We have seven turnkey bitcoin mining sites in Kentucky, from 0.5 MW to 8 MW, all energized and selling with infrastructure in place. Most include owned land or real estate (two come with warehouses and office space), two can grow past 20 MW at existing substations, and several qualify for Kentucky tax incentives.
Before you start
- Power: Seven sites from 0.5 MW to 8 MW, two expandable past 20 MW.
- Land: Owned land or buildings on most sites.
- Timing: All energized and operating.
- Use: Bitcoin mining, small HPC.
- Location, utility documents and price are shared on a call.
Every site on this page
| Site | Power | Setup | Listed |
|---|---|---|---|
| Kentucky site A (western KY) | 3.8 MW substation, 2 MW live | Owned land, entity sale, demand response income | October 2026 |
| Kentucky site B (western KY) | 5 MW grid-connected | Leased pad, containers and ASIC fleet included | October 2026 |
| Kentucky site C (eastern KY, PJM) | 5 MW, expandable to 20 MW | Owned land, containers | October 2026 |
| Kentucky site D | 2 MW | Building, transformers, plug-in ready | October 2026 |
| Kentucky site E (southeastern KY) | 8 MW, scalable to 22 MW | About 6 titled acres, no zoning | October 2025 |
| Kentucky site F | 1.75 MW | Warehouse and two-story office | September 2025 |
| Kentucky site G (central KY) | 0.5 MW, expandable to 1 MW+ | Industrial lot with warehouse and rental unit | September 2025 |
Why this site is worth a call
Kentucky combines low industrial power prices with miner-friendly tax treatment, and these sites already have the utility accounts, transformers and containers. One carries demand response income on top. Another sits in a county with no zoning or noise rules.U.S. Energy Information Administration
Who this site fits
Miners adding 2 to 8 MW quickly, and buyers who want a small site today with expansion headroom.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
What Kentucky mining sites are for sale?
Seven energized sites from 0.5 MW to 8 MW, most with owned land or buildings, two expandable past 20 MW.U.S. Energy Information Administration
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.