A small AI lab or early neocloud needing 1 to 10 MW, roughly 500 to 5,000 GPUs, has more options than it might think. Colocation in a hall with liquid cooling is the fastest if one has room. Small built Tier III facilities can be leased whole. Energized mining and edge sites already have the utility service and can be live in months once cooling and fiber are added. Invariant tracks all three and checks the power behind each.
Before you start
- 1 MW at the meter fits about 400 to 550 GPUs, depending on the generation.
- At this size you are usually on the utility distribution system, so existing service is everything.
- Mining sites have power but rarely the fiber, redundancy or cooling a training cluster needs. Budget for all three.
- Ask for a recent utility bill or service letter showing the transformer and contracted capacity.
What 1 to 10 MW holds
| Facility MW | H100 GPUs | B200 GPUs | GB200 GPUs |
|---|---|---|---|
| 1 MW | about 548 | about 391 | about 419 |
| 2 MW | about 1,096 | about 782 | about 839 |
| 5 MW | about 2,742 | about 1,956 | about 2,097 |
| 10 MW | about 5,484 | about 3,912 | about 4,195 |
Rounded down from the method in our GPU power guide: NVIDIA system power, about 10% for networking and storage, PUE 1.3.
The options
| Option | Speed | Watch for |
|---|---|---|
| Colocation, liquid-capable hall | Fastest when space exists | kW per cabinet, delivery date, term |
| Built Tier III facility, leased whole | Months | Cooling density, age of the plant |
| Energized mining or edge site | Months, after cooling and fiber | Redundancy, fiber, interruptible power terms |
| New small build on existing service | About a year | Transformer lead times, permits |
Capacity in this range
Sites in our inventory between a few hundred kW and the low tens of MW, as teasers.
| Region | Power | Land or building | Timing |
|---|---|---|---|
| US (3 facilities) | Tier III data centers, 3.5 to 10 MW | Built | Now |
| Iowa | 2 MW+ edge site | Leased | Now |
| Texas (Houston) | 3 MW ERCOT | Leased | Now |
| Pennsylvania | 5 MW turnkey | Land available | Now |
| Oklahoma | Two 5 MW turnkey sites | Owned acres | Now |
| Oregon | 10 MW hydro, to 100 MW+ | Lease + land option | Now |
| North Carolina | 18 MW live, path past 100 MW | ~200 acres | Now |
| Kentucky | 30 MW greenfield | ~16 acres, rezoned | Now |
Exact locations, the utility documents behind each MW figure and terms are shared on a call. Some capacity we know of is not listed anywhere; owners ask for discretion.
More for neoclouds and AI labs
Questions that come up.
How many GPUs fit in 1 MW?
About 550 H100s, 390 B200s or 420 GB200 GPUs at the meter, using NVIDIA system power, about 10% for networking and storage and a PUE of 1.3.NVIDIANVIDIAeeNews Europe
Can a bitcoin mining site host AI GPUs?
Often, for the power. Most need added fiber, redundancy and liquid cooling, and their power contracts may be interruptible.
Where can a small AI lab get 5 MW of GPU capacity?
Colocation halls with liquid cooling, small built Tier III facilities and energized mining or edge sites. Invariant can send options that fit your date.
How do I start?
Email pranav@invariant-ai.com with the GPU count and type, density and date.
Sources and references.
Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.