North Dakota options for miners: double-digit MW of off-grid gas power deployable now, and fully managed containers on MISO at a fixed rate. Details on a call.

We have three North Dakota options: 15 MW of off-grid, gas-fired power ready to deploy now, fully managed 1 MW containers on the MISO grid where you own the hardware and hold a long-term fixed-rate operating right, and a 180-acre owned development site with grid power and a path to 50 MW, open to investors or a JV partner.

Before you start

  • Off-grid: 15 MW of gas-fired power, deployable now.
  • Managed: 1 MW containers on MISO, fixed long-term rate.
  • Development: 180 owned acres with grid power and a path to 50 MW, investor or JV.
  • Timing: Now.
  • Location, utility documents and price are shared on a call.

What we can share publicly

ItemSummary
Off-grid15 MW of gas-fired power, deployable now
Managed1 MW containers on MISO, fixed long-term rate
Development180 owned acres with grid power and a path to 50 MW, investor or JV
TimingNow
UseBitcoin mining
ModelOwn the hardware, operator runs the site
Price and termsShared on a call
U.S. Energy Information AdministrationMISO

Every site on this page

SitePowerSetupListed
Off-grid gas15 MWDeployable nowSeptember 2026
Managed container1 MW on MISOYou own container and ASICs, operator runs siteDecember 2025
Development site20 MW now, path to 50 MW180 owned acres, investor or JVSeptember 2024

Why this site is worth a call

Off-grid generation turns stranded gas into power and skips the interconnection queue entirely.U.S. Energy Information Administration

Who this site fits

Miners who want fast deployment without a grid queue.

What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

  • Exact location, parcel and site plan
  • Utility, substation and interconnection documents
  • Power price and contract terms
  • Asking price and deal structure
  • Seller data room and diligence reports

If this one is not right, we bring others that are. Most of what we place is never posted.

Questions that come up.

Is there off-grid power for mining in North Dakota?

Yes, 15 MW of off-grid gas power is deployable now.U.S. Energy Information Administration

How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

Sources and references.

Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. U.S. Energy Information AdministrationEIA North Dakota electricity profile ↗
  2. MISOMidcontinent Independent System Operator ↗