Florida retired power plant site for redevelopment: about 1,200 acres with high-voltage transmission on site

A Florida retired power plant site of about 1,200 acres, offered for redevelopment, with high-voltage transmission on site, rail and port access. Details on a call.

We can take you through a retired power plant site in Florida of about 1,200 acres that its owner is offering for redevelopment. The plant generated more than a gigawatt and the high-voltage transmission that carried it is still on site. Rail runs onto the property and an interstate and a deepwater port are close by.

Before you start

  • Power: Former 1 GW+ generating site with high-voltage transmission on site; capacity for new load confirmed with the utility.
  • Land: About 1,200 acres, flat, part wetland.
  • Timing: Owner is taking redevelopment proposals; confirmed on a call.
  • Use: Large AI and industrial campuses.
  • Location, utility documents and price are shared on a call.

What we can share publicly

ItemSummary
PowerFormer 1 GW+ generating site with high-voltage transmission on site; capacity for new load confirmed with the utility
LandAbout 1,200 acres, flat, part wetland
TimingOwner is taking redevelopment proposals; confirmed on a call
UseLarge AI and industrial campuses
AccessRail on the property, interstate and port nearby
Price and termsShared on a call
U.S. Energy Information Administration

Why this site is worth a call

Retired plant sites are the fastest route to large power because the transmission is already built. The open question is how much of the former capacity a new load can take, since the owner plans to keep part of the site for new generation. We work that out with the utility before an introduction.U.S. Energy Information Administration

Who this site fits

Developers and hyperscalers who want a large Southeast campus on built transmission and can work through a public redevelopment process. Not suited to buyers who need power energized in months.

What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

  • Exact location, parcel and site plan
  • Utility, substation and interconnection documents
  • Power price and contract terms
  • Asking price and deal structure
  • Seller data room and diligence reports

If this one is not right, we bring others that are. Most of what we place is never posted.

Questions that come up.

How much power can a data center get at the Florida plant site?

The plant generated more than a gigawatt and its high-voltage transmission is still in place. How much of that a new load can use is confirmed with the utility before any introduction.U.S. Energy Information Administration

How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

Sources and references.

Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. U.S. Energy Information AdministrationEIA Florida electricity profile ↗