Hyderabad had 151 MW of operational data centre capacity in H1 2026 and India’s second-largest pipeline after Mumbai, with AWS and Microsoft cloud regions.

Hyderabad had 151 MW of operational data centre capacity in H1 2026, about 8% of India’s top seven cities, according to Cushman & Wakefield. The same count gives Hyderabad 668 MW planned and 18% of all upcoming supply to 2030, the second-largest pipeline after Mumbai. AWS launched its Hyderabad region in November 2022 and has started a greenfield campus at Bharat Future City, and Microsoft launched its India South Central region in Hyderabad on 21 September 2026. Telangana adopted a dedicated data centre policy in 2016, and officials have cited about 5 GW by 2029 or 2030.

Before you start

  • Hyderabad had 151 MW operational, 42 MW under construction and 668 MW planned in H1 2026 (Cushman & Wakefield).
  • South Hyderabad holds 92 MW at 0% colocation vacancy, with 1,758 MW at early stage; West Hyderabad holds 59 MW (Cushman & Wakefield, H1 2026).
  • Knight Frank puts the committed and early-stage pipeline at about 1.9 GW and says AWS holds 46% of live IT capacity.
  • Hyderabad is Seismic Zone II, the lowest zone in the IS 1893 (Part 1):2002 scheme. The main recent hazard event was the October 2020 flood, when Greater Hyderabad recorded 324 mm of rain in 24 hours (Times of India).

Hyderabad data centre market: key facts (H1 2026)

ItemFigure and period
Operational capacity151 MW, about 8% of top seven cities (Cushman & Wakefield, H1 2026); 151.4 MW at end 2025 (Knight Frank)
Under construction and planned42 MW under construction; 668 MW planned (Cushman & Wakefield)
Share of upcoming supply18% of 3,860 MW in the top seven cities to 2030, second to Mumbai (Cushman & Wakefield)
Colocation vacancy28.0% (Cushman & Wakefield, H1 2026); 23% average in 2025 (Knight Frank)
Hyperscale regionsAWS Asia Pacific (Hyderabad), launched 22 November 2022; Microsoft India South Central, launched 21 September 2026
State policyDedicated data centre policy since 2016 (Cushman & Wakefield); about 5 GW by 2029 (Deccan Chronicle) or 2030 (Commissioner of Industries, ANI)
Grid noteCrisil Ratings: data centre capacity could equal about 20% of Hyderabad’s current peak demand by fiscal 2030
Physical risk noteSeismic Zone II (IS 1893 Part 1:2002); October 2020 floods
Cushman & WakefieldTelangana TodayAmazonMicrosoftCushman & WakefieldANIDeccan ChronicleDeccan HeraldBureau of Indian StandardsThe Times of India

Hyderabad capacity baselines differ. Cushman & Wakefield and Knight Frank both put the city at about 151 MW. Deccan Chronicle reported the state government citing 300 MW operating across its hyperscale and AI infrastructure ecosystem, a figure on a different basis.Cushman & WakefieldTelangana TodayDeccan Chronicle

Hyderabad data centre sub-markets: the southern ORR belt, HITEC City and Bharat Future City

Sub-marketOperationalVacancyPipeline
South Hyderabad92 MW in 3 data centres0.0%39 MW under construction, 634 MW planned, 1,758 MW early stage
West Hyderabad59 MW in 8 data centres28.0%3 MW under construction, 34 MW planned
Cushman & Wakefield

Anarock calls the southern outer ring road belt through Maheshwaram, Shamshabad and Tukkuguda the primary hyperscale growth corridor, and HITEC City and Gachibowli the established enterprise and colocation hub, where land scarcity is driving multi-storey builds. CtrlS plans a 40-acre park at Chandanvelly Industrial Park with over 600 MW of potential IT load and 250 MW of sanctioned power for phase one.AnarockCtrlS

Anarock names Kongara Kalan and Bharat Future City as the next-generation expansion zone. Cushman & Wakefield reports that AWS has started a greenfield data centre at Bharat Future City, expected live in 2028, and ThePrint reported that the state allocated 202 acres in Bharat Future City and 98 acres in Chandanvelly to Amazon.AnarockCushman & WakefieldThePrint

Power for Hyderabad data centres: Telangana supply rules and tariffs

Crisil Ratings estimates that by fiscal 2030 data centre capacity in Hyderabad could equal about 20% of the city’s current peak power demand, a third of the share it projects for Mumbai. CtrlS reports 250 MW of sanctioned power for the first phase of its Chandanvelly park, an example of the document a buyer should ask to see.Deccan HeraldCtrlS

Telangana’s supply rules put contracted demand above 10,000 kVA on a common feeder, or above 20,000 kVA on a dedicated feeder, at 132 kV or above. Supply at 132 kV or above is through a dedicated feeder or a loop-in loop-out arrangement decided by TS Transco, and a consumer on a dedicated feeder pays the full cost of the service line. HT industrial supply at 132 kV and above was Rs 6.65 per kVAh with a Rs 500 per kVA monthly demand charge in the FY 2024-25 order; The Hans India reported no tariff hike for 2026-27.Telangana Electricity Regulatory CommissionTelangana Electricity Regulatory CommissionThe Hans India

Cushman & Wakefield notes that Telangana was the first state to implement a dedicated data centre policy, in 2016. ThePrint reported that the state’s land allocations to Amazon came with incentives worth Rs 125 crore.Cushman & WakefieldThePrint

Data centre site risks in Hyderabad

  • Seismic: Hyderabad is Zone II (zone factor 0.10) in the IS 1893 (Part 1):2002 town list, the lowest zone in that scheme.
  • Flood: on 13 October 2020 Greater Hyderabad and its outskirts recorded 324 mm of rain in 24 hours, per the Times of India. A state minister said 33 people died in the GHMC and adjoining areas. Low-lying plots need a drainage check.
  • Groundwater: under CGWA guidelines, new industries other than MSMEs cannot get groundwater NOCs in over-exploited assessment units. Check the specific unit before relying on borewells.
  • Airport: Anarock cites airport proximity as an advantage of the southern corridor. AAI height NOCs apply up to 20 km from VFR airports and 56 km from IFR airports.
Bureau of Indian StandardsThe Times of IndiaThe Times of IndiaCentral Ground Water Authority, Ministry of Jal ShaktiAnarockAirports Authority of India

Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Hyderabad the questions are which substation serves the corridor, what is already allocated on it, and the height surface over the plot.

More on data centres in India

Questions that come up.

How much data centre capacity does Hyderabad have?

Hyderabad had 151 MW of operational data centre capacity in H1 2026, according to Cushman & Wakefield, with 42 MW under construction and 668 MW planned. Knight Frank put the committed and early-stage pipeline at about 1.9 GW.Cushman & WakefieldTelangana Today

Where are the data centres in Hyderabad?

Hyderabad’s data centres sit in two Cushman & Wakefield sub-markets, South Hyderabad (92 MW) and West Hyderabad (59 MW). Anarock names the southern ORR belt through Maheshwaram, Shamshabad and Tukkuguda as the main hyperscale corridor and HITEC City and Gachibowli as the established hub.Cushman & WakefieldAnarock

Which hyperscalers have data centres in Hyderabad?

AWS launched its Hyderabad region in November 2022, and Microsoft launched its India South Central region in Hyderabad on 21 September 2026. Knight Frank says AWS holds 46% of live IT capacity.AmazonMicrosoftTelangana Today

Does Telangana have a data center policy?

Telangana was the first state to implement a dedicated data centre policy, in 2016, according to Cushman & Wakefield. Officials have cited about 5 GW of capacity by 2029 or 2030.Cushman & WakefieldANIDeccan Chronicle

What is the earthquake risk for a data centre in Hyderabad?

Hyderabad is Seismic Zone II in the IS 1893 (Part 1):2002 town list, the lowest zone in that scheme. Flood drainage is the more relevant site check, given the October 2020 floods.Bureau of Indian StandardsThe Times of India

Sources and references.

Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. Cushman & WakefieldIndia Data Centre Market Overview H1 2026 ↗
  2. Cushman & WakefieldIndia Data Center Market Overview H1 2025 ↗
  3. Telangana TodayHyderabad emerges as India’s fast-growing hyperscale data centre hub (Knight Frank) ↗
  4. AmazonAWS launches second infrastructure region in India ↗
  5. MicrosoftMicrosoft establishes India South Central region as a strategic hub ↗
  6. ANIHyderabad emerging as major AI data centre hub: Telangana official ↗
  7. Deccan ChronicleTelangana targets 5 GW data centre capacity by 2029 as Microsoft opens Hyderabad region ↗
  8. Deccan HeraldIndia set for five times surge in its data centre capacity by 2030 (Crisil Ratings) ↗
  9. Bureau of Indian StandardsIS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors ↗
  10. The Times of IndiaAt 324 mm, Greater Hyderabad scores one-day maximum after 20 years ↗
  11. The Times of IndiaTelangana rains: death toll goes up to 70 ↗
  12. AnarockData Centre: The Blueprint of the Digital Fortress in India (2026) ↗
  13. CtrlSCtrlS unveils plans for new data center park on 40-acre land parcel near Hyderabad ↗
  14. Telangana Electricity Regulatory CommissionGTCS amendment: voltage of supply by contracted demand (19 October 2022) ↗
  15. Telangana Electricity Regulatory CommissionRetail supply tariff order FY 2024-25 (28 October 2024) ↗
  16. The Hans IndiaNo power tariff hike for 2026-27: TGERC ↗
  17. ThePrintTelangana secures Amazon’s biggest India data centre project ↗
  18. Central Ground Water Authority, Ministry of Jal ShaktiGuidelines to regulate and control ground water extraction in India (24 September 2020) ↗
  19. Airports Authority of IndiaNOCAS frequently asked questions (height clearance under GSR 751(E)) ↗