We have a powered brownfield in Oklahoma City with 55 MW contracted under executed utility service agreements. The roughly 80-acre site is zoned industrial, carries a prior city-approved data center permit and a full civil and electrical design set, and has a large transformer already on site.
Before you start
- Power: 55 MW under executed utility agreements.
- Land: About 80 acres, industrial zoning.
- Timing: Energized, feeder upgrade quoted.
- Use: Mining, hosting or phased AI and HPC.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Plenty of Oklahoma land sits near transmission. Far less of it has signed service agreements and a permit. Here the utility paperwork is done and the next feeder upgrade already has a quote and a schedule.SPP
Who this site fits
Miners wanting low-cost SPP power, and HPC developers who want a phased build on land that already carries a data center permit.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
How much power does the Oklahoma City site have?
55 MW under executed utility service agreements, on an industrial-zoned brownfield of about 80 acres.
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
- SPPSouthwest Power Pool ↗