ERCOT LMP vs. Settlement Point Price

Find ERCOT dispatch and 15-minute settlement prices. Replay one quarter-hour and verify a $25.70/MWh gap between the West Load Zone and West Hub.

ERCOT’s published real-time prices from 6:30 to 6:45 p.m. CST on November 25, 2026, were $46.78 per MWh at West Hub, $62.14 at ALP_BESS_RN, and $72.48 at West Load Zone.

ERCOT NP6-905-CD, November 25, 2026, delivery hour 19, interval 3. Prices shown in US dollars per MWh as posted.

ERCOT’s real-time locational marginal price (LMP) is a dispatch price for a location at a Security-Constrained Economic Dispatch run. The real-time Settlement Point Price (SPP) is the published price for a 15-minute settlement interval. Match the price series, settlement point and delivery interval before calculating an energy cost or comparing power contracts. In one November 25 quarter-hour, ERCOT posted $46.78/MWh at West Hub and $72.48/MWh at West Load Zone. That $25.70/MWh difference comes from comparing two different settlement points at the same time.

Before you start

  • Use NP6-788-CD for dispatch LMPs at settlement points, NP6-787-CD for electrical bus LMPs and NP6-905-CD for 15-minute settlement point prices.
  • Match the exact point name, point type and delivery interval. The ERCOT export can list a load zone under more than one type.
  • At resource node ALP_BESS_RN, weighting four dispatch intervals by their seconds in the quarter-hour reproduces the posted $62.14/MWh to the cent. Averaging the three runs that started inside the quarter gives $62.25/MWh.

Which ERCOT price series should you use?

QuestionERCOT reportWhat to keep from the record
What price did a dispatch run produce at a resource node, hub or load zone?NP6-788-CD, LMPs by settlement point. Dispatch usually runs about every five minutes.SCED timestamp, repeated-hour flag and settlement point name.Dispatch LMP report
What was the price at a specific electrical bus?NP6-787-CD, LMPs by electrical bus.Electrical bus identifier and dispatch timestamp. Check any mapping to a settlement point separately.Electrical bus LMP report
What real-time price was posted for the contract’s settlement interval?NP6-905-CD, settlement point prices at 15-minute intervals.Delivery date, hour, interval, repeated-hour flag, point name and point type.15-minute settlement price reportSettlement calculation rules
Was a reliability deployment price adder present?NP6-323-CD, price adders by dispatch interval.Timestamp, repeated-hour flag and the separate energy adder field, RTRDPA.SCED price adder reportSettlement calculation rules

A resource node, trading hub and load zone are different settlement locations. ERCOT’s rules specify how prices are formed for each. Start with the point and product named in your contract or market workflow. When you need a historical result, save the report edition and check for corrections after the initial posting.Settlement calculation rulesPrice history and corrections

How does a dispatch LMP become a 15-minute settlement price?

The sample covers 18:30 to 18:45 Central Standard Time on November 25, 2026. ERCOT identifies it as delivery hour 19, interval 3, with DST flag N. In UTC it runs from 00:30 to 00:45 on November 26. The dispatch run at 18:25:25 was still in effect for the first 20 seconds. The run at 18:45:25 falls beyond the interval.November 25 settlement ZIPDispatch LMP reportSettlement calculation rules

SCED run start, CSTSeconds in this quarter-hourALP_BESS_RN LMPEnergy adder
18:25:2520$58.72/MWh$0.00/MWh
18:30:20298$60.80/MWh$0.00/MWh
18:35:18301$62.06/MWh$0.00/MWh
18:40:19281$63.90/MWh$0.00/MWh
Dispatch LMP reportSCED price adder report

For a resource node, ERCOT applies the published time weights to the dispatch prices plus the energy adder, subject to the applicable price floor. In this quarter-hour the four energy adders were zero. The weighted sum divided by 900 seconds was $62.1431/MWh, which rounds to the posted $62.14/MWh. An equal-weight average of the three runs that started in the quarter-hour gives $62.25/MWh. The downloadable record includes the prior and next dispatch timestamps so you can check the interval boundaries.Settlement calculation rulesSCED price adder reportNovember 25 settlement ZIP

ERCOT dispatch and settlement price replay for November 25, 2026

Download the selected ERCOT rows, source ZIP links and calculation JSON
Cite dataset

Invariant (2026). ERCOT dispatch and settlement price replay for November 25, 2026 [Data set]. https://invariant-ai.com/blog/ercot-lmp-vs-settlement-point-price#dataset

Archived release v1.0.1 · 2026-11-26

Download citation (CSL JSON)

Check the Texas utility process for a large load

Download the Python replay Python

Save the Python script beside the JSON and run python3 ercot-settlement-replay.py. It derives the four time weights and checks the posted price. The versioned ZIP also includes instructions for verifying all ten original ERCOT archives.Versioned replay and checksums

Why can the West Hub and West Load Zone prices differ?

Settlement pointType as publishedReal-time SPP
HB_WESTTrading hub (HU)$46.78/MWh
LZ_WESTLoad zone (LZ)$72.48/MWh
ALP_BESS_RNResource node (RN)$62.14/MWh
HB_HOUSTONTrading hub (HU)$31.76/MWh
LZ_HOUSTONLoad zone (LZ)$31.91/MWh
November 25 settlement ZIP

For the same 15 minutes, West Load Zone minus West Hub was $25.70/MWh. Houston’s load zone minus hub was $0.15/MWh. A flat 50 MW load would consume 12.5 MWh during the interval. Multiplying that volume by the West price difference gives an illustrative $321.25 difference in the indexed energy component. Apply the contract’s settlement point, meter profile, delivery charges and other terms for a site budget.November 25 settlement ZIPSettlement calculation rules

The original export lists both LZ and energy-weighted LZEW records for West and Houston. The two type rows share a name and happen to have the same price for these zones in this quarter-hour. Preserve the type in the raw key, then select the relevant series before calculating a spread. Use the quoted contract point when comparing procurement options.November 25 settlement ZIPGrid Status pricing datasets

How do you compare ERCOT price data APIs?

Give each candidate the same local time window and point type. Request the source timestamp, UTC timestamp, price units, correction treatment and source report. Start with the posted ERCOT prices as the control.ERCOT Public APIPrice history and corrections

Product or toolDocumented starting pointWhat to verify in the same trial
ERCOT Public API and public reportsThe market operator’s pricing products, with direct report IDs and a registered API.Retrieve NP6-788-CD and NP6-905-CD separately. Preserve the dispatch boundary times and raw point type codes.ERCOT Public APIDispatch LMP report15-minute settlement price report
Grid StatusSeparate ERCOT dispatch LMP and 15-minute settlement datasets.Check whether your selected location field preserves the LZ and LZEW distinction. Verify UTC conversion and how corrected prices enter the series.Grid Status pricing datasets
Yes Energy DataSignalsNodal market time series through its API and datasets with historical versions.Ask for the as-posted record and any later revision for the same interval. Match the exact West Load Zone and West Hub types.Yes Energy DataSignals
ISO-DARTAn open-source Python client with distinct ERCOT dispatch and settlement data products.Save the query parameters and API timestamps. Verify that the returned report matches your intended interval and price series.ISO-DART ERCOT pricing guide
DryosPublic query endpoints for dispatch LMP and 15-minute settlement prices.Compare the returned type code and source publication time against ERCOT’s raw rows. Check the duplicate name case at West Load Zone.Dryos settlement data APIDryos dispatch LMP data API
Invariant EarthJoin the electricity evidence to the site’s mapped utility territory and physical assets where fields are available.Start with an exact site match and check the field sources. Attach the relevant contract or ERCOT record to establish the settlement point and pricing basis.Earth API field catalog

We queried Dryos for the same quarter-hour at West Hub, West Load Zone and ALP_BESS_RN. It returned $46.78, $72.48 and $62.14/MWh, matching the ERCOT file at the corresponding types. The West Load Zone query returned one LZEW row. ERCOT’s raw file includes both LZ and LZEW. The prices coincide in this sample, so checking the price alone would miss the difference in returned types.November 25 settlement ZIPDryos West Load Zone query

Questions that come up.

What is the difference between LMP and SPP in ERCOT?

An LMP comes from a dispatch run at a location. The 15-minute SPP is the published real-time price for a settlement point and delivery interval, calculated under ERCOT’s rules for resources, hubs and load zones.Dispatch LMP report15-minute settlement price reportSettlement calculation rules

Which ERCOT report has 15-minute prices?

Use NP6-905-CD for real-time Settlement Point Prices at resource nodes, hubs and load zones. Keep the delivery date, hour, interval, repeated-hour flag, point name and point type.15-minute settlement price reportNovember 25 settlement ZIP

Can I average three five-minute LMP readings to get an ERCOT settlement price?

For a resource node, weight each dispatch run by the seconds it covers inside the quarter-hour, include the applicable energy adder, and apply ERCOT’s price calculation rules. Use the published SPP to verify the result.Settlement calculation rulesSCED price adder reportNovember 25 settlement ZIP

Sources and references.

Primary sources checked for this guide on .

  1. ERCOTLMPs by Resource Nodes, Load Zones and Trading Hubs, NP6-788-CD ↗
  2. ERCOTLMPs by Electrical Bus, NP6-787-CD ↗
  3. ERCOTSettlement Point Prices at Resource Nodes, Hubs and Load Zones, NP6-905-CD ↗
  4. ERCOTReal-Time Price Adders by SCED Interval, NP6-323-CD ↗
  5. ERCOTNovember 25, 2026 hour 19 interval 3 posted settlement ZIP ↗
  6. InvariantERCOT settlement price replay v1.0.1 ↗
  7. ERCOTNovember 6, 2026 Nodal Protocol Section 6.6.1, real-time settlement prices ↗
  8. ERCOTMarket prices, historical hub and load zone series and price corrections ↗
  9. ERCOTERCOT developer portal, API access and registration ↗
  10. Grid StatusGrid Status interval and pricing dataset guide ↗
  11. Yes EnergyDataSignals nodal price history and API ↗
  12. Lawrence Livermore National LaboratoryISO-DART utility for ERCOT dispatch and settlement products ↗
  13. InvariantInvariant Earth field catalog ↗
  14. DryosDryos real-time 15-minute settlement dataset and query fields ↗
  15. DryosDryos real-time LMP dataset and query fields ↗
  16. DryosDryos West Load Zone API query for the same settlement interval ↗

Try Invariant Earth on a site you know.

Pick a US coordinate and inspect the source, dataset vintage, and status for each field.

Open the API quickstart