We have an 85 MW brownfield site in the Midwest with a PPA and a cheap long-term land lease already in hand. Power is delivered at distribution voltage, and the site suits air-cooled builds.
Before you start
- Power: 85 MW.
- Land: About 20 acres of brownfield, long-term lease.
- Contract: PPA and land lease in hand.
- Use: Air-cooled bitcoin mining.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Eighty-five MW with paper already signed is a lot of capacity for a small land footprint.
Who this site fits
Miners deploying air-cooled fleets at scale.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
How much power is at the Midwest brownfield?
85 MW, with a PPA and land lease in hand.
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
