We have a 1.5 GW powered land campus in Arizona available to buy or lease. Phase 1 grid capacity has been studied by the serving utility, a high-voltage switchyard is already on the land, and onsite generation can energize in under a year while the grid build finishes. The land position runs past 15,000 acres.
Before you start
- Power: 1.5 GW Phase 1, studied by the utility, several GW more in the queue.
- Land: Over 15,000 acres, thousands already zoned for data centers.
- Timing: Grid power 2027, onsite generation inside a year.
- Use: Hyperscale and large AI training campuses.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Very few US sites can credibly say gigawatt. This one has a utility study behind Phase 1, an existing switchyard for the first block of load and a bridge-power plan, so a buyer is not betting the schedule on a single interconnection date. Incentive designations on the land also improve the after-tax math.U.S. Energy Information Administration
Who this site fits
Hyperscalers, neoclouds and developers that need hundreds of MW on one campus and want to phase toward multiple GW. Too large for a 20 MW colocation build.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
How much power is available at the Arizona campus?
1.5 GW in Phase 1, studied by the serving utility, with grid power targeted for 2027 and onsite generation available sooner.
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.