We have an energized AI campus in North Carolina with 18 MW live and billed today, additional capacity committed by the utility for 2028 and a path past 100 MW. It sits on roughly 200 acres in a Tier 1 county with an onsite substation, carrier fiber on the property and GPU racks already running.
Before you start
- Power: 18 MW live today, more committed for 2028.
- Land: About 200 acres core, more available.
- Timing: Energized now.
- Use: AI inference, neocloud, HPC conversion.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Most powered land pitches stop at a capacity number. This one has well over a year of reconciled utility bills behind it, so the operating cost is proven rather than modelled. Environmental diligence is already done, which removes months from a buyer's schedule.U.S. Energy Information Administration
Who this site fits
AI and neocloud operators who need 10 to 30 MW now and a credible route to 100 MW, plus miners converting to HPC.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and site plan
- Utility, substation and interconnection documents
- Power price and contract terms
- Asking price and deal structure
- Seller data room and diligence reports
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
How much power is live at the North Carolina campus?
18 MW is live and billed today, with further capacity committed by the utility for 2028.U.S. Energy Information Administration
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
- U.S. Energy Information AdministrationEIA North Carolina electricity profile ↗
