Commercial Property Replacement Cost by Address

Look up commercial building replacement cost by address. Compare modeled values with city records, and see what a documented Florida rebuild tells an underwriter.

Comparison of four amounts for 32 Old Slip. The federal model totals $331.97 million full reconstruction and $276.05 million depreciated. The city reports $283.52 million in tax market value and $127.58 million actual assessed value.

32 Old Slip, Manhattan. Invariant summed seven 2026 National Structure Inventory records within one NYC footprint and matched the lot to its FY2027 final tax roll. The federal model uses August 2025 prices.

Start with the building you intend to insure, then check which kind of value the source returns. The U.S. Army Corps of Engineers publishes two modeled costs for structures in its 2026 National Structure Inventory. A city assessment measures the property for taxation. A carrier uses its accepted reconstruction valuation and policy terms to determine coverage. At 32 Old Slip in Manhattan, those public sources put four different figures beside the same street address.

Before you start

  • Use the 2026 National Structure Inventory for an initial comparison of full and depreciated reconstruction costs. Both estimates use approximately August 2025 prices.
  • Match the federal points to the intended building. At 32 Old Slip, seven occupancy records share one location and footprint ID. Keeping only the largest row would omit about $28.8 million from the published model’s full replacement total.
  • Check the estimator’s floor area, occupancy, construction and valuation date before relying on it. For underwriting, resolve discrepancies against the insured schedule, building records and the carrier’s accepted estimate.
  • Use an actual rebuild to check which costs the estimate covers. Verify insurance limits and valuation terms in the policy documents.

Which value are you looking for?

Value on the reportWhat it measuresWhere to start
Full modeled replacement costEstimated cost to reconstruct a comparable new structure. The NSI model excludes land.Use fullrep in the 2026 NSI for an initial comparison.U.S. Army Corps of EngineersU.S. Army Corps of Engineers
Depreciated modeled replacement costThe NSI structure estimate after its depreciation adjustment.Use val_struct for that model’s depreciated value.U.S. Army Corps of Engineers
Tax market value and actual assessmentThe local authority’s property valuation and the amount assigned under its assessment rules. In NYC, Class 4 market value is based on income potential and expenses.Use the final assessment roll and preserve the tax year and lot ID.NYC Department of FinanceNYC Department of Finance
Insurance replacement costAn estimate to replace covered property with property of comparable kind and quality. Coverage depends on the policy’s scope and limits.Confirm the building and scope with the insurer’s accepted estimator or valuation.California Department of Insurance

Start with the valuation date and what the number includes. A policy’s treatment of actual cash value follows its terms and applicable rules. Keep that policy measure separate from the depreciated figure in the federal model.U.S. Army Corps of EngineersCalifornia Department of Insurance

What the records show for 32 Old Slip

NYC Geosearch identifies the address as building 1000867 on tax lot 1000350001. The final tax roll calls the lot 77 Front Street. The city’s footprint query returns one polygon for the building ID. Both the city’s address point and the seven selected federal records fall inside it. Eight other federal records in the surrounding query fall outside the footprint.NYC Department of City PlanningNYC Office of Technology and InnovationNYC Department of FinanceU.S. Army Corps of Engineers

RecordReported or calculated amountWhat it covers
NSI full model, sum of fullrep$331.97 millionSeven occupancy rows at one matched footprint.U.S. Army Corps of EngineersU.S. Army Corps of Engineers
NSI depreciated model, sum of val_struct$276.05 millionThe same occupancy rows after modeled depreciation.U.S. Army Corps of EngineersU.S. Army Corps of Engineers
NYC FY2027 tax market value$283.52 millionFinal roll value for the entire tax lot.NYC Department of FinanceNYC Department of FinanceNYC Department of Finance
NYC FY2027 actual assessed value$127.58 millionActual assessment at 45% of the city’s tax market value.NYC Department of FinanceNYC Department of FinanceNYC Department of Finance

The largest NSI row, professional and technical services, accounts for $303.17 million of the full modeled total. Six other rows at the same point account for the remaining $28.81 million. The Corps uses shared footprint IDs for stacked occupancy records. Preserve the rows during review and use the footprint ID to count the modeled building once.U.S. Army Corps of EngineersU.S. Army Corps of EngineersU.S. Army Corps of Engineers

The seven inventory rows total 1,256,816 square feet. PLUTO 26v3 reports 973,587 square feet of building area on this one-building tax lot. That is a 29% difference relative to PLUTO. The public records do not establish which area definition applies to a given policy. Ask for the insured floor area, occupancy split and recent renovations before estimating reconstruction cost.U.S. Army Corps of EngineersU.S. Army Corps of EngineersU.S. Army Corps of EngineersNYC Department of City PlanningCalifornia Department of Insurance

32 Old Slip modeled replacement cost and NYC tax assessment

Download the seven matched records and FY2027 assessment JSON
Cite dataset

Invariant (2026). 32 Old Slip modeled replacement cost and NYC tax assessment [Data set]. https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#dataset

Download citation (CSL JSON)

Review the property underwriting workflow

Can a construction contract establish replacement cost for insurance?

A rebuild contract establishes the price for a defined scope at a given date. For insurance, use that scope to check the carrier’s reconstruction estimate. At 5171 Sanibel Captiva Road in Florida, the district rebuilt Fire Station 172 after Hurricane Ian. Its signed resolutions and audited financial statements give underwriters several different records to reconcile at one address.Contract and contingency authorizationSpending, estimate and occupancy milestonesFlood insurance authorization

RecordWhat the district reportedHow to use it
Contract authorization, March 13, 2024$7,439,017.49 for the construction contract, with up to $500,000 separately authorized for contingencies.Keep the authorization and contingency ceiling separate. Request the executed scope and change orders.Contract and contingency authorization
Construction spending at September 30, 2025$8,249,324 spent on construction. The audit separately estimated total construction costs at approximately $8.5 million.Record the spending cutoff and keep the estimate marked as provisional. Request a cost breakdown before comparing the amounts.Spending, estimate and occupancy milestones
Flood insurance authorization, December 10, 2025The board authorized the chief to obtain flood insurance. The resolution records a quoted annual premium of $11,500.Log the quote and authorization as separate records. Verify the issued policy, building limit, deductible and dates.Flood insurance authorization
Permanent certificate of occupancy, February 13, 2026The district reported substantial completion in November 2025 and receipt of the permanent certificate in February 2026.Use both milestones to date the building record and ask for the final closeout costs separately.Spending, estimate and occupancy milestones

To use this kind of evidence in a renewal, match the building on the statement of values to the project address and scope. Ask which costs belong to the insured building and which cover site work, contents, temporary operations or design. Then use the insurer’s accepted estimate and check the issued policy’s limits and treatment of debris removal and code upgrades. The records cited here leave final audited project cost and bound flood terms unconfirmed.Contract and contingency authorizationSpending, estimate and occupancy milestonesFlood insurance authorizationCalifornia Department of Insurance

Sanibel Fire Station 172 reconstruction cost and insurance authorization

Download the Sanibel contract, spending and flood authorization records JSON
Cite dataset

Invariant (2026). Sanibel Fire Station 172 reconstruction cost and insurance authorization [Data set]. https://invariant-ai.com/blog/commercial-property-replacement-cost-by-address#dataset-sanibel-reconstruction-cost

Download citation (CSL JSON)

Where to pull replacement cost and building evidence

SourceWhere it fitsWhat to test
Invariant EarthMatch the provided address to a building and parcel. Retrieve documented footprint and assessor fields with their sources.Test two buildings on one parcel and review the intended structure, date and source of each returned value.Invariant Earth
USACE National Structure InventoryPull public GeoJSON for a small area or use published geographic extracts for initial portfolio screening.Check for several rows per footprint and keep full and depreciated amounts in separate fields.U.S. Army Corps of EngineersU.S. Army Corps of EngineersU.S. Army Corps of Engineers
Verisk 360ValueUse its commercial reconstruction estimator when a carrier or underwriting workflow accepts it.Check which inputs come prefilled and which components, pricing date and local costs the output records.Verisk
Cotality commercial valuation dataUse square-foot, component or unit cost methods when the required detail and available inputs support them.Confirm the occupancy, construction and area basis and how the method handles mixed uses or unusual equipment.Cotality

A repeatable workflow starts with the address and building match in Invariant Earth. Keep the parcel’s assessed values alongside the building attributes and send the verified building inputs to the estimator your team accepts. Save the estimator’s output and its assumptions with the same building identifier.Invariant EarthCalifornia Department of Insurance

What to confirm before using the number

  • Confirm the specific structures on the property schedule, including accessory structures and shared systems where applicable.
  • Reconcile floor area and occupancy with current building plans, the schedule or an inspection. Check construction, renovations and specialized systems.
  • Record the pricing date and confirm how the estimate treats demolition, debris removal, code upgrades, building equipment and contents. Verify the applicable policy terms and limits.
  • Retain the original source, field definition and building identifier. Route material differences for review while preserving both source values.
California Department of InsuranceInvariant EarthVeriskU.S. Army Corps of Engineers

Questions that come up.

Can I look up commercial building replacement cost by address?

Use an address match to locate the intended footprint, then query the 2026 NSI for a public screening estimate. For an underwriting valuation, verify the building attributes and use the estimator or appraisal process accepted by the carrier.Invariant EarthU.S. Army Corps of EngineersU.S. Army Corps of EngineersCalifornia Department of Insurance

What is the difference between fullrep and val_struct in the 2026 NSI?

Fullrep is the modeled cost to build a comparable new structure. Val_struct is the modeled structural value after depreciation. The published values use approximately August 2025 prices.U.S. Army Corps of EngineersU.S. Army Corps of Engineers

How do I handle multiple NSI rows at the same building?

Check the shared footprint identifier and occupancy codes. The Corps sometimes models several uses as separate records at one footprint. Count the footprint once for building counts and preserve the individual occupancy records when reviewing the model’s total.U.S. Army Corps of EngineersU.S. Army Corps of Engineers

Can tax assessed value be used as building replacement cost?

Use the assessment for the tax decision it describes. For reconstruction, verify the insured building and get a current estimate using the applicable construction costs and coverage scope. For example, NYC’s Class 4 assessment applies a tax ratio to a market value based on income potential and expenses.NYC Department of FinanceNYC Department of FinanceCalifornia Department of Insurance

Can a construction contract or permit value establish a building insurance limit?

Use its dated scope to check a reconstruction estimate. The contract or permit covers the work described in the record. Confirm the carrier’s valuation and the issued policy’s building limit, endorsements and deductible separately.Contract and contingency authorizationSpending, estimate and occupancy milestonesFlood insurance authorizationCalifornia Department of Insurance

Sources and references.

Primary sources checked for this guide on .

  1. NYC Department of City PlanningNYC Geosearch address match for 32 Old Slip ↗
  2. NYC Office of Technology and InnovationOfficial building footprint query for BIN 1000867 ↗
  3. NYC Department of City PlanningPLUTO 26v3 tax lot query for BBL 1000350001 ↗
  4. NYC Department of FinanceFY2027 Department of Finance rows for BBL 1000350001 ↗
  5. NYC Department of FinanceAssessment data dictionary and roll period codes ↗
  6. NYC Department of FinanceHow NYC values commercial property for tax ↗
  7. NYC Department of FinanceNYC property tax assessment ratios ↗
  8. U.S. Army Corps of EngineersNSI public structures query around 32 Old Slip ↗
  9. U.S. Army Corps of EngineersNational Structure Inventory 2026 API reference ↗
  10. U.S. Army Corps of EngineersNSI 2026 technical documentation for structural values and occupancy types ↗
  11. U.S. Army Corps of EngineersNSI 2026 usage guidance on stacked records, price levels and building precision ↗
  12. California Department of InsuranceCommercial insurance coverage and replacement cost valuation ↗
  13. Invariant EarthVerify a commercial building by address with Invariant Earth ↗
  14. VeriskVerisk 360Value for commercial property replacement cost ↗
  15. CotalityCommercial reconstruction cost data and methods ↗
  16. Sanibel Fire & Rescue DistrictResolution 24-010, signed March 13, 2024 ↗
  17. Sanibel Fire & Rescue DistrictAudited FY2025 financial statements, Note L, pages 54 and 55 ↗
  18. Sanibel Fire & Rescue DistrictResolution 25-025, signed December 10, 2025 ↗

Try Invariant Earth on a site you know.

Pick a US coordinate and inspect the source, dataset vintage, and status for each field.

Open the API quickstart