We have three move-in ready data centers: a Tier III facility with 4 MW built and a second phase to 10 MW with direct liquid cooling conversion underway, 3.5 to 4 MW of Tier III/IV floor space with generators and UPS in place, and a brand new Tier III building in Silicon Valley available to buy or lease.
Before you start
- Facilities: Three Tier III or Tier III/IV data centers.
- Power: 3.5 MW to 10 MW critical IT.
- Status: Built and operating, or ready for a tenant.
- Use: Enterprise, AI inference, colocation.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Building a Tier III hall takes two years. These are already built, carrier-connected and redundant, so a tenant can be live in months.
Who this site fits
Enterprises and AI inference operators who need certified capacity now.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
Do you have Tier III data centers for sale?
Yes, three, from 3.5 MW to 10 MW of critical IT load, for purchase or lease.
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
