India had about 1.6 to 1.8 GW of live data centre capacity in mid-2026, half of it in Mumbai. Data centre counts by city, the operators, policy and power supply.

India had between 1.6 GW and 1.8 GW of operational data centre capacity in mid-2026, according to JLL, Cushman & Wakefield and Savills, and Cushman & Wakefield counted 147 data centres in the top seven cities. The estimates differ partly because each publisher counts different facilities. The government told Parliament in August 2026 that capacity had grown from 375 MW in 2020 to about 1,575 MW. Mumbai holds about half. A further 509 MW was under construction and 3,351 MW planned in H1 2026, and forecasts for 2030 run from about 5.6 GW to 8 GW. Crisil Ratings says the pace will hinge on timely power connectivity, regulatory approvals and project execution.

Before you start

  • India’s live data centre capacity in mid-2026 was about 1.6 GW on JLL’s count, 1,789 MW on Cushman & Wakefield’s (top seven cities) and 1,819 MW of IT load on Savills’ count; CBRE expects 2 GW by the end of 2026.
  • Mumbai holds about 50% of India’s operational data centre capacity, followed by Chennai (12%), Delhi NCR (10%), Bengaluru (9%), Hyderabad (8%), Pune (7%) and Kolkata (2%), according to Cushman & Wakefield for H1 2026.
  • NTT had the largest operator share in H1 2026 at 21%, ahead of Sify and STT GDC at 19% each, according to Anarock.
  • India still has no notified national data centre policy. Data centres of 5 MW IT load or more have had infrastructure status since 2022, and Budget 2026-27 added a tax holiday to 2047 for foreign cloud firms using Indian data centre services.
  • The Central Electricity Authority estimates data centre power demand of about 17 GW by 2031-32.

India data centres in numbers (as of 21 November 2026)

MeasureFigureSource and period
Operational capacity (government estimate)About 1,575 MW, up from 375 MW in 2020Rajya Sabha reply, 7 August 2026
Operational capacity (top seven cities)1,789 MW in 147 data centres, 33 operatorsCushman & Wakefield, H1 2026
Under construction509 MWCushman & Wakefield, H1 2026
Planned, to 20303,351 MW (3,860 MW upcoming in total)Cushman & Wakefield, H1 2026
Expected by end-20262 GWCBRE, as reported by IBEF, October 2026
Colocation vacancy14.9% (Mumbai 7.9%)Cushman & Wakefield, H1 2026
Largest marketMumbai, 890 MW (about 50%)Cushman & Wakefield, H1 2026
Power demand outlookAbout 17 GW by 2031-32Central Electricity Authority, via PIB
Share of national power capacityLess than 1%Government statement, August 2026
States with dedicated data centre policies11Invest India and Cushman & Wakefield, as of September 2026
PIB, Ministry of Electronics and ITCushman & WakefieldIBEFInvest India and Cushman & Wakefield

The government figure and the broker figures measure slightly different things. A parliamentary committee report, as reported by MediaNama, records that MeitY maintains no official data on data centre capacity, so every capacity number here, including the official one, is an estimate with a stated basis.PIB, Ministry of Electronics and ITMediaNama

India’s data centre capacity in 2026, by research house

Five research houses published estimates of India’s live data centre capacity for H1 2026. They agree on the order of magnitude and disagree on the last few hundred MW, partly because they count different things: SBI counts only colocation, Cushman & Wakefield counts colocation and hyperscale cloud in the top seven cities but excludes captive facilities, and Savills includes enterprise and edge facilities.SBI CHAKRAInvest India and Cushman & WakefieldCommunications Today

PublisherLive capacityPeriodWhat it counts
JLLAbout 1.6 GWMid-2026Not stated
Cushman & Wakefield1,789 MWH1 2026Top seven cities, colocation plus hyperscale cloud, excludes captive
Savills1,819 MW ITH1 2026All segments including edge and enterprise
AnarockMore than 1.8 GWH1 2026Not stated
CBRE2 GW expectedEnd-2026Not stated
SBI CHAKRAAbout 1.5 GW2025Colocation only
JLLCushman & WakefieldCommunications TodayAnarockIBEFSBI CHAKRA

India added between 85 MW (JLL) and 178 MW (Cushman & Wakefield) of capacity in H1 2026, or 258 MW of IT load on Savills’ count. Hyperscalers took more than 80% of absorption in the half, and pre-leased capacity roughly doubled to 1.15 GW.JLLCushman & WakefieldCommunications TodayInvest India and Cushman & Wakefield

India’s data centre capacity forecast to 2030

Forecasts for India’s data centre capacity at the end of the decade run from 5,649 MW by end-2030, if Cushman & Wakefield’s pipeline is delivered, to about 8 GW in its AI scenario; JLL, SBI CHAKRA, Anarock, Savills and Crisil Ratings fall in between.Invest India and Cushman & WakefieldJLLSBI CHAKRAAnarockCommunications TodayDeccan Herald

PublisherForecastHorizon
Cushman & Wakefield (pipeline delivered)5,649 MWEnd-2030
JLLAbout 6 GW2029
SBI CHAKRAMore than 6.5 GW2030
AnarockMore than 6.7 GW2030
SavillsMore than 7 GW IT2030
Crisil RatingsAbout 7.5 GWMarch 2030
Cushman & Wakefield (AI scenario)About 8 GWEnd-2030
Invest India and Cushman & WakefieldJLLSBI CHAKRAAnarockCommunications TodayDeccan Herald

Crisil expects about three quarters of the roughly 6 GW now upcoming to sit in Visakhapatnam, Mumbai and Hyderabad, and the hyperscaler share of leased capacity to rise from 60 to 65% in FY26 to 75 to 80% by FY30. Crisil also reports that contract tenors have lengthened to 15 to 20 years.Deccan Herald

Where India’s data centres are: capacity by city

Mumbai and Navi Mumbai held 890 MW, about half of India’s operational data centre capacity, in H1 2026, according to Cushman & Wakefield. Chennai was second with 214 MW, followed by Delhi NCR, Bengaluru, Hyderabad, Pune and Kolkata.Cushman & Wakefield

CityOperational MW (H1 2026)Share of operationalShare of upcomingColocation vacancy
Mumbai and Navi Mumbai89050%45%7.9%
Chennai21412%9%26.7%
Delhi NCR18310%10%10.9%
Bengaluru1629%3%28.0%
Hyderabad1518%18%28.0%
Pune1337%7%22.1%
Kolkata222%2%19.4%
Cushman & Wakefield

Mumbai has 13 cable landing stations, with two more due in 2026, and its Thane-Belapur Road cluster alone holds 675 MW in operation. Hyderabad has the second-largest share of upcoming supply. Cushman & Wakefield maps more than 4 GW of early-stage or announced capacity at Visakhapatnam and more than 1 GW at Jamnagar in Gujarat.Cushman & WakefieldInvest India and Cushman & Wakefield

Largest data centre operators in India

NTT had the largest share of India’s data centre market in H1 2026, according to Anarock. Its operator shares for the half: NTT 21%, Sify 19%, STT GDC 19%, Nxtra (Airtel) 15%, CtrlS 15%, Yotta 5%, Princeton Digital 3%, Iron Mountain (Web Werks) 2% and AdaniConneX 1%. Hyperscalers also build their own campuses.Anarock

CommitmentAmountAnnounced
Google AI hub, Visakhapatnam (gigawatt-scale)About US$15 bn over 2026 to 203014 October 2025
Microsoft, cloud and AI infrastructure, skilling and operationsUS$17.5 bn over 2026 to 20299 December 2025
Amazon, all India businesses (includes US$13 bn added for AI and cloud infrastructure)US$48 bn for 2026 to 203025 June 2026
GoogleMicrosoftAmazon

Data centre policy in India: national, tax and state rules

India has no notified national data centre policy. MeitY issued a draft in November 2020 that was never notified, and revived consultations in August 2025. On 14 October 2026 NITI Aayog released a Data Centre Evaluation Framework, described as a guidance document, that asks each state to publish a data centre approval matrix and bring clearances onto one digital interface.S&R AssociatesBW Legal WorldMediaNama

  • Infrastructure status: data centres of at least 5 MW IT load were added to the Harmonised Master List under Communication on 11 October 2022; Anarock says the status has improved access to long-tenor financing.
  • Tax: Budget 2026-27, enacted through the Finance Act 2026, exempts foreign cloud companies from tax from tax year 2026-27 to 2046-47 on income from serving global customers using Indian data centre services; a 15% cost safe harbour applies where the Indian provider is related.
  • States: as of September 2026, 11 states had dedicated data centre policies in force. Priority incentives include land concessions, stamp duty and electricity duty exemptions and single-window facilitation.
Ministry of Finance, Department of Economic AffairsAnarockPIB, Ministry of Electronics and ITPIBS&R AssociatesInvest India and Cushman & Wakefield

Data localisation rules also drive demand: RBI requires payment system data to be stored only in India (2018); SEBI requires regulated entities’ cloud data to stay within India (2023); CERT-In requires 180 days of logs kept in India and five years of subscriber records from data centres (2022); and the DPDP Rules 2025, notified in November 2025 with an 18-month phased compliance timeline, require significant data fiduciaries to comply with government-specified restrictions on certain data, including localisation where required.Reserve Bank of IndiaSEBICERT-InPIB, Ministry of Electronics and IT

How India’s data centres get power

Data centre capacity is less than 1% of India’s installed power capacity, the government told Parliament in August 2026, but the Central Electricity Authority puts data centre power demand at about 17 GW by 2031-32. Locally the numbers are already large: Crisil estimates that by FY2030 data centre capacity could equal about 60% of Mumbai’s current peak demand and about 80% of Visakhapatnam’s.PIB, Ministry of Electronics and ITDeccan Herald

Structure Research reports that MSEDCL has allocated about 6 GW of grid capacity to data centres in Navi Mumbai and that committed and under-construction capacity is approaching that threshold, pushing new builds to Panvel, Taloja and Rasayani, where separate substation infrastructure can be commissioned. For a site buyer, the document behind the MW and the date of the connection matter more than distance to a line.Structure Research

Data centre construction cost, rents and land prices in India

Building a data centre in India costs US$7.4 million per MW on Cushman & Wakefield’s benchmark, about 23% below Malaysia, and the firm uses US$9.0 million per MW for incremental AI capacity. SBI’s sector report gives ₹50 to 55 crore per MW for an air-cooled Tier III, non-AI build and up to ₹75 crore for AI facilities with immersion cooling or Tier IV.Invest India and Cushman & WakefieldSBI CHAKRA

Wholesale colocation for 5 MW and above was quoted at ₹6,000 to 7,500 per kW per month in Mumbai in H1 2025, Cushman & Wakefield’s latest rent table (its H1 2026 report has none). Anarock puts land for 100 to 500 MW parks at ₹3 to 10 crore per acre and for small suburban Mumbai sites at ₹35 to 60 crore.Cushman & WakefieldAnarock

AI data centres and GPUs in India

India’s IndiaAI Mission had onboarded more than 38,000 GPUs, offered at ₹65 per hour, by February 2026. Announced AI campuses include Google’s AI hub in Visakhapatnam, Reliance’s multi-gigawatt build at Jamnagar and TCS HyperVault, whose first customer is OpenAI. Anarock puts an Nvidia H100 GPU cluster at 30 to 60 kW per rack against 8 to 10 kW traditionally.PIBGoogleTechCrunchTechCrunchAnarock

How Invariant helps

For a site or a shortlist in India, Invariant checks how the site gets power (the discom or transmission connection, the open access route and the nearest substations), screens seismic zone, flood history, groundwater status and airport height limits, and maps the central and state approvals the project needs with the authority behind each. Send the state, the MW and the date you need power.

More on data centres in India

Questions that come up.

How many data centres are there in India?

India had 147 operational data centres in its top seven cities in H1 2026, run by 33 operators, according to Cushman & Wakefield. Anarock counted 164 operational data centres. By capacity, India had about 1.6 to 1.8 GW live in mid-2026.Cushman & WakefieldAnarockJLL

What is the total data centre capacity in India in 2026?

Estimates run from about 1,575 MW (government, August 2026) to 1,819 MW of IT load (Savills, H1 2026). Cushman & Wakefield counts 1,789 MW across the top seven cities in H1 2026, and CBRE expects 2 GW by the end of 2026.PIB, Ministry of Electronics and ITCushman & WakefieldCommunications TodayIBEF

How much data centre capacity is under construction in India?

Cushman & Wakefield counted 509 MW under construction in H1 2026, with 3,351 MW more planned to 2030, or 3,860 MW upcoming in total. Mumbai has 45% of the upcoming supply and Hyderabad 18%.Cushman & Wakefield

Which city has the most data centres in India?

Mumbai has the most, with 890 MW in H1 2026, about half of the operational capacity in India’s top seven cities, most of it in Navi Mumbai along Thane-Belapur Road. Chennai is second with 214 MW.Cushman & Wakefield

Which state has the most data centres in India?

Maharashtra: Mumbai (50%) and Pune (7%) together hold more than half of the operational capacity in India’s top seven cities on Cushman & Wakefield’s H1 2026 count. Chennai in Tamil Nadu is next at 12%. For pipeline, Hyderabad has the second-largest share of upcoming supply (18%), and more than 4 GW of early-stage or announced capacity is mapped at Visakhapatnam in Andhra Pradesh.Cushman & WakefieldInvest India and Cushman & Wakefield

Does India have a national data centre policy?

India has no notified national data centre policy. MeitY’s 2020 draft was never notified and consultations were revived in August 2025. National measures in force include infrastructure status for data centres of 5 MW IT load or more (2022) and the Budget 2026-27 tax holiday for foreign cloud firms using Indian data centres, enacted through the Finance Act 2026.S&R AssociatesBW Legal WorldMinistry of Finance, Department of Economic AffairsPIB, Ministry of Electronics and IT

How much electricity will Indian data centres need?

About 17 GW by 2031-32, according to the Central Electricity Authority’s estimate of data centre power demand. Current data centre capacity is less than 1% of India’s installed power capacity.PIB, Ministry of Electronics and IT

How much does it cost to build a data center in India per MW?

About US$7.4 million per MW on Cushman & Wakefield’s benchmark, which excludes land. SBI’s sector report gives ₹50 to 55 crore per MW for an air-cooled Tier III build and up to ₹75 crore for AI or Tier IV builds.Invest India and Cushman & WakefieldSBI CHAKRA

Who are the largest data centre operators in India?

NTT had the largest share in H1 2026 at 21%, according to Anarock, followed by Sify and STT GDC at 19% each and Nxtra (Airtel) and CtrlS at 15% each. Hyperscalers also build their own campuses.Anarock

What are the largest data centre projects in India?

Announced gigawatt-scale campuses include Google’s AI hub in Visakhapatnam (about US$15 billion over 2026 to 2030) and Reliance’s multi-gigawatt build at Jamnagar. Cushman & Wakefield maps more than 4 GW of early-stage or announced capacity in Visakhapatnam alone.GoogleTechCrunchInvest India and Cushman & Wakefield

Sources and references.

Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. PIB, Ministry of Electronics and ITInstalled data centre capacity and CEA demand estimate (Rajya Sabha reply, 7 August 2026) ↗
  2. Cushman & WakefieldIndia Data Centre Market Overview H1 2026 ↗
  3. Invest India and Cushman & WakefieldIndia's Data Centre Growth Story (October 2026) ↗
  4. JLLIndia data centres, 2026 mid-year report ↗
  5. IBEFIndia likely to add more than 200 MW in H2 2026, pushing total capacity to 2 GW (CBRE) ↗
  6. Communications TodayIndia's data centre capacity additions jump 59% in H1 2026 (Savills) ↗
  7. AnarockData Centre: The Blueprint of the Digital Fortress in India (2026) ↗
  8. SBI CHAKRAData Centres in India, sector report (April 2026) ↗
  9. Ministry of Finance, Department of Economic AffairsHarmonised Master List of Infrastructure Sub-sectors, notification of 11 October 2022 ↗
  10. PIB, Ministry of Electronics and ITBudget 2026-27: tax holiday for foreign cloud companies using Indian data centres ↗
  11. Reserve Bank of IndiaStorage of payment system data (6 April 2018) ↗
  12. SEBIFramework for adoption of cloud services by SEBI regulated entities (6 March 2023) ↗
  13. CERT-InDirections under section 70B(6) of the IT Act (28 April 2022) ↗
  14. PIB, Ministry of Electronics and ITDPDP Rules 2025 notified (14 November 2025) ↗
  15. Structure ResearchMumbai and Pune data centre report 2026 ↗
  16. PIBDemocratising AI in India (10 February 2026) ↗
  17. Cushman & WakefieldIndia Data Centre Market Overview H1 2025 (rent tables) ↗
  18. GoogleOur first AI hub in India, powered by a $15 billion investment ↗
  19. MicrosoftMicrosoft invests US$17.5 billion in India ↗
  20. AmazonAmazon India investment (US$48 billion for 2026 to 2030) ↗
  21. MediaNamaNITI Aayog and MeitY data centre evaluation framework ↗
  22. S&R AssociatesIndian Budget 2026-27: tax incentives for data centres ↗
  23. PIBBudget 2026-27 backgrounder on the data centre tax holiday (14 February 2026) ↗
  24. MediaNamaMeitY tells parliamentary panel it maintains no data centre capacity data ↗
  25. BW Legal WorldMeitY resumes national data centre policy talks ↗
  26. TechCrunchReliance unveils $110B AI investment plan ↗
  27. TechCrunchOpenAI taps Tata for 100 MW AI data center capacity in India, eyes 1 GW ↗
  28. Deccan HeraldIndia set for five times surge in its data centre capacity by 2030 (Crisil Ratings) ↗