Invariant has 35 US powered sites and 11 hosting options available as of November 2026, from a 1.5 GW AI campus in Arizona to energized 2 MW mining sites and open hosting capacity. Fifteen are in the 17 MW to 1.5 GW range that AI, HPC and hyperscale buyers ask for, and most can take load today. Below is what we can share publicly. Locations, utility documents and prices are shared on a call.
Before you start
- Large campuses: Arizona 1.5 GW, Pennsylvania 500 MW, Iowa 500 MW, Nevada 375 MW, Ohio 300 MW, Indianapolis 200 MW, Wisconsin 150 MW.
- Energized now: North Carolina 18 MW, Kentucky 30 MW, Texas 44 MW, Oklahoma City 55 MW.
- Small and fast: turnkey mining and edge sites in Kentucky, Oklahoma, Texas and Iowa.
- Tell us your MW, region and energize-by date. We share matching sites, including ones not listed here.
Sites available right now
| Region | Power | Land | Timing |
|---|---|---|---|
| Arizona | 1.5 GW Phase 1 | 15,000+ acres | Grid 2027 |
| Pennsylvania | 200 MW BTM gas + 300 MW grid | 120 ready acres | Phased |
| Iowa | 20 MW to 500 MW+ PPA site | Non-zoned | Phased |
| Nevada | 375 MW | ~350 acres | 2027 to 2028 |
| Ohio | 300 MW approved | 300+ acres | 1H 2027 |
| Kansas | Path to 250 MW BTM gas | Mineral acreage | Now |
| Indiana | 200 MW, load study done | ~80 acres | Substation planned |
| Wisconsin | 150 MW built, 80 MW now | 130 ready acres | Now |
| New York | 60 MW+ power plant | Plant site | Operating |
| Midwest | 85 MW brownfield | ~20 acres | Now |
| Oklahoma City | 55 MW contracted | ~80 acres | Now |
| Texas (Houston load zone) | 17 MW greenfield | ~2 acres | 4 to 6 months |
| Oregon | 10 MW hydro, to 100 MW+ | Lease + land option | Now |
| US (3 facilities) | Tier III data centers, 3.5 to 10 MW | Built | Now |
| Texas metro | 44 MW, +250 MW | ~50 acres, 1M sq ft | Now |
| Kentucky | 30 MW greenfield | ~16 acres, rezoned | Now |
| North Carolina | 18 MW live, path past 100 MW | ~200 acres | Now |
| North Dakota | 15 MW off-grid, managed containers, 180-acre JV site | Various | Now |
| Kentucky | Seven turnkey sites, 0.5 to 8 MW | Mostly owned | Now |
| Pennsylvania | 5 MW turnkey | Land available | Now |
| Oklahoma | Two 5 MW turnkey sites | Owned acres | Now |
| Iowa | 2 MW turnkey, to 7 MW | Owned acre | Now |
| Houston | 3 MW ERCOT | Leased | Now |
| Iowa | 2 MW+ edge site | Leased | Now |
| US | 11 hosting sites | Hosted | Now |
| US | 20 earlier listings, 0.25 to 30 MW | Various | Status on a call |
How Invariant works with buyers
We start from power evidence, not land. Before we introduce a buyer, we check the utility paperwork (studies, service agreements, will-serve letters), the zoning and the title, and we tell you which items we could not confirm.
We keep locations and prices off this page on purpose. Owners ask for discretion, and a site that is shopped everywhere loses value. Book a call and we will walk you through the sites that fit your load, timeline and budget.
Questions that come up.
Where can I find powered land for a data center in the US?
Invariant has powered sites in Arizona (1.5 GW), Nevada (375 MW), Ohio (300 MW), Indiana (200 MW), Wisconsin (150 MW), North Carolina (18 MW live) and more. Book a call or text (628) 220-8972 for details.
Which sites have power available today?
North Carolina, Kentucky (30 MW), a Texas metro property (44 MW), Oklahoma City (55 MW), Wisconsin (80 MW) and several turnkey mining sites.
Do you have off-market sites?
Yes. The sites on this page are a subset of what we work on. Tell us your requirements on a call.
How do you verify a powered site?
Utility documents first, then zoning and title, before any introduction. We flag anything we could not confirm.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
