ([Historic and recent USGS datasets](https://www.usgs.gov/mission-areas/water-resources/science/accessing-water-use-data))

[Download the 420 monthly rows for the 35 unique watersheds (CSV)](https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation.csv)

[Review site due diligence](https://invariant-ai.com/blog/site-selection-due-diligence)

[Download exact API queries, source dates and the Loudoun Water records (JSON)](https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation.json)

## What does a water right or withdrawal permit establish?

For a self-supply project, start with the regulator’s current record. Verify the authorized withdrawal location, source, holder, use, quantity and dates. Read the conditions on low flows, pumping, storage, seasonality and changes in ownership or use. Treat a reported withdrawal as historical use for the scope and period shown. Virginia’s reporting and permitting programs collect different information. ([Virginia withdrawal reporting](https://www.deq.virginia.gov/water/water-quantity/water-supply-planning/water-withdrawal-reporting)) ([Virginia withdrawal permits](https://www.deq.virginia.gov/water/water-withdrawal)) ([Oregon Water Rights Information System](https://www.oregon.gov/owrd/programs/waterrights/wris/pages/default.aspx))

At Loudoun Water, FEMA’s 2023 assessment described a conditional Potomac withdrawal under Virginia permit 10-2020. In the scenario without raw-water storage, when flow at the Point of Rocks gauge fell below 1,400 cubic feet per second, the stated limit was tied to Broad Run’s treated discharge the day before. That is an example of how a permit can depend on conditions. Obtain the current permit and any modifications before applying the rule. ([FEMA assessment of withdrawal conditions](https://www.fema.gov/sites/default/files/documents/fema_r3-pdmc-pj-03-va-2019-005-loudounwater-fea-signedfonsi-20231116.pdf#page=14))

Treatment capacity is a separate constraint. Loudoun Water’s 2026–2035 capital plan describes a 20 MGD starting capacity at Trap Rock and describes Phase II as 32.8 MGD in the project text. The project name and planning comments use 32 MGD. Keep both references and ask the utility which design capacity and commissioning date to use. The capital plan records planned work and does not assign capacity to a property. ([Trap Rock Phase II project sheet](https://www.loudounwater.org/sites/default/files/2026-05/__2026-2035_CIP_FINAL_with203.pdf#page=120))

## What water allocation should a developer request?

Ask for the source and connection point by phase, the maximum day and peak instantaneous flow, available pressure, fire flow, and the utility’s start date and conditions. For reclaimed water, get a written allocation and verify the terms for potable backup, including what happens during an outage. For discharge, confirm permitted volume and water quality with the receiving system. A location inside a mapped service area is where to begin the conversation. ([Reclaimed Water Program](https://www.loudounwater.org/commercial-customers/reclaimed-water-program)) ([Loudoun Water permitting and allocation documents](https://www.loudounwater.org/developers-new-construction/permitting-your-approved-project)) ([EPA water system boundaries](https://www.epa.gov/ground-water-and-drinking-water/public-water-system-service-areas))

Loudoun Water’s 2026 availability-charge guidelines distinguish maximum-day process water from average-day sewer. On an illustrative 100,000-square-foot water-cooled data center, the process-meter factors yield 100,000 gallons on the maximum water day and 12,500 gallons on the average sewer day. They omit the domestic meter. Use the project engineer’s cooling design and the utility’s approved flow and allocation before budgeting or committing to a site. ([Loudoun Water estimated-flow guidelines](https://www.loudounwater.org/rates-fees-charges-penalties)) ([Loudoun Water permitting and allocation documents](https://www.loudounwater.org/developers-new-construction/permitting-your-approved-project))

## Which water data sources and APIs should I use?

Invariant Earth is a starting point when the decision begins with an address or parcel. Its public catalog documents the mapped community water system, the origin of that boundary, and the USGS long-run watershed supply-and-use index. Use the matched system and basin to find the supplier, permit records and the relevant local constraints. ([Invariant Earth field catalog](https://api.invariant-ai.com/v1/meta/fields)) ([EPA water system boundaries](https://www.epa.gov/ground-water-and-drinking-water/public-water-system-service-areas))

| Source | What to use it for | What to verify |
| --- | --- | --- |
| Invariant Earth and EPA | Identify a mapped water system and inspect the source of the boundary. | Confirm the proposed parcel, utility and planned connection with the provider. ([Invariant Earth field catalog](https://api.invariant-ai.com/v1/meta/fields)) ([EPA water system boundaries](https://www.epa.gov/ground-water-and-drinking-water/public-water-system-service-areas)) |
| USGS Water Availability Assessment Data Companion | Compare modeled withdrawals and other basin variables by time and hydrologic unit. | Keep the HUC12, units, model vintage and intersection rule. ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/)) ([USGS model metadata](https://api.water.usgs.gov/nwaa-data/models/wu-public-supply-wd)) |
| WRI Aqueduct | Compare baseline and future water stress across markets. | Check the indicator, scale, scenario and assumptions before using it in site diligence. ([Aqueduct source and model scope](https://www.wri.org/data/aqueduct-global-maps-40-data)) |
| State permit and water-right records | Look up a named permit, certificate, transfer or reported withdrawal. | Check status, identifiers, allowed use, diversion location, time limits and the signed record. ([Virginia withdrawal permits](https://www.deq.virginia.gov/water/water-withdrawal)) ([Oregon Water Rights Information System](https://www.oregon.gov/owrd/programs/waterrights/wris/pages/default.aspx)) |
| WaDE or WestDAAT | Research historical western water-record coverage across states. | The operator lists March 2026 as the last update. Verify current status with the issuing state. ([WaDE archive and state portals](https://westernstateswater.org/wade/)) |
| Serving utility | Confirm an allocation, delivery date, pressure and wastewater terms for the project. | Save the signed terms and distinguish potable, reclaimed and backup supply. ([Loudoun Water permitting and allocation documents](https://www.loudounwater.org/developers-new-construction/permitting-your-approved-project)) ([Reclaimed Water Program](https://www.loudounwater.org/commercial-customers/reclaimed-water-program)) |

**Related Invariant site-selection guides:** [Find the serving water and sewer providers](https://invariant-ai.com/blog/water-sewer-data-apis-site-selection) · [Check cooling water, wastewater and stormwater permitting](https://invariant-ai.com/blog/data-center-water-stormwater-permits) · [Verify natural gas delivery for the same site](https://invariant-ai.com/blog/natural-gas-pipeline-capacity-site-service) · [Screen industrial land for utility, rail and development needs](https://invariant-ai.com/blog/manufacturing-site-selection-100-buildable-acres)

## Questions

### Which API gives water withdrawals by county?

USGS offers historic county-level compilations. The National Water Availability Assessment Data Companion uses county filters to select modeled watersheds. For the Data Companion, inspect the returned watershed IDs and intersection mode before calculating a total. ([Historic and recent USGS datasets](https://www.usgs.gov/mission-areas/water-resources/science/accessing-water-use-data)) ([USGS water data API documentation](https://water.usgs.gov/nwaa-data/web-services/))

### Where can I check water rights for an industrial site?

Look up the record with the issuing state or basin authority. Confirm its status, holder, authorized source and use, diversion location, rate and volume, effective dates and conditions. Verify transfer requirements for the proposed project. ([Virginia withdrawal permits](https://www.deq.virginia.gov/water/water-withdrawal)) ([Oregon Water Rights Information System](https://www.oregon.gov/owrd/programs/waterrights/wris/pages/default.aspx))

### What is the difference between water withdrawal and water consumption?

A withdrawal measures water removed or diverted from a source. Consumptive use measures the part of the withdrawal that is not returned, for example water that evaporates or becomes part of a product. Keep the source’s spatial boundary and time period in the calculation. ([Historic and recent USGS datasets](https://www.usgs.gov/mission-areas/water-resources/science/accessing-water-use-data))

### How do I confirm water availability for a proposed data center?

Give the supplier the site boundary, cooling design, peak flow by phase, needed pressure, service date, backup and wastewater requirements. Get the allocation and delivery conditions in writing. For self-supply, confirm the applicable permit and water source. ([Reclaimed Water Program](https://www.loudounwater.org/commercial-customers/reclaimed-water-program)) ([Loudoun Water permitting and allocation documents](https://www.loudounwater.org/developers-new-construction/permitting-your-approved-project)) ([Virginia withdrawal permits](https://www.deq.virginia.gov/water/water-withdrawal))

## Sources

- U.S. Geological Survey: [USGS NWDC API documentation and county intersection query semantics](https://water.usgs.gov/nwaa-data/web-services/)
- U.S. Geological Survey: [Public Supply Withdrawals Water-Use Model and data vintage](https://api.water.usgs.gov/nwaa-data/models/wu-public-supply-wd)
- U.S. Geological Survey: [Accessing USGS water-use data and historical estimates](https://www.usgs.gov/mission-areas/water-resources/science/accessing-water-use-data)
- U.S. Geological Survey: [July and monthly 2020 overlap query for Loudoun County, FIPS 51107](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51107&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)
- U.S. Geological Survey: [July and monthly 2020 overlap query for Fairfax County, FIPS 51059](https://api.water.usgs.gov/nwaa-data/data?model=wu-public-supply-wd&variable=pswdtot&location=countycd:51059&startdate=2020-01&enddate=2020-12&intersection=overlap&timeres=monthly&limit=600&format=json&skip=0)
- U.S. Environmental Protection Agency: [Public water system service area boundaries and their limits](https://www.epa.gov/ground-water-and-drinking-water/public-water-system-service-areas)
- Invariant Earth: [Invariant Earth public field catalog, including water-system identity and basin context](https://api.invariant-ai.com/v1/meta/fields)
- Virginia Department of Environmental Quality: [Virginia DEQ reported annual withdrawals and reporting thresholds](https://www.deq.virginia.gov/water/water-quantity/water-supply-planning/water-withdrawal-reporting)
- Virginia Department of Environmental Quality: [Virginia groundwater and surface-water withdrawal program](https://www.deq.virginia.gov/water/water-withdrawal)
- Federal Emergency Management Agency: [Final environmental assessment, section 2.1, prior conditions under VWP permit 10-2020](https://www.fema.gov/sites/default/files/documents/fema_r3-pdmc-pj-03-va-2019-005-loudounwater-fea-signedfonsi-20231116.pdf#page=14)
- Loudoun Water: [2026–2035 Capital Improvement Plan, project PWS00007, printed page 118](https://www.loudounwater.org/sites/default/files/2026-05/__2026-2035_CIP_FINAL_with203.pdf#page=120)
- Loudoun Water: [Estimated-flow guidelines, table 3, effective January 1, 2026](https://www.loudounwater.org/rates-fees-charges-penalties)
- Loudoun Water: [Reclaimed water allocation, constraints and delivered volumes](https://www.loudounwater.org/commercial-customers/reclaimed-water-program)
- Loudoun Water: [Development permit and connection document requirements](https://www.loudounwater.org/developers-new-construction/permitting-your-approved-project)
- World Resources Institute: [Aqueduct 4.0 baseline and future regional water risk indicators](https://www.wri.org/data/aqueduct-global-maps-40-data)
- Western States Water Council: [WaDE and WestDAAT archive status and state source guidance](https://westernstateswater.org/wade/)
- Oregon Water Resources Department: [Water Rights Information System records and document caveats](https://www.oregon.gov/owrd/programs/waterrights/wris/pages/default.aspx)
- U.S. Census Bureau: [Census TIGERweb State and County geometry service](https://tigerweb.geo.census.gov/arcgis/rest/services/TIGERweb/State_County/MapServer/1)

## Related

- [Water and Sewer Data APIs for Site Selection](https://invariant-ai.com/blog/water-sewer-data-apis-site-selection)
- [Data center water and stormwater permits](https://invariant-ai.com/blog/data-center-water-stormwater-permits)
- [Natural Gas Pipeline Capacity and Site Service](https://invariant-ai.com/blog/natural-gas-pipeline-capacity-site-service)
- [Manufacturing site selection for 100 buildable acres](https://invariant-ai.com/blog/manufacturing-site-selection-100-buildable-acres)
