We have a turnkey 5 MW mining site in Pennsylvania in the deregulated PJM market, with transformers and underground conduit installed, mining containers on site and a small parcel of land available to buy. Full diligence documents are ready.
Before you start
- Power: 5 MW, transformers installed.
- Market: Deregulated, PJM.
- Timing: Turnkey.
- Use: Bitcoin mining.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
A deregulated market lets a smart curtailment strategy push the average rate well below the headline price.PJM
Who this site fits
Miners who want a PJM site with diligence already packaged.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
Is the Pennsylvania site in PJM?
Yes, it is in the deregulated PJM market.PJM
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
