Texas greenfield mining site: 17 MW in the Houston load zone, energize in months

A 17 MW greenfield site in the ERCOT Houston load zone with a signed power agreement, a substation tap on the property and pre-development permits, energizing in 4 to 6 months. Details on a call.

We have a 17 MW greenfield site in the ERCOT Houston load zone with an executed power agreement, a power tap directly at the substation on the property and pre-development permits already done. It can energize in 4 to 6 months, and an optional full EPC build-out is available.

Before you start

  • Power: 17 MW grid, signed power agreement.
  • Land: About 2 acres, light industrial, no noise ordinance.
  • Timing: Energize in 4 to 6 months.
  • Use: Bitcoin mining, flexible load.
  • Location, utility documents and price are shared on a call.

What we can share publicly

ItemSummary
Power17 MW grid, signed power agreement
LandAbout 2 acres, light industrial, no noise ordinance
TimingEnergize in 4 to 6 months
UseBitcoin mining, flexible load
PermitsPre-development permits in place
Price and termsShared on a call
ERCOTU.S. Energy Information Administration

Why this site is worth a call

In ERCOT, the signed agreement and the substation tap are the slow parts. Both are done here, so the remaining work is construction, which a buyer can schedule.ERCOT

Who this site fits

Miners and flexible-load operators who want ERCOT exposure on a short build.

What you get on the call

We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:

  • Exact location, parcel and site plan
  • Utility, substation and interconnection documents
  • Power price and contract terms
  • Asking price and deal structure
  • Seller data room and diligence reports

If this one is not right, we bring others that are. Most of what we place is never posted.

Questions that come up.

When can the Texas 17 MW site energize?

In 4 to 6 months, with the power agreement signed and pre-development permits in place.ERCOT

How do I get the full details and price?

Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.

Is this site still available?

Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.

Sources and references.

Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. ERCOTElectric Reliability Council of Texas ↗
  2. U.S. Energy Information AdministrationEIA Texas electricity profile ↗