We have eleven hosting sites with open capacity across the US, from a few hundred slots in Washington State to 30 MW in Pennsylvania and 40 MW blocks in Texas and South Carolina. Air-cooled, hydro and immersion options are available, with minimums ranging from no minimum to 10 MW.
Before you start
- Sites: Eleven hosting sites with open capacity.
- Capacity: From a few hundred slots to 40 MW blocks.
- Regions: TX, OK, PA, Rocky Mountains, ID, IA, WA and SC.
- Minimums: From no minimum to 10 MW.
- Location, utility documents and price are shared on a call.
Every site on this page
| Site | Power | Setup | Listed |
|---|---|---|---|
| South Carolina co-location | 40 MW | 10 MW minimum | July 2026 |
| Texas hydro-cooled | 40 MW | 1 MW minimum | June 2026 |
| Pennsylvania | 30 MW | 5 MW minimum, direct to substation | September 2025 |
| Rocky Mountain region | 30 MW | Turnkey, 1 year minimum term | 2025 |
| Texas hydro | 20 MW | 2.4 MW container | November 2026 |
| Texas immersion | 20 MW | 1 MW minimum, profit share at 5 MW+ | January 2025 |
| Texas (ERCOT) | 17 MW | 50 units minimum | January 2026 |
| Oklahoma | 16.5 MW | 5 MW minimum | April 2026 |
| Idaho | 8 MW | 50 units minimum | November 2026 |
| Iowa co-op site | 6 MW, 600 slots | 50 units minimum | October 2026 |
| Washington State | 3.5 MW | No minimum | October 2026 |
Why this site is worth a call
All-in rates are not comparable until you see curtailment history and the uptime definition. We put them side by side for your fleet on the call.ERCOT
Who this site fits
Miners placing anything from 50 units to tens of MW.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Site-by-site all-in rates
- Curtailment history and uptime terms
- Minimums, deposits and contract terms
- Exact locations
- Operator references
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
Where can I host bitcoin miners right now?
Texas, Oklahoma, Pennsylvania, the Rocky Mountains, Idaho, Iowa, Washington and South Carolina all have open capacity.ERCOT
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
- ERCOTElectric Reliability Council of Texas ↗
- U.S. Energy Information AdministrationEIA South Carolina electricity profile ↗