# Green Energy Open Access Rules 2022 (GEOA)

> The Green Energy Open Access Rules 2022 let consumers with 100 kW or more of contracted demand buy renewable power through open access, with approval deemed after 15 days and limits on the surcharges states can charge.

URL: https://invariant-ai.com/glossary/green-energy-open-access  
Updated: 2026-11-21 · Publisher: Invariant

Also called: green energy open access, GEOA rules 2022, green open access, green energy open access rules

The Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules 2022, G.S.R. 418(E) of 6 June 2022, make consumers with contracted demand or sanctioned load of 100 kW or more eligible, with no limit for captive consumers. Applications go through a central nodal agency portal and are deemed approved if not decided within 15 days. Banking is allowed at least monthly for at least 30% of the consumer’s monthly consumption from the discom.

The Rules as made limited charges to transmission, wheeling, cross subsidy surcharge and standby charges; an amendment of 27 January 2023 (G.S.R. 59(E)) added banking charges and other fees such as load despatch centre fees, scheduling charges and deviation settlement charges. The cross subsidy surcharge may not rise by more than 50% of the level fixed for the year open access is granted, during 12 years from the date the plant began operating, and the additional surcharge does not apply to a consumer who is paying fixed charges.

## Sources

- [Ministry of Power, Green Energy Open Access Rules 2022, G.S.R. 418(E), 6 June 2022](https://www.acma.in/uploads/ciculer-attachement/Electricity%20(Promoting%20Renewable%20Energy%20through%20Green%20Energy%20Open%20Access)%20Rules,2022.pdf)
- [Ministry of Power, Green Energy Open Access Amendment Rules 2023, G.S.R. 59(E), 27 January 2023](https://www.recregistryindia.nic.in/pdf/REC_Regulation/First_Amendment_Green_Energy_Open_Access_Rules_2023.pdf)

Guide: [Green energy open access for data centres in India](https://invariant-ai.com/blog/green-energy-open-access-data-centres-india)

Related: [Open access (electricity, India)](https://invariant-ai.com/glossary/open-access-india), [Cross subsidy surcharge (CSS)](https://invariant-ai.com/glossary/cross-subsidy-surcharge), [Additional surcharge (open access)](https://invariant-ai.com/glossary/additional-surcharge), [Group captive power (26% ownership, 51% consumption)](https://invariant-ai.com/glossary/group-captive)