Property & infrastructure · Definition
Grid hosting capacity
Also known as: hosting capacity, distribution hosting capacity, solar hosting capacity
Grid hosting capacity estimates how much generation, storage, or load a grid asset can accommodate under a specified screening method and set of conditions.
Compare three capacity figures for one feederRead the utility’s definition and the direction of power flow for each map field. A solar map may estimate export to the grid before studied limits require changes. A load map can report remaining capacity to serve demand. For batteries, check charging and discharging separately. Save the equipment identifier, model or observation date, season, units and assumptions.
In the November 2026 Vail Mills comparison, the same National Grid feeder had 0.10 MW of published photovoltaic export hosting capacity and 3.18 MVA of published summer load headroom. MW measures real power. MVA measures apparent power. Comparing the figures requires the power direction and, for load, the applicable power factor.
Use map results to choose which connections to investigate. Ask the utility to evaluate the site’s actual demand or export, operating schedule, connection point, necessary upgrades, and timing before committing to service.
Related terms
Sources
Last updated 26 November 2026