# Power longstop date

> A power longstop date is the date in a data center lease or capacity contract by which firm power must be delivered. If it is missed, the tenant can terminate or receive a set remedy.

URL: https://invariant-ai.com/glossary/power-longstop-date  
Updated: 2026-11-20 · Publisher: Invariant

Also called: firm capacity longstop date, longstop date, power delivery longstop

AI tenants added longstop clauses because compute deals keep failing on power dates. One data center lease filed with the SEC lets the tenant terminate if firm capacity is not delivered by a Firm Capacity Longstop Date, and gives the tenant written approval over the power plan.

A longstop clause gives a remedy, not power. Tenants and lenders check the document behind the provider's MW, the connection and its dependencies before relying on the date.

## Sources

- [Data center lease exhibit with a firm capacity longstop date (SEC)](https://www.sec.gov/Archives/edgar/data/0002097508/000118518526004213/bldcex10-51i.htm)

Guide: [Power longstop dates in GPU leases](https://invariant-ai.com/blog/gpu-lease-power-longstop-diligence)

Related: [Neocloud](https://invariant-ai.com/glossary/neocloud), [GPU colocation](https://invariant-ai.com/glossary/gpu-colocation), [Will-serve letter](https://invariant-ai.com/glossary/will-serve-letter), [Load study](https://invariant-ai.com/glossary/load-study), [Utility-grade power study](https://invariant-ai.com/glossary/utility-grade-power-study)