Visakhapatnam has more than 4 GW of early-stage or announced data centre capacity, according to Invest India and Cushman & Wakefield (October 2026). Google committed about US$15 billion over 2026 to 2030 for its first India AI hub in the city, with AdaniConneX and Nxtra by Airtel, and broke ground at Tarluvada on 28 April 2026. Digital Connexion (1 GW), Colt DCS with RMZ (1.25 GW) and AirTrunk (up to 1.8 GW across two proposed campuses) have announced or proposed large developments. Crisil estimates that by FY2030 data centre capacity in Visakhapatnam could equal about 80% of the city’s current peak power demand.
Before you start
- Announced in and around Visakhapatnam: Google (about US$15 billion, about 1 GW), Digital Connexion (about US$11 billion, 1 GW), Colt DCS and RMZ (1.25 GW, about US$21 billion), AirTrunk (up to 1.8 GW in Anakapalli, proposed).
- Crisil estimates that by FY2030 data centre capacity in Visakhapatnam could equal about 80% of the city’s current peak power demand.
- Andhra Pradesh Data Center Policy 4.0 (2024-29) gives large projects project-specific packages through government orders; the state issued orders for specific projects in 2026.
- Cyclone Hudhud crossed the coast over Visakhapatnam on 12 October 2014 with winds of about 180 km/h and a 1.4 m storm surge.
- New subsea routes into Visakhapatnam: Google’s America-India Connect gateway (announced February 2026) and Sify’s open cable landing station.
Visakhapatnam data centre market: key facts (2026)
| Item | Figure and period |
|---|---|
| Announced capacity | More than 4 GW at early or announced stage (Invest India and Cushman & Wakefield, October 2026) |
| Largest project | Google AI hub, about US$15 billion over 2026 to 2030, groundbreaking 28 April 2026 |
| Grid note | Data centre capacity could equal about 80% of the city’s current peak demand by FY2030 (Crisil) |
| State policy | Andhra Pradesh Data Center Policy 4.0 (2024-29), notified 14 November 2024 according to TeamLease RegTech |
| Cables | Google America-India Connect gateway (announced February 2026); Sify open cable landing station (foundation stone October 2025); Airtel cites a next-generation cable landing station as part of its role in the Google hub |
| Physical risk note | Seismic Zone II; Cyclone Hudhud landfall on 12 October 2014 |
Data centre projects announced in and around Visakhapatnam
| Developer | Scale | Where | Status and date |
|---|---|---|---|
| Google with AdaniConneX and Nxtra by Airtel | Gigawatt-scale, three data centre campuses; about US$15 billion over 2026 to 2030 | Groundbreaking at Tarluvada | Announced 14 October 2025; groundbreaking 28 April 2026 |
| Digital Connexion (Reliance, Brookfield, Digital Realty) | 1 GW; about US$11 billion by 2030 | 400-acre campus | MoU with the AP Economic Development Board, announced November 2025 |
| Colt DCS and RMZ | 1.25 GW; about US$21 billion over the next decade | Visakhapatnam | Announced (Cushman & Wakefield, H1 2026) |
| AirTrunk | Up to 1.8 GW; about US$11 billion | Two campuses in Anakapalli district | Project reports submitted, reported November 2026 (IREI, citing Bloomberg); subject to government approval |
| Sify | 50 MW AI edge data centre and open cable landing station; Rs 1,500 crore | 3.6 acres | Foundation stone 12 October 2025 |
Andhra Pradesh also issued government orders under Policy 4.0 for specific projects in 2026, including ReNew’s 1,000 MW at Makavaripalem in Anakapalli district and AM AI Factory’s 512 MW at Amanam village. ETV Bharat reported that incentives for Google’s subsidiary Raiden Infotech are capped at Rs 22,000 crore against Rs 87,520 crore of investment, including a 25% discount on 480 acres of land.MediaNamaETV Bharat
Grid power for Visakhapatnam data centres
Crisil estimates that data centre capacity could equal about 80% of Visakhapatnam’s current peak demand by FY2030, and says this makes timely grid connectivity and transmission augmentation critical. A site in Vizag therefore needs evidence of which transmission scheme serves it and when, not only a state MoU.DD India
Andhra Pradesh grants incentives for large data centre projects one by one, through government orders. Read the project order; the policy text alone does not tell you what a given site gets.MediaNama
Disadvantages and risks of a data centre in Vizag
- Cyclone: Hudhud crossed the coast over Visakhapatnam on 12 October 2014 with maximum sustained winds of about 180 km/h, central pressure of 950 hPa and a 1.4 m storm surge at the Visakhapatnam tide gauge. Design for wind loads and plan for grid outages after landfall.
- Water: check the groundwater category of the assessment unit before planning evaporative cooling; nationally, 10.8% of assessment units were over-exploited in the 2025 assessment.
- Market depth: Invest India and Cushman & Wakefield map Visakhapatnam’s capacity as early-stage or announced, so early tenants depend on the hyperscale anchors.
- Seismic: Visakhapatnam is Zone II (zone factor 0.10), a low design load.
Invariant checks the evidence behind a site’s power (the DISCOM or transmission connection, the open access route, the nearest substations and what else is queued on them), screens seismic zone, flood history, groundwater status and airport height limits, and lists the central and state approvals the project needs with the authority behind each one. In Vizag the questions are which transmission scheme and substation serve the plot, the cyclone design basis, and the water source.
Subsea cable landings in Visakhapatnam
Google’s America-India Connect, announced on 18 February 2026, includes a new international subsea gateway in Visakhapatnam, a direct path from Vizag and Chennai to South Africa, and a direct path between Vizag and Singapore. At the Google groundbreaking, Airtel cited a next-generation cable landing station as part of what it brings to the Vizag hub, and Sify is building an open cable landing station alongside its 50 MW AI edge data centre.GoogleAdani GroupThePrint (PTI)
More on data centres in India
Questions that come up.
Which companies are building data centres in Visakhapatnam?
Google (with AdaniConneX and Nxtra by Airtel), Digital Connexion, Colt DCS with RMZ, Sify and AirTrunk have announced or proposed data centres in and around Visakhapatnam. Digital Connexion is backed by Reliance, Brookfield and Digital Realty; AirTrunk has submitted project reports for Anakapalli, according to IREI.GoogleAdani GroupBusiness TodayCushman & WakefieldThePrint (PTI)IREI
How much data centre capacity is planned in Visakhapatnam?
More than 4 GW of data centre capacity in Visakhapatnam is at early or announced stage, according to Invest India and Cushman & Wakefield (October 2026).Invest India and Cushman & Wakefield
How big is Google’s data centre in Vizag?
Google committed about US$15 billion over 2026 to 2030 for its India AI hub in Visakhapatnam, which comprises three data centre campuses. The Adani Group described nearly 1 GW in a single location at the groundbreaking on 28 April 2026.GoogleAdani Group
What are the disadvantages of a data center in Vizag?
The disadvantages are cyclone exposure (Hudhud in 2014), power build-out relative to the city’s demand, water for cooling, and a market still at early or announced stage.India Meteorological DepartmentDD IndiaInvest India and Cushman & Wakefield
Does Andhra Pradesh have a data centre policy?
Yes. Andhra Pradesh Data Center Policy 4.0 (2024-29), notified on 14 November 2024 according to TeamLease RegTech. Large projects receive project-specific incentives through government orders.TeamLease RegTechMediaNama
Sources and references.
Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.
- Invest India and Cushman & WakefieldIndia's Data Centre Growth Story (October 2026) ↗
- GoogleOur first AI hub in India, powered by a $15 billion investment ↗
- Adani GroupGoogle breaks ground on India AI hub ↗
- DD IndiaIndia’s data centre capacity set for 5x surge by 2030 (Crisil Ratings) ↗
- TeamLease RegTechAndhra Pradesh Data Center Policy (4.0) 2024-29 ↗
- GoogleAnnouncing America-India Connect and new investments to advance global AI access ↗
- ThePrint (PTI)Andhra minister Nara Lokesh lays foundation for Sify’s Rs 1,500 cr AI edge data center in Vizag ↗
- Bureau of Indian StandardsIS 1893 (Part 1):2002, criteria for earthquake resistant design, Annex E zone factors ↗
- India Meteorological DepartmentVery Severe Cyclonic Storm Hudhud: a report ↗
- Business TodayReliance, Brookfield, Digital Realty JV to invest $11 billion in Andhra Pradesh for 1 GW data centre ↗
- Cushman & WakefieldIndia Data Centre Market Overview H1 2026 ↗
- IREIBlackstone-backed AirTrunk advances $11B India data center development plans ↗
- MediaNamaAndhra Pradesh clears AI data centre projects under Policy 4.0 ↗
- ETV BharatAndhra Pradesh offers Rs 22,000 crore incentives to Google’s Raiden Infotech for data centres ↗
- Press Information Bureau (Ministry of Jal Shakti)Dynamic Ground Water Resources Assessment 2025 ↗