Evaluating physical-world data APIs
Run eight real tests against physical-world data APIs. Compare parcel identity, zoning, flood exposure, property changes, underwriting records, power dates and charging.
Eight exact test inputs with dated reference results, original source links and space to record your vendor’s response.

How to run a vendor trial
- Freeze the inputs and date
- Write down the decision, exact location or ID, geometry, requested fields and date. Give every provider the same inputs. Alongside known answers, include a record that moved, split or should come back unknown.
- Set acceptance criteria before the demo
- Use the worksheet’s dated reference result. Confirm the endpoint and what its fields measure. Record the returned entity, geometry, units, source and effective date. Keep an unavailable field separate from a failed request.
- Run it at production volume
- Repeat the test across your actual counties and workload. Measure response times, failed requests and cost per usable result. Check retention, redistribution and audit rights for the data you will store or show, then document the gap owner and release decision.
Eight tests with source records
- Match the right parcel and condo unit
At 432 Park Avenue, compare base lot 1012920033, billing lot 1012927502 and unit 1012921303. Ask which record supplies the geometry.
- Replay a parcel split with a retained ID
Compare BBL 3039470001 before and after the November 20, 2026 split. The retained lot kept its ID and lost roughly 21,169 square feet.
- Measure a split-zoned lot
The published point at 2239 Forest Avenue is in C8-1. The mapped tax lot intersects five base districts. Test both geometries.
- Compare a FEMA point with the tax lot
At Brooklyn Army Terminal, the published point is in Zone AE. The parcel overlay puts 19.9% of the lot in that zone.
- Reconcile property units with occupancy records
For 25 Water Street, compare 1,323 total units in MapPLUTO with 1,320 dwelling units on the initial occupancy issuance.
- Verify roof replacement as of a quote date
For Rosemead project 31031, compare what a June 30 quote could establish with what the July 8 council packet later documented.
- Reconcile utility service and upgrade dates
Compare the required and projected dates for PJM b4068.2 with the separate customer service estimate in AEP Ohio’s study.
- Test installed ports and live availability
AFDC stations 322368 and 388708 list 16 DC fast ports combined. Ask for the separate observation that establishes live status.