# Power, utilities & renewables research datasets

44 published research examples from Invariant. Check each sample’s coverage and record dates before applying it to another site or decision.

[Browse this topic on the website](https://invariant-ai.com/datasets?topic=Power%2C+utilities+%26+renewables#dataset-search) · [Full catalog and source records](https://invariant-ai.com/datasets.md)

Start with [Replay a 25-hour day of ERCOT prices](<https://invariant-ai.com/blog/ercot-day-ahead-real-time-price-data#dataset>).

## ERCOT dispatch and settlement price replay for November 25, 2026

A matched 15-minute ERCOT settlement file and selected dispatch and adder records, with source archive checksums, point classifications, seconds weights, and a West Hub and West Load Zone comparison, and three same-interval Dryos query observations.

- Coverage: ERCOT, Texas, United States
- Record dates: 2026-11-25
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/ercot-lmp-vs-settlement-point-price#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/ercot-lmp-vs-settlement-point-price.dataset.csl.json>)
- [Download the selected ERCOT rows, source ZIP links and calculation (JSON)](<https://invariant-ai.com/blog/ercot-lmp-settlement-price-replay.json>)

## Plaza 500 and Edsall power and permitting records

Ten source-linked records for a proposed Fairfax County data center. Includes requested demand, a utility assessment, a conceptual project cost, the state certificate and dates, a county hearing and two published utility schedules.

- Coverage: 6295 Edsall Road, Fairfax County, Virginia, United States
- Record dates: 2025-02-14/2026-11-25
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-site-selection-platforms-and-advisors#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-site-selection-platforms-and-advisors.dataset.csl.json>)
- [Download the Plaza 500 and Edsall evidence records (CSV)](<https://invariant-ai.com/blog/plaza-500-edsall-power-and-permitting-records.csv>)

## Minnesota electric utility territory lookup at three addresses

Three county address points intersected with the official Minnesota layer and NTIA’s national HIFLD copy. Includes utility IDs, every match, exact public queries and response hashes.

- Coverage: Chaska and Chanhassen, Carver County, Minnesota, United States
- Record dates: 2026-11-25
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/electric-utility-lookup-by-address#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/electric-utility-lookup-by-address.dataset.csl.json>)
- [Download the three address lookups and source queries (JSON)](<https://invariant-ai.com/blog/electric-utility-lookup-by-address.json>)

## Dated Kern County solar and storage interconnection queue reconciliation

58 year-end 2025 Berkeley Lab queue requests matched to California ISO’s separate historical-cluster and Cluster 15 reports, with workbook row locators, status dates and a Cluster 16 net-export example.

- Coverage: Kern County, California, United States
- Record dates: 2025-12-31/2026-11-23
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/interconnection-queue-data#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/interconnection-queue-data.dataset.csl.json>)
- [Download the 58-request reconciliation with workbook row numbers (JSON)](<https://invariant-ai.com/blog/kern-county-solar-storage-queue-status.json>)

## Oregon irrigation water-right references from two siting filings

Six off-site Muddy Creek irrigation certificate references and four Deschutes parcel-to-certificate entries. Keeps the filing’s acreage basis and includes blank fields for a buyer’s parcel, use, transfer and delivery checks.

- Coverage: Linn County and the Deschutes Solar project analysis area, Oregon, United States
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/oregon-water-rights-by-parcel#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/oregon-water-rights-by-parcel.dataset.csl.json>)
- [Download the Oregon filing records and water-right review worksheet (JSON)](<https://invariant-ai.com/blog/oregon-water-rights-by-parcel.json>)

## USGS water withdrawal overlap test and Loudoun Water allocation source records

Monthly 2020 USGS data for 35 unique HUC12 watersheds overlapping Loudoun or Fairfax, exact queries, and source records for withdrawal conditions, treatment planning, and service estimation.

- Coverage: Loudoun and Fairfax counties, Virginia, and overlapping watersheds
- Record dates: 2020-01-01/2026-11-23
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/water-withdrawal-data-api-site-allocation.dataset.csl.json>)
- [Download the 420 monthly rows for the 35 unique watersheds (CSV)](<https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation.csv>)
- [Download exact API queries, source dates and the Loudoun Water records (JSON)](<https://invariant-ai.com/blog/water-withdrawal-data-api-site-allocation.json>)

## Dated pipeline capacity and gas service records for industrial sites

Two operational capacity snapshots for one MRT delivery point, plus the Decatur Lateral certificate, named precedent volumes, and the scope of each number.

- Coverage: Ashley County, Arkansas, and Macon County, Illinois, United States
- Record dates: 2026-03-19/2026-11-22
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/natural-gas-pipeline-capacity-site-service#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/natural-gas-pipeline-capacity-site-service.dataset.csl.json>)
- [Download the MRT capacity rows and Decatur Lateral source records (JSON)](<https://invariant-ai.com/blog/natural-gas-pipeline-capacity-site-service.json>)
- [Download fuel scenarios for 25, 50, 100 and 250 MW (CSV)](<https://invariant-ai.com/blog/natural-gas-pipeline-capacity-site-service.csv>)

## Helene electricity outages and I-40 closures by reporting scope

Fifteen North Carolina DOE outage snapshots, the EAGLE-I 15-minute Haywood County window with gaps, and the separate I-40 closure and reopening history.

- Coverage: North Carolina, Haywood County, and the I-40 North Carolina–Tennessee Pigeon River Gorge segment, United States
- Record dates: 2024-09-25/2025-06-27
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/power-outage-road-closure-history#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/power-outage-road-closure-history.dataset.csl.json>)
- [Download the county time series, 15 state snapshots, and I-40 closure milestones (JSON)](<https://invariant-ai.com/blog/power-outage-road-closure-history.json>)

## ERCOT Houston and West hub prices for the 25-hour November 2, 2025 operating day

Fifty matched day-ahead and real-time hourly intervals across two ERCOT trading hubs. Includes 200 quarter-hour prices, repeated-hour flags, UTC boundaries, price summaries, and source archive fingerprints.

- Coverage: ERCOT Houston and West trading hubs, Texas, United States
- Record dates: 2025-11-02
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/ercot-day-ahead-real-time-price-data#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/ercot-day-ahead-real-time-price-data.dataset.csl.json>)
- [Download 50 aligned hourly records, 200 interval prices, and workbook fingerprints (JSON)](<https://invariant-ai.com/blog/ercot-day-ahead-real-time-price-data.json>)

## Truck depot charging load profiles

Two simulated 24-hour demand profiles at 15-minute resolution for a 99-truck depot, with pinned input files, charging assumptions, and the result of a three-hour charging limit.

- Published: 2026-11-22
- [Dataset notes and sources](<https://invariant-ai.com/blog/truck-depot-charging-site-selection#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/truck-depot-charging-site-selection.dataset.csl.json>)
- [Download the 96 demand intervals, assumptions, and source files (JSON)](<https://invariant-ai.com/blog/truck-depot-charging-site-selection.json>)

## Nottingham solar interconnection study comparison

Four public PJM study records for two linked solar requests at Nottingham 138 kV in Harrison County, Ohio. The comparison includes dated MW fields, project-level cost estimates, changes between study phases, and source URLs and fingerprints.

- Coverage: Nottingham 138 kV, Harrison County, Ohio, United States
- Record dates: 2025-10-29/2026-06-03
- Published: 2026-11-22
- [Dataset notes and sources](<https://invariant-ai.com/blog/solar-farm-site-selection-gis#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/solar-farm-site-selection-gis.dataset.csl.json>)
- [Download the four dated PJM study records (JSON)](<https://invariant-ai.com/blog/solar-farm-site-selection-gis.json>)

## Virginia solar decommissioning estimates and bond conditions

Two Virginia solar projects, with dated engineering estimates, salvage and contingency assumptions, local approval status, PDF pages, and posted-security evidence.

- Coverage: Campbell County and Orange County, Virginia, United States
- Record dates: 2025-03-21/2026-11-26
- Published: 2026-11-26
- [Dataset notes and sources](<https://invariant-ai.com/blog/solar-farm-site-selection-gis#dataset-virginia-solar-decommissioning-records>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/solar-farm-site-selection-gis.dataset-virginia-solar-decommissioning-records.csl.json>)
- [Download the Virginia solar decommissioning records (JSON)](<https://invariant-ai.com/blog/virginia-solar-decommissioning-records.json>)

## Battery import and export evidence from three connection studies

Three dated public study records from PJM and the IESO, with reported battery output, import evidence, study conditions, and source fingerprints. Includes a separate illustrative recharge calculation for a four-hour battery.

- Coverage: Pittsylvania County, Virginia; Fleetwood, Pennsylvania; Haldimand County, Ontario
- Record dates: 2011-06/2026-06-03
- Published: 2026-11-22
- [Dataset notes and sources](<https://invariant-ai.com/blog/battery-storage-site-interconnection#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/battery-storage-site-interconnection.dataset.csl.json>)
- [Download the site study records and recharge calculation (JSON)](<https://invariant-ai.com/blog/battery-storage-site-interconnection.json>)

## Quantum Frederick Lot 106 water and sewer evidence

A documented Maryland site with county water and sewer classifications, an EPA boundary no-match and control, and dated potable-water allocations and wastewater plant planning figures.

- Coverage: Adamstown and Frederick, Frederick County, Maryland
- Record dates: 2024-08-14/2026-11-23
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/water-sewer-data-apis-site-selection#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/water-sewer-data-apis-site-selection.dataset.csl.json>)
- [Download the parcel match, utility queries and capacity records (JSON)](<https://invariant-ai.com/blog/water-sewer-data-apis-site-selection.json>)

## National Grid feeder load and solar hosting capacity records

Three reproducible National Grid records for Vail Mills feeder 36_35_39253, with the source query, utility refresh date, power direction, and unit for each value.

- Coverage: Vail Mills, New York, United States
- Record dates: 2026-03-25/2026-03-31
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/grid-capacity-apis-load-headroom#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/grid-capacity-apis-load-headroom.dataset.csl.json>)
- [Download the three records and repeat the source queries (JSON)](<https://invariant-ai.com/blog/national-grid-feeder-capacity-evidence.json>)

## Aiken data center transmission and energization evidence

A document-backed comparison of planned demand, approved transmission scope, and a reported energization date for South Carolina PSC docket 2024-61-E. Includes the three public filings, page references, document fingerprints, and the milestones those records establish.

- Coverage: Aiken County, South Carolina, United States
- Record dates: 2023-09/2026-04-02
- Published: 2026-11-22
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-power-screening-tools#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-power-screening-tools.dataset.csl.json>)
- [Download the Aiken milestones and links to the source filings (JSON)](<https://invariant-ai.com/blog/data-center-power-screening-tools.json>)

## PJM b4068 upgrade dates and AEP Ohio data center service assumptions

A review of 49 PJM b4068 upgrade rows with required and projected dates, PDF page references, two earlier required dates, and AEP Ohio’s published load and service assumptions.

- Coverage: Central Ohio and eastern Indiana, United States
- Record dates: 2025-11-07/2026-03-18
- Published: 2026-11-26
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-power-screening-tools#dataset-pjm-upgrade-dates>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-power-screening-tools.dataset-pjm-upgrade-dates.csl.json>)
- [Download the 49 PJM upgrade rows and AEP Ohio study evidence (JSON)](<https://invariant-ai.com/blog/pjm-b4068-transmission-upgrade-dates.json>)

## Camp Hall industrial sewer and Lower Berkeley treatment capacity records

Seven dated Camp Hall and Lower Berkeley records that distinguish sewer line and pump capacity, planned improvements, treatment capacity and procurement. Includes primary sources and specific questions for a proposed industrial connection.

- Coverage: Camp Hall Commerce Park and Lower Berkeley Wastewater Treatment Plant, Berkeley County, South Carolina, United States
- Record dates: 2021/2025-06-17
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/industrial-wastewater-capacity-site-selection#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/industrial-wastewater-capacity-site-selection.dataset.csl.json>)
- [Download the Camp Hall sewer and treatment records (CSV)](<https://invariant-ai.com/blog/camp-hall-industrial-wastewater-capacity.csv>)

## New York metro building addresses and AWS Direct Connect location labels

Three public operator address records cross-referenced with two AWS Direct Connect location listings. Includes the source URLs, the distinction between a building and a listed access location, and a separate nominal failover calculation.

- Coverage: Secaucus, New Jersey, and New York City, United States
- Record dates: 2026-11-22
- Published: 2026-11-22
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-fiber-route-diversity#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-fiber-route-diversity.dataset.csl.json>)
- [Download the facility cross-reference and failover calculation (JSON)](<https://invariant-ai.com/blog/data-center-fiber-route-diversity.json>)

## Cloud interconnect directory checks for AWS, Google Cloud and Azure

Three dated provider directory checks from Secaucus, Dallas and the New York metro. Compares physical facility names, AWS location labels, Google edge availability domains and Azure Metro peering sites. Includes a buyer’s evidence request for validating customer circuits.

- Coverage: Dallas, Texas, and the New York–New Jersey metropolitan area, United States
- Record dates: 2026-11-22/2026-11-25
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-fiber-route-diversity#dataset-cloud-interconnect-diversity>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-fiber-route-diversity.dataset-cloud-interconnect-diversity.csl.json>)
- [Download the AWS, Azure and Google Cloud directory checks (JSON)](<https://invariant-ai.com/blog/cloud-interconnect-diversity-reference.json>)

## Southern California Edison system outage reliability, 2016 to 2025

Twenty SCE system year and scope records for planned and unplanned outages, with SAIDI, SAIFI, MAIFI and CAIDI including and excluding major event days. Includes the original table references, source PDF checksum, planned reporting footnotes and the 2025 difference calculation.

- Coverage: Southern California Edison service system, California, United States
- Record dates: 2016/2025
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/power-outage-history-by-address#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/power-outage-history-by-address.dataset.csl.json>)
- [Download 20 SCE year and scope records with source tables and the 2025 calculation (JSON)](<https://invariant-ai.com/blog/sce-electric-outage-history-2016-2025.json>)

## Utility load study fees and a 100 MW security example

Nine source-linked records from AEP Ohio, Duquesne Light, the adopted Texas large-load rule and Dominion’s engineering process. Separates study fees, engineering payments, intermediate financial security and post-ramp billing demand.

- Coverage: Ohio Power, Duquesne Light, ERCOT and Dominion Energy Virginia service areas
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/utility-load-study-cost-and-timeline#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/utility-load-study-cost-and-timeline.dataset.csl.json>)
- [Download the study fee and security evidence (CSV)](<https://invariant-ai.com/blog/utility-load-study-cost-evidence.csv>)

## PJM Fast Energization proposed timeline and buyer checks

Six dated entries from the November 16, 2026 transmittal letter, with printed and PDF pages. Separates requested tariff dates, projected study milestones and the proposed transition cutoff. Includes an illustrative 100 MW service-date check.

- Coverage: PJM Interconnection region, United States
- Record dates: 2026-11-16
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/utility-load-study-cost-and-timeline#dataset-pjm-fast-energization-timeline>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/utility-load-study-cost-and-timeline.dataset-pjm-fast-energization-timeline.csl.json>)
- [Download the filing milestones and 100 MW buyer checklist (JSON)](<https://invariant-ai.com/blog/pjm-fast-energization-er27-531-timeline.json>)

## Data center power delivery records for CLT1, Project Rocket and South Bend

Five records that distinguish the start of utility service, two targeted IT hall handovers, a broker’s scheduled power date and temporary generation mobilization. Source locators and dates preserve what each MW figure measures.

- Coverage: South Carolina, Houston, Texas, and South Bend, Indiana, United States
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/50-mw-data-center-site#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/50-mw-data-center-site.dataset.csl.json>)
- [Download the dated power delivery records (CSV)](<https://invariant-ai.com/blog/50-mw-data-center-delivery-records.csv>)

## Power milestones at four U.S. gigawatt data center developments

Seven dated developer and utility records covering energized buildings, planned grid capacity, onsite generation design, critical IT load, and regulatory approval at projects in Texas and Louisiana.

- Coverage: Texas and Louisiana, United States
- Record dates: 2025-08-20/2026-07-15
- Published: 2026-11-09
- [Dataset notes and sources](<https://invariant-ai.com/blog/1-gw-data-center-site#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/1-gw-data-center-site.dataset.csl.json>)
- [Download seven dated gigawatt project records (JSON)](<https://invariant-ai.com/blog/gigawatt-data-center-power-milestones.json>)

## Richland Parish compute, generation and interconnection milestones

Four power records and four dated milestones for the Richland Parish data center projects, separating Meta’s compute target, Entergy’s proposed generator ratings and the projected utility construction schedule.

- Coverage: Richland and Pointe Coupee parishes, Louisiana, United States
- Record dates: 2025-08-29/2026-11-24
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/1-gw-data-center-site#dataset-evest-power-milestones>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/1-gw-data-center-site.dataset-evest-power-milestones.csl.json>)
- [Download the Richland Parish power records and four milestone dates (JSON)](<https://invariant-ai.com/blog/evest-richland-parish-power-milestones.json>)

## NIPSCO and Amazon data center capacity commitments and approvals

Dated contract and regulatory records covering the original 2,400 MW ramp, the 400 MW addition, the replacement energization schedule and the federal affiliate sales approval.

- Coverage: NIPSCO service territory, northern Indiana, United States
- Record dates: 2025-09-18/2026-11-19
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/1-gw-data-center-site#dataset-nipsco-amazon-power-contract>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/1-gw-data-center-site.dataset-nipsco-amazon-power-contract.csl.json>)
- [Download the NIPSCO and Amazon power contract records (JSON)](<https://invariant-ai.com/blog/nipsco-amazon-data-center-capacity-amendments.json>)

## Virginia data center offerings, parcel checks and address records

Three marketed properties, two leads reported under contract, four Virginia air registrations, one rezoning ordinance and four operator, government and utility records. Includes campus power ratings, dated building records and the evidence still needed for a customer allocation.

- Coverage: Dinwiddie, Loudoun, Prince Edward, Prince William and Spotsylvania counties, and the cities of Lynchburg and Manassas, Virginia, United States
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-sites-for-sale-virginia#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-sites-for-sale-virginia.dataset.csl.json>)
- [Download Virginia site, power and permit evidence (CSV)](<https://invariant-ai.com/blog/virginia-data-center-site-evidence.csv>)

## Dominion data center service milestones and large-load filings

Five dated evidence rows that distinguish engineering, construction, and electric service templates from Virginia’s large-load queue proceeding and PJM’s registry filing. Includes pinpoint citations and buyer checks.

- Coverage: Dominion Energy Virginia service territory and PJM region, United States
- Record dates: 2026-05-06/2026-11-09
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-sites-for-sale-virginia#dataset-dominion-service-milestones>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-sites-for-sale-virginia.dataset-dominion-service-milestones.csl.json>)
- [Download the five utility document records and buyer checks (CSV)](<https://invariant-ai.com/blog/virginia-dominion-data-center-service-milestones.csv>)

## Sterling IAD1 parcel, lease and air-registration crosswalk

Matches three Sterling campus addresses to the 2021 Loudoun tax roll and a 2023 court exhibit. Includes two dated Virginia air registry rows, Csquare campus-level power ratings, and the site-specific items that remain unverified.

- Coverage: Loudoun County and Fairfax County, Virginia, United States
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-sites-for-sale-virginia#dataset-sterling-iad1-address-records>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-sites-for-sale-virginia.dataset-sterling-iad1-address-records.csl.json>)
- [Download the address, parcel, lease and air-registration crosswalk (JSON)](<https://invariant-ai.com/blog/sterling-iad1-nokes-parcel-air-lease-records.json>)

## 9905 Godwin Drive electric-service, occupancy and air-registry records

City council records identify the customer and utility roles for the Brickyard project and explain the $2 million electric-fund appropriation. The sample links those records to a May 2024 occupancy milestone, Virginia air registration 74262 and the scope of Digital Realty’s June 2026 joint venture acquisition.

- Coverage: 9905 Godwin Drive, Manassas, Virginia, United States
- Record dates: 2023-11-20/2026-11-25
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/data-center-sites-for-sale-virginia#dataset-manassas-godwin-electric-service>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/data-center-sites-for-sale-virginia.dataset-manassas-godwin-electric-service.csl.json>)
- [Download the Godwin Drive electric-service and property records (JSON)](<https://invariant-ai.com/blog/manassas-godwin-drive-electric-service-records.json>)

## Ohio siting, air permit and local approval records for Fairfield and Ashville

Dated events for two Ohio behind-the-meter generating plants, with agency case and permit IDs, scope, reported MW, status, and the next record a reviewer should obtain.

- Coverage: Fairfield and Pickaway counties, Ohio, United States
- Record dates: 2026-08-07/2026-11-20
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/ohio-data-center-power-plant-air-permits#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/ohio-data-center-power-plant-air-permits.dataset.csl.json>)
- [Download the dated Ohio power plant approval records (CSV)](<https://invariant-ai.com/blog/ohio-data-center-power-plant-approval-records.csv>)

## Dominion GS-5 and Ohio DCT billed demand for two 100 MW peak histories

Two illustrative 12-month meter histories, source-pinned tariff pages, December billing demand under Virginia and Ohio rules and two Dominion on-peak generation charges.

- Coverage: Dominion Energy Virginia and Ohio Power Company service territories, United States
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/dominion-virginia-gs5-data-center-tariff#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/dominion-virginia-gs5-data-center-tariff.dataset.csl.json>)
- [Download both demand histories, tariff inputs and calculations (JSON)](<https://invariant-ai.com/blog/dominion-virginia-gs5-data-center-tariff.json>)

## Ohio Power data center demand floors and a 100 MW billing example

Reproducible Schedule DCT inputs, six contract-tier examples, four ramp-year floors and thirteen illustrative monthly billed demands with primary base charges. Includes exact sheet locations and the tariff PDF checksum.

- Coverage: Ohio Power Company service territory, Ohio, United States
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/aep-ohio-data-center-tariff-minimum-demand#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/aep-ohio-data-center-tariff-minimum-demand.dataset.csl.json>)
- [Download the tariff inputs and 13-month calculation (JSON)](<https://invariant-ai.com/blog/aep-ohio-data-center-tariff-minimum-demand.json>)

## SPP CHILLS tariff milestones and a 100 MW curtailment worksheet

Three source-backed tariff milestones and five illustrative facility-load cases. The worksheet separates firm grid imports, conditional grid imports, on-site output and interruptible facility load.

- Coverage: Southwest Power Pool, United States
- Record dates: 2026-06-05/2026-10-26
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/spp-chills-data-center-power#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/spp-chills-data-center-power.dataset.csl.json>)
- [Download the tariff timeline and curtailment worksheet (JSON)](<https://invariant-ai.com/blog/spp-chills-data-center-power-worksheet.json>)

## CLT1 utility service, billing and customer delivery milestones

Five dated records showing the utility agreement, customer colocation contract, utility service commencement, demand charge and first data hall delivery target at AIB’s CLT1 development. Includes filing citations and diligence questions.

- Record dates: 2026-05-27/2026-11-16
- Published: 2026-11-09
- [Dataset notes and sources](<https://invariant-ai.com/blog/utility-will-serve-letter-load-study-esa#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/utility-will-serve-letter-load-study-esa.dataset.csl.json>)
- [Download the CLT1 contract and delivery milestones (CSV)](<https://invariant-ai.com/blog/data-center-utility-agreement-clt1-milestones.csv>)

## Odessa data center power agreement evidence

Six dated records for the Texas Critical Data Center project in Odessa, Texas. The table distinguishes contracted Phase 1 power, prerequisites to delivery, a termination deadline, a delivery forecast, ramp-up payment terms and the Phase 2 proposal. Each row links to the originating company disclosure.

- Published: 2026-11-09
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset.csl.json>)
- [Download the Odessa agreement records (CSV)](<https://invariant-ai.com/blog/odessa-data-center-power-agreement-records.csv>)

## Data center on-site power delivery evidence for Aggreko, Bloom and McCloud

Three source-backed cases separate mobilization, operating duration, disclosed generator capacity and the planned continuous load. Includes the November 24 McCloud agenda notice and the gaps that matter when comparing a 50 MW bid.

- Coverage: South Bend, Indiana, El Paso, Texas, and an undisclosed Oracle site
- Record dates: 2025/2026-11-24
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-onsite-delivery>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-onsite-delivery.csl.json>)
- [Download the commissioning and bridge power evidence (JSON)](<https://invariant-ai.com/blog/data-center-onsite-power-delivery-evidence.json>)

## Hilliard fuel cell and Martin Drake gas turbine project timelines

Eight source-linked observations compare the proposed Hilliard fuel cell schedule with the Martin Drake utility project’s observed installation, test generation and commissioning. Forecast dates and dated observations are labeled separately.

- Coverage: Hilliard, Ohio, and Colorado Springs, Colorado, United States
- Record dates: 2021-09/2027-09
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-bridge-power>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-bridge-power.csl.json>)
- [Download the Hilliard and Martin Drake project timeline (CSV)](<https://invariant-ai.com/blog/bridge-power-project-timelines.csv>)

## Prime AUS02 air registration and generation records

Five source-linked records from the August application to the November 20 Texas air registration. Separates the 516 MW fleet rating, 350 MW proposed operating maximum, nitrogen oxides limits and separate operating permit.

- Coverage: Martindale, Caldwell County, Texas, United States
- Record dates: 2026-08-06/2026-11-20
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-aus02-air-registration>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-aus02-air-registration.csl.json>)
- [Download the Prime AUS02 application, capacity and permit records (CSV)](<https://invariant-ai.com/blog/prime-aus02-air-permit-records.csv>)

## Longhorn Data Center turbine air permit revision history

Three source-linked air permit records for Longhorn in Abilene. Includes original and amended turbine counts, unit ratings and operating hours for registration 177263, plus the separate proposal for buildings 9 and 10 under application 182126. The project MW published by TCEQ and the sum of reviewed unit ratings are stored separately.

- Coverage: Longhorn Data Center, Abilene, Taylor County, Texas, United States
- Record dates: 2024-08-15/2026-11-24
- Published: 2026-11-24
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-longhorn-turbine-permits>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-longhorn-turbine-permits.csl.json>)
- [Download the Longhorn permit history and equipment ratings (JSON)](<https://invariant-ai.com/blog/longhorn-data-center-air-permit-history.json>)

## Homer City air-permit timeline

Six dated Pennsylvania agency records for the Homer City gas generation plan, from application receipt through plan approval and Title V renewal. Includes the scheduled appeal hearing, with permit and docket IDs.

- Coverage: Homer City Generating Station, Indiana County, Pennsylvania, United States
- Record dates: 2025-04-04/2026-12-08
- Published: 2026-11-23
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-homer-city>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-homer-city.csl.json>)
- [Download the Homer City air-permit timeline (CSV)](<https://invariant-ai.com/blog/homer-city-air-permit-timeline.csv>)

## Project Dorothy wind, grid and critical IT capacity records

Dated Project Dorothy records distinguish the existing 98 MW of reported operating capacity, 100 MW of conditionally classified interconnection capacity, a separate 50 MW grid request and Dorothy 3A’s planned 50 MW critical IT and 75 MW gross phase.

- Coverage: Project Dorothy near Silverton, Briscoe County, Texas, United States
- Record dates: 2026-04-01/2026-11-16
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-dorothy-power-and-lease-milestones>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-dorothy-power-and-lease-milestones.csl.json>)
- [Download the Project Dorothy capacity and milestone records (JSON)](<https://invariant-ai.com/blog/project-dorothy-wind-grid-it-load-evidence.json>)

## Vantage VA2 gas turbine permit, operation dates and 2025 run hours

Virginia DEQ’s dates for air registration 74242, turbine construction and normal operations, plus turbine ratings and combined 2025 unit-hours. Includes the county site plan and preserves the distinction between equipment rating and net power delivered.

- Coverage: Vantage VA2, Sterling, Loudoun County, Virginia, United States
- Record dates: 2023-03-06/2026-04-27
- Published: 2026-11-25
- [Dataset notes and sources](<https://invariant-ai.com/blog/behind-the-meter-power-for-data-centers#dataset-vantage-va2-operating-turbines>) · [Citation (CSL JSON)](<https://invariant-ai.com/citations/behind-the-meter-power-for-data-centers.dataset-vantage-va2-operating-turbines.csl.json>)
- [Download the Vantage VA2 timeline, turbine ratings and run hours (JSON)](<https://invariant-ai.com/blog/vantage-va2-turbine-operation.json>)
