Data center water use calculator
Estimate on-site water use from average IT load and water usage effectiveness, or calculate WUE from annual water and IT energy records.
Site figures
Use IT energy and water figures for the same site and reporting year.
Estimated annual water use
138.85 million US gal
- Annual on-site water, liters
- 525.6 million L
- Average daily water use
- 380,407.8 US gal/day
- Annual IT energy
- 876 GWh
Use the cooling design’s maximum-day and peak-hour flows to size service.
How to calculate data center water use
Multiply annual IT equipment energy in kilowatt-hours by site WUE in liters per kilowatt-hour. Multiply average IT megawatts by the hours in the reporting year and by 1,000 to get kilowatt-hours. To calculate WUE from your records, divide on-site water in liters by IT kilowatt-hours for the same period. One US gallon is about 3.785412 liters.
How much water does a 100 MW data center use?
At 100 MW of average IT load and a site WUE of 0.6 liters per kilowatt-hour, a 365-day year uses 876 GWh of IT energy and about 138.85 million US gallons of on-site water. That averages about 380,408 gallons per day. The 100 MW in this example is average IT load. If your figure is the facility’s utility service or rated capacity, get the expected IT energy from the design or meters first.
What should you ask the water utility for?
Break demand out by source and phase, then ask what the utility can deliver during the peak hour and maximum day. Bring the cooling design’s pressure, storage and backup-supply requirements. Track water delivered, water consumed and water discharged on separate lines. A site WUE based on consumption estimates consumption. Water supplied or withdrawn can also include water discharged after use.
In its October 2025 study for the proposed Pittsburg Data Hub, California Energy Commission staff estimated 58,407 gallons per day of average recycled-water demand. Staff listed domestic water and sewer demand separately. The filing is an example of a planning water balance. Use your own design and the provider’s written allocation and discharge conditions for a site decision.