Data center site feasibility study

Also known as: site feasibility study, site feasibility screen, data center feasibility study, preliminary site assessment

A data center site feasibility study is a first screen of a site from a coordinate and a target MW: power at nearby substations, flood zone, seismic hazard, wetlands and species, airspace, zoning and moratoriums, water, fiber and the parcel, ending in a go or no-go.

The feasibility study is the first of two due diligence steps. It is built to remove sites quickly and cheaply, before an option payment or a utility study deposit. Power is checked first because it removes the most sites: the serving utility, the nearest substations and lines at a usable voltage, and a screening MW range at each.

Flood comes from FEMA's National Flood Hazard Layer, seismic values from the USGS hazard model and the ASCE Hazard Tool, wetlands from the National Wetlands Inventory, listed species from IPaC and airspace from FAA Part 77. Sites that pass go on to a utility-grade power study.

Data center site feasibility study ↗

Related terms

Sources

Last updated 20 November 2026