Arizona powered land for sale: 1.5 GW AI campus with utility-studied grid power

A multi-GW Arizona AI campus with 1.5 GW of utility-studied Phase 1 capacity, onsite high-voltage switchyard, rail and interstate access. Available to buy or lease. Details on a call.

We have a 1.5 GW powered land campus in Arizona available to buy or lease. Phase 1 grid capacity has been studied by the serving utility, a high-voltage switchyard is already on the land, and onsite generation can energize in under a year while the grid build finishes. The land position runs past 15,000 acres.

Before you start

  • Power: 1.5 GW Phase 1, studied by the utility, several GW more in the queue.
  • Land: Over 15,000 acres, thousands already zoned for data centers.
  • Timing: Grid power 2027, onsite generation inside a year.
  • Use: Hyperscale and large AI training campuses.
  • Location, utility documents and price are shared on a call.

What we can share publicly

ItemSummary
Power1.5 GW Phase 1, studied by the utility, several GW more in the queue
LandOver 15,000 acres, thousands already zoned for data centers
TimingGrid power 2027, onsite generation inside a year
UseHyperscale and large AI training campuses
AccessInterstate and Class I rail
Price and termsShared on a call
U.S. Energy Information AdministrationInternal Revenue Service

Why this site is worth a call

Very few US sites can credibly say gigawatt. This one has a utility study behind Phase 1, an existing switchyard for the first block of load and a bridge-power plan, so a buyer is not betting the schedule on a single interconnection date. Incentive designations on the land also improve the after-tax math.U.S. Energy Information Administration

Who this site fits

Hyperscalers, neoclouds and developers that need hundreds of MW on one campus and want to phase toward multiple GW. Too large for a 20 MW colocation build.

What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

  • Exact location, parcel and site plan
  • Utility, substation and interconnection documents
  • Power price and contract terms
  • Asking price and deal structure
  • Seller data room and diligence reports

If this one is not right, we bring others that are. Most of what we place is never posted.

Questions that come up.

How much power is available at the Arizona campus?

1.5 GW in Phase 1, studied by the serving utility, with grid power targeted for 2027 and onsite generation available sooner.

How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

Sources and references.

Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. U.S. Energy Information AdministrationEIA Arizona electricity profile ↗
  2. Internal Revenue ServiceOpportunity Zones ↗
  3. Interagency Working Group on Coal and Power Plant CommunitiesEnergy Communities ↗