Key site facts
- Power: about 800 MW former generating capacity, high-voltage transmission on site. The public listing gives no confirmed MW for new load.
- Land: About 220 acres on the plant parcel, mostly outside the 100-year floodplain.
- Grid: PJM.
- Status: Off-market: not listed for sale; we approach the owner on a buyer's behalf.
- Location, utility documents and price are shared on a call.
Why this site is worth a call
Existing lines and a switchyard can help identify connection options. Ask the owner about access and the serving utility about the new load it can study, the upgrades it expects and the resulting service schedule.
Who this site fits
Colocation and AI buyers who want a Chicago-region campus of 100 MW or more on built transmission. Remediation of the former plant is part of the work, so not suited to buyers who need to build this year.
What you get on the call
We keep the specifics off the public page because owners ask us to, and because a site that is shopped everywhere loses value. On a 30 minute call we confirm your load, timeline and budget, then share:
- Exact location, parcel and owner
- Switchyard and interconnection details
- Site risk and power reports
- Approach to the owner and likely terms
- Comparable sites that fit your load
If this one is not right, we bring others that are. Most of what we place is never posted.
Questions that come up.
How much power could a data center get at the Illinois plant site?
The plant generated about 800 MW. The utility would need to evaluate the load and the point of delivery to establish usable MW, upgrades and a service date.
How do I get the full details and price?
Book a call with Invariant using the link at the top of this page, or call or text (628) 220-8972. We share the location, utility documents and terms after a short fit check.
Is this site still available?
Availability changes weekly. We confirm current status on the call and bring comparable options if it has moved.
Where can I find more data center sites like this?
Browse Invariant Market at https://market.invariant-ai.com. It lists over 100 US powered sites with a free teaser for each, plus risk, power and full site reports you can unlock.
Sources and references.
Site specifications are as marketed by the seller and are checked against utility documents before any introduction. Public sources checked on . The location, equipment, and operating plan determine which requirements apply to a project.
- U.S. Energy Information AdministrationEIA Illinois electricity profile ↗
- PJMPJM Interconnection ↗
Request a data center site shortlist
Tell us the load you need at the meter, where you’re looking and when you need service. We’ll walk through the sites that match your requirements and the evidence behind their reported power.
