Houston mining site for sale: 3 MW energized on ERCOT with fixed power to 2030

An energized 3 MW ERCOT site in the Houston metro with a fixed power contract through 2030 and a warehouse on site. Details on a call.

We have an energized 3 MW site in the Houston metro on ERCOT, with a fixed energy contract through 2030, the utility transformer installed and inspection passed, and a warehouse on site about 20 minutes from downtown.

Before you start

  • Power: 3 MW live on ERCOT.
  • Contract: Fixed energy price through 2030.
  • Timing: Energized and inspected.
  • Use: Bitcoin mining, small compute.
  • Location, utility documents and price are shared on a call.

What we can share publicly

ItemSummary
Power3 MW live on ERCOT
ContractFixed energy price through 2030
TimingEnergized and inspected
UseBitcoin mining, small compute
BuildingWarehouse on site
Price and termsShared on a call
ERCOTU.S. Energy Information Administration

Why this site is worth a call

ERCOT prices swing hard in summer. A fixed energy price through 2030 takes most of that risk away, and peak-period curtailment lowers the transmission part of the bill.ERCOT

Who this site fits

Miners who want a metro site that is easy to staff and service.

What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

  • Exact location, parcel and site plan
  • Utility, substation and interconnection documents
  • Power price and contract terms
  • Asking price and deal structure
  • Seller data room and diligence reports

If this one is not right, we bring others that are. Most of what we place is never posted.

Questions that come up.

What grid is the Houston site on?

ERCOT, inside the Houston metro.ERCOT

How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

Sources and references.

Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. ERCOTElectric Reliability Council of Texas ↗
  2. U.S. Energy Information AdministrationEIA Texas electricity profile ↗