Where a small AI lab can put 1 to 10 MW of GPUs in the US

Options for a small AI lab or neocloud needing 1 to 10 MW for GPUs: colocation, Tier III rooms, energized edge and mining sites, with timing and what to check.

A small AI lab or early neocloud needing 1 to 10 MW, roughly 500 to 5,000 GPUs, has more options than it might think. Colocation in a hall with liquid cooling is the fastest if one has room. Small built Tier III facilities can be leased whole. Energized mining and edge sites already have the utility service and can be live in months once cooling and fiber are added. Invariant tracks all three and checks the power behind each.

Before you start

  • 1 MW at the meter fits about 400 to 550 GPUs, depending on the generation.
  • At this size you are usually on the utility distribution system, so existing service is everything.
  • Mining sites have power but rarely the fiber, redundancy or cooling a training cluster needs. Budget for all three.
  • Ask for a recent utility bill or service letter showing the transformer and contracted capacity.

What 1 to 10 MW holds

Facility MWH100 GPUsB200 GPUsGB200 GPUs
1 MWabout 548about 391about 419
2 MWabout 1,096about 782about 839
5 MWabout 2,742about 1,956about 2,097
10 MWabout 5,484about 3,912about 4,195
NVIDIANVIDIAeeNews Europe

Rounded down from the method in our GPU power guide: NVIDIA system power, about 10% for networking and storage, PUE 1.3.

The options

OptionSpeedWatch for
Colocation, liquid-capable hallFastest when space existskW per cabinet, delivery date, term
Built Tier III facility, leased wholeMonthsCooling density, age of the plant
Energized mining or edge siteMonths, after cooling and fiberRedundancy, fiber, interruptible power terms
New small build on existing serviceAbout a yearTransformer lead times, permits

Capacity in this range

Sites in our inventory between a few hundred kW and the low tens of MW, as teasers.

RegionPowerLand or buildingTiming
US (3 facilities)Tier III data centers, 3.5 to 10 MWBuiltNow
Iowa2 MW+ edge siteLeasedNow
Texas (Houston)3 MW ERCOTLeasedNow
Pennsylvania5 MW turnkeyLand availableNow
OklahomaTwo 5 MW turnkey sitesOwned acresNow
Oregon10 MW hydro, to 100 MW+Lease + land optionNow
North Carolina18 MW live, path past 100 MW~200 acresNow
Kentucky30 MW greenfield~16 acres, rezonedNow

Exact locations, the utility documents behind each MW figure and terms are shared on a call. Some capacity we know of is not listed anywhere; owners ask for discretion.

More for neoclouds and AI labs

Questions that come up.

How many GPUs fit in 1 MW?

About 550 H100s, 390 B200s or 420 GB200 GPUs at the meter, using NVIDIA system power, about 10% for networking and storage and a PUE of 1.3.NVIDIANVIDIAeeNews Europe

Can a bitcoin mining site host AI GPUs?

Often, for the power. Most need added fiber, redundancy and liquid cooling, and their power contracts may be interruptible.

Where can a small AI lab get 5 MW of GPU capacity?

Colocation halls with liquid cooling, small built Tier III facilities and energized mining or edge sites. Invariant can send options that fit your date.

How do I start?

Email pranav@invariant-ai.com with the GPU count and type, density and date.

Sources and references.

Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. NVIDIAIntroduction to the NVIDIA DGX H100 system ↗
  2. NVIDIAIntroduction to the NVIDIA DGX B200 system ↗
  3. eeNews EuropeNvidia offers 120 kW liquid-cooled Blackwell rack as industry standard ↗