The Central Electricity Authority estimates data centre power demand in India at about 17 GW by 2031-32, the figure the government gave Parliament in August 2026. Other official figures differ: 13.56 GW by 2031-32 was cited in March 2026, and, as reported by Business Standard, the Minister of State for Power told Parliament in July 2026 that AI data centres would add 26.3 GW by 2031-32. Data centre capacity is under 1% of installed power capacity today, according to the government, against an all-India peak that reached 256.1 GW in April 2026. The load is concentrated: Crisil Ratings estimates data centre capacity could equal about 60% of Mumbai’s current peak demand by FY2030.
Before you start
- The Central Electricity Authority projects about 17 GW of data centre demand in India by 2031-32 (PIB, August 2026).
- Other government figures for 2031-32 range from 13.56 GW (March 2026) to 26.3 GW of additional AI data centre load (July 2026, reported by Business Standard), depending on scope and date.
- All-India peak demand was 250 GW in May 2024 and 256.1 GW in April 2026, according to the Ministry of Power; ANI reported a daytime peak of 270.82 GW in May 2026.
- Data centre capacity is less than 1% of India’s installed power capacity, according to the government’s August 2026 reply to Parliament.
- Locally the share is large: Crisil Ratings puts data centre capacity at about 60% of Mumbai’s and about 80% of Visakhapatnam’s current peak by FY2030, as reported by Deccan Herald.
Official projections of data centre power demand in India, side by side
| Figure | Horizon | Who said it | Source level |
|---|---|---|---|
| About 17 GW of data centre demand | 2031-32 | Central Electricity Authority, in a government reply to the Rajya Sabha (August 2026) | PIB release |
| 13.56 GW | 2031-32 | Minister of State for Electronics and IT, citing Ministry of Power data (March 2026) | Reported by PSU Watch and Business Standard |
| More than 13.6 GW, and 16.4 GW by 2040 | 2032 and 2040 | CEA National Generation Adequacy Plan, March 2026 | Reported by ThePrint |
| 26.3 GW of additional AI data centre load | 2031-32 | Minister of State for Power, written reply to Parliament (July 2026) | Reported by Business Standard |
The figures do not all measure the same thing: the 26.3 GW figure is additional load from AI data centres, while the others are for data centre demand. They also date from different months of 2026. Business Standard reported that the 26.3 GW figure is nearly double the March estimate and is expected to be served primarily by renewable energy capacity.Business Standard
Data centre demand against India’s peak demand and installed capacity
| Measure | Figure | Date |
|---|---|---|
| All-time peak demand | 250 GW | 30 May 2024 |
| FY 2025-26 peak | 245.4 GW | 9 January 2026 |
| Peak demand met | 256.1 GW (solar 21.5% of supply at the peak) | 25 April 2026 |
| Reported daytime peak | 270.82 GW | 21 May 2026 |
| Non-fossil installed capacity | 283.46 GW, of which renewables 274.68 GW | 31 March 2026 |
| Data centre share of installed capacity | Less than 1% | August 2026 |
The Ministry of Power’s year-end review gave 242.49 GW as the FY 2025-26 maximum, while its April 2026 release cites 245.4 GW on 9 January 2026; we use the later figure. The 270.82 GW peak was reported by ANI, citing the Ministry of Power; we did not find a PIB release for it. CEA’s mid-term review of the 20th Electric Power Survey projects all-India peak demand of 388 GW in 2031-32, as reported by Business Standard.PIB, Ministry of PowerPIB, Ministry of PowerANIBusiness Standard
Where data centre power demand concentrates in India
Data centre load in India is concentrated, so national shares understate the local effect. Crisil Ratings estimates, as reported by Deccan Herald, that by FY2030 data centre capacity could equal about 60% of Mumbai’s current peak demand, about 20% of Hyderabad’s and about 80% of Visakhapatnam’s. The Star reported in May 2026 that data centres could consume a third of the electricity produced in Mumbai by 2030.Deccan HeraldThe Star (Asia News Network)
Cushman & Wakefield counted 1,789 MW of operational capacity in the top seven cities in H1 2026, with Mumbai holding 890 MW, and 3,860 MW of upcoming supply expected by 2030. Structure Research reports that committed and under-construction capacity in Navi Mumbai is approaching the roughly 6 GW of grid capacity MSEDCL allocated to data centres there.Cushman & WakefieldStructure Research
How Indian grid planners are responding to data centre load
- CEA set up a committee on the operational, policy and regulatory issues of large data centres, their grid impact and cybersecurity, reporting to the National Power Committee (KNN India, October 2026).
- CEA asked states including Maharashtra, Andhra Pradesh, Telangana and Tamil Nadu to enhance resource adequacy for data centre demand (ThePrint, April 2026).
- CERC’s June 2026 draft would let data centres hold both state and inter-state connections; CTUIL cites uncertainty in data centre loads as one reason transmission planning is stuck.
- S.K. Soonee, founding CEO of POSOCO, and Parikshit Pareek of IIT Roorkee have urged that data centre load characteristics, such as planned IT load, PUE and UPS configuration, be integrated into CEA’s transmission and distribution planning criteria.
Nuclear is part of the government’s answer: in his August 2026 Independence Day address the Prime Minister linked chips, AI and data centres to electricity demand and the SHANTI Act, with a 100 GW nuclear target for 2047.PIB
How Invariant helps
For a site or shortlist in India, Invariant checks how the site gets power: the discom or transmission connection, the voltage the load falls under, the nearest substations, the open access or captive route and the document behind the MW. We also screen seismic zone, flood history, groundwater status and airport height limits, and map the central and state approvals with the authority behind each. Send the state, the MW and the date you need power.
More on data centres in India
Questions that come up.
How much power will data centres in India need by 2030?
Official projections are for 2031-32: about 17 GW, according to the Central Electricity Authority (August 2026). Other government figures are 13.56 GW, and 26.3 GW of additional AI data centre load.PIB, Ministry of Electronics and ITPSU WatchBusiness Standard
What share of India’s electricity do data centres use?
Data centre capacity is less than 1% of India’s installed power capacity, according to the government’s August 2026 reply to Parliament.PIB, Ministry of Electronics and IT
Why do India data centre power demand estimates differ?
They were made at different times during 2026 and do not all measure the same thing: the 26.3 GW figure reported by Business Standard is additional load from AI data centres. CEA’s 17 GW and that 26.3 GW are both for 2031-32.PIB, Ministry of Electronics and ITBusiness Standard
What is India’s peak power demand in 2026?
India met a peak demand of 256.1 GW on 25 April 2026, according to the Ministry of Power. ANI reported a daytime peak of 270.82 GW on 21 May 2026.PIB, Ministry of PowerANI
Will data center demand strain the grid in Mumbai?
Crisil Ratings estimates that by FY2030 data centre capacity could equal about 60% of Mumbai’s current peak demand. Structure Research reports that committed and under-construction capacity in Navi Mumbai is approaching its roughly 6 GW grid allocation.Deccan HeraldStructure Research
Sources and references.
Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.
- PIB, Ministry of Electronics and ITInstalled data centre capacity and CEA demand estimate (Rajya Sabha reply, 7 August 2026) ↗
- PSU WatchElectricity demand from data centres to reach 13.56 GW by 2031-32 ↗
- ThePrintData centre gold rush risks blackouts, central electricity body warns states ↗
- Business StandardAI data centres to add 26.3 GW to India power demand by FY32: govt ↗
- PIB, Ministry of PowerYear End Review 2024, Ministry of Power ↗
- PIB, Ministry of PowerYear End Review 2025, Ministry of Power ↗
- PIB, Ministry of PowerPeak demand of 256.1 GW met on 25 April 2026 ↗
- ANIHeat wave pushes daytime peak power demand to record 270.82 GW ↗
- PIB, Ministry of New and Renewable EnergyNon-fossil installed capacity as of 31 March 2026 ↗
- Deccan HeraldIndia set for five times surge in its data centre capacity by 2030 (Crisil Ratings report) ↗
- The Star (Asia News Network)India's data centre boom is straining its power grid ↗
- Cushman & WakefieldIndia Data Centre Market Overview H1 2026 ↗
- Structure ResearchMumbai and Pune data centre report 2026 ↗
- KNN IndiaCEA sets up committee to assess data centres’ impact on power grid stability ↗
- Central Electricity Regulatory CommissionDraft GNA Fourth Amendment, explanatory memorandum (16 June 2026) ↗
- Power LinePowering the AI era: preparing the grid for the data centre boom ↗
- PIBIndependence Day address highlights (15 August 2026) ↗