Power for data centres in India: grid supply, open access and tariffs by state

How data centres in India buy power: discom supply, green open access from 100 kW, captive plants, and state tariffs such as Tamil Nadu’s ₹7.50/kWh plus ₹608/kVA.

A data centre in India buys power from the state distribution company (discom), and under the state supply codes a load above about 10 MVA connects at 110 kV to 230 kV. Renewable power can be added through green energy open access, from 100 kW, or from captive plants, and a bulk consumer of 50 MW or more can connect directly to the inter-state grid. Tariffs differ by state: Tamil Nadu charged ₹7.50/kWh plus ₹608/kVA a month from July 2025, and Uttar Pradesh ₹6.10 to ₹7.10/kVAh for 2026-27. The binding question for a site is rarely the tariff: it is whether the substation and line can deliver the MW, and by when.

Before you start

  • A data centre in India has three power routes: discom supply at high or extra high voltage, green energy open access from 100 kW under the 2022 rules, and captive or group captive generation with 26% ownership and 51% consumption.
  • Maharashtra’s MERC tariff order names data centres as industrial; Tamil Nadu bills them as IT services under HT-I; Uttar Pradesh covers notified IT units under HV-2.
  • Under each state’s supply code, load above 10 MVA usually moves to 110 kV, 132 kV or 220 kV supply from a transmission substation.
  • TNERC’s order T.O. 6 of 2025 set ₹7.50/kWh plus ₹608/kVA a month for Tamil Nadu’s HT-I category, which covers data centres, from 1 July 2025.
  • The Central Electricity Authority estimates data centre demand of about 17 GW by 2031-32, according to the government’s reply to the Rajya Sabha.

The three ways a data centre in India buys power

RouteWhat it isMain ruleWhat it adds to cost
Discom supplySupply from the state distribution licensee at HT or EHVState supply code and the commission’s tariff orderDemand charge per kVA plus energy charge per kWh or kVAh, electricity duty, fuel adjustment
Green energy open accessRenewable power bought from a generator or trader and wheeled over the gridGreen Energy Open Access Rules 2022: from 100 kW contracted demandTransmission, wheeling, cross subsidy surcharge, standby and banking charges
Captive or group captiveGeneration the consumer part-ownsElectricity Rules 2005, Rule 3, as amended in March 2026: at least 26% ownership and 51% consumptionNo cross subsidy or additional surcharge if the tests are met
Ministry of Power (gazette copy)Ministry of Power (gazette copy via REC Registry)PIB, Ministry of Powerpv magazine India

Most campuses combine the first route with one of the others: the discom supplies the connection, standby and balance, while open access or captive plants provide renewable energy. A bulk consumer of 50 MW or more may instead connect directly to the inter-state transmission system under CERC’s General Network Access regulations.Central Electricity Regulatory Commission

Data centre connection voltage by state

Each Indian state’s supply code ties a data centre’s connection voltage to its contract demand, so a 20 MW hall and a 200 MW campus connect at different voltages.

StateUp to about 10 MVAAbove 10 MVALargest loads
Maharashtra11 kV to 3 MVA, 22 kV to 7.5 MVA, 33 kV to 10 MVA (higher limits in metro areas)Extra high voltage above the 22 and 33 kV limitsEHV from a transmission substation
Tamil Nadu11 or 22 kV to 3 or 5 MVA; 33 kV to 10 MVA110 kV from 10 to 50 MVA230 kV above 50 MVA
Telangana11 kV or 33 kV by feeder type (132 kV also allowed from 5 MVA on a common feeder)132 kV or above beyond 10 MVA on a common feeder or 20 MVA on a dedicated one132 kV or above, dedicated feeder or LILO
Uttar Pradesh11 kV to 3 MVA; 33 kV to 10 MVA132 or 220 kV above 10 MVA220 kV feeder from a 220 or 400 kV substation on request, if the licensee considers it essential
Maharashtra Electricity Regulatory CommissionTNPDCLTelangana Electricity Regulatory CommissionDakshinanchal Vidyut Vitran Nigam

Electricity tariffs for data centres by state

Each state commission sets data centre tariffs in its retail supply tariff order; the table gives the published rates for the category each state uses for data centres, before fuel adjustment, electricity duty, time-of-day terms and taxes. Units follow each order: some bill energy per kWh, others per kVAh.

StateCategory for data centresDemand chargeEnergy chargeOrder
Tamil Nadu (TNPDCL)HT-I, which covers IT services including data centres₹608/kVA a month₹7.50/kWhTNERC T.O. 6 of 2025, from 1 July 2025
Uttar Pradesh (UPPCL discoms)HV-2 Large and Heavy Power, for IT units notified by the stateUrban ₹300 (up to 11 kV) to ₹270 (above 66 kV) per kVA a month₹7.10 (up to 11 kV), ₹6.80, ₹6.40, ₹6.10/kVAh (above 132 kV)UPERC order FY 2026-27, 2 July 2026
Telangana (TGSPDCL, TGNPDCL)HT-I(A) Industry (General); we did not confirm that data centres are billed in it₹500/kVA a month₹7.65 (11 kV), ₹7.15 (33 kV), ₹6.65/kVAh (132 kV and above)TGERC order FY 2024-25 (28 October 2024); no tariff hike announced for FY 2026-27, per The Hans India
Maharashtra (MSEDCL)HT I(A) Industry, which names data centres₹555/kVA a month in the March 2025 multi-year order, since revised₹7.48/kVAh at EHV in the March 2025 multi-year order, since revisedMERC Case 217 of 2024, then review orders; rate in force not confirmed
Gujarat (one licensee)HTP-I, for HT purposes not covered by another HT category₹150 to ₹475/kVA a month by slab400 to 430 paise per unit by demand slab, plus fuel adjustmentGERC order for AspenPark Infra Vadodara, 25 March 2026
Tamil Nadu Electricity Regulatory CommissionUttar Pradesh Electricity Regulatory CommissionTelangana Electricity Regulatory CommissionThe Hans IndiaMaharashtra Electricity Regulatory CommissionGujarat Electricity Regulatory Commission

MERC revised Maharashtra’s rates in a review order of 25 June 2025, to ₹600/kVA and ₹8.68/kVAh at EHV from 1 July 2025. We have not confirmed whether later orders changed these rates, so check the rate in force with MSEDCL before using any of these figures. The Gujarat row is from one small licensee’s order; we did not confirm that the state discoms use the same schedule.Maharashtra Electricity Regulatory CommissionGujarat Electricity Regulatory Commission

We have not verified current tariffs for Karnataka, Andhra Pradesh, Haryana or West Bengal for this guide. For those states, the commission’s latest retail supply tariff order is the source.

States that treat data centres as industrial consumers

  • Maharashtra: MERC classified data centres and semiconductor units as industrial to attract high, continuous loads; industrial incentives apply, and data centres using 100% green power get a 10% discount on wheeling charges.
  • Tamil Nadu: data centres fall under HT-I as IT services, following the state ICT policy definition.
  • Uttar Pradesh: the HV-2 industrial category covers IT and ITeS units the state notifies by policy.
Maharashtra Electricity Regulatory CommissionTamil Nadu Electricity Regulatory CommissionUttar Pradesh Electricity Regulatory Commission

State data centre policies add power incentives on top of the tariff category. Odisha’s 2022 policy exempts electricity duty for 10 years up to 5 MVA and subsidises 30% of the power bill for five years, capped at ₹2 crore. Uttar Pradesh’s 2026 policy exempts electricity duty for 10 years. Gujarat’s 2026-29 policy offers a power tariff subsidy of ₹1 per unit for 20 years to eligible projects of 150 MW or more of IT load.Invest OdishaInvest UPCyril Amarchand Mangaldas

Where grid capacity constrains data centres in India

Data centre capacity is still under 1% of India’s installed power capacity, according to the government, but it is concentrated. Structure Research reports that committed and under-construction data centre capacity in Navi Mumbai is approaching the roughly 6 GW of grid capacity MSEDCL allocated there, pushing new builds towards Panvel, Taloja and Rasayani. Crisil Ratings estimates, as reported by Deccan Herald, that by FY2030 data centre capacity could equal about 60% of Mumbai’s current peak demand and about 80% of Visakhapatnam’s.PIB, Ministry of Electronics and ITStructure ResearchDeccan Herald

The Central Electricity Authority has asked states including Maharashtra, Andhra Pradesh, Telangana and Tamil Nadu to enhance resource adequacy for data centre demand, ThePrint reported in April 2026. The head of TGSPDCL, one of Telangana’s two discoms, told ThePrint that data centres need transmission lines of 132 kV and above.ThePrint

How Invariant helps

For a site or shortlist in India, Invariant checks how the site gets power: the discom or transmission connection, the voltage the load falls under, the nearest substations, the open access or captive route and the document behind the MW. We also screen seismic zone, flood history, groundwater status and airport height limits, and map the central and state approvals with the authority behind each. Send the state, the MW and the date you need power.

More on data centres in India

Questions that come up.

How do data centres in India get electricity?

From the state discom, at a voltage the state supply code sets for the contract demand. Renewable power is often added through green energy open access or captive plants, and bulk consumers of 50 MW or more can also connect directly to the inter-state grid under CERC rules.Ministry of Power (gazette copy)Central Electricity Regulatory Commission

How much does electricity cost a data centre in India?

It depends on the state and tariff category: TNERC set ₹7.50/kWh plus ₹608/kVA a month for Tamil Nadu from July 2025. Uttar Pradesh charges ₹6.10 to ₹7.10/kVAh plus ₹270 to ₹300/kVA for 2026-27, and Telangana’s FY 2024-25 order set ₹6.65 to ₹7.65/kVAh plus ₹500/kVA for HT industry. Fuel adjustment, duty and taxes are extra.Tamil Nadu Electricity Regulatory CommissionUttar Pradesh Electricity Regulatory CommissionTelangana Electricity Regulatory Commission

Are data centres industrial consumers for electricity in India?

In Maharashtra, yes: the MERC tariff order names them as industrial. Tamil Nadu bills them under HT-I as IT services, and Uttar Pradesh under the HV-2 industrial category for notified IT units.Maharashtra Electricity Regulatory CommissionTamil Nadu Electricity Regulatory CommissionUttar Pradesh Electricity Regulatory Commission

Can a data center in India buy renewable power directly?

Yes, through green energy open access or a captive plant. The Green Energy Open Access Rules 2022 allow any consumer with 100 kW or more of contracted demand to buy renewable power through open access, and a captive or group captive plant qualifies if the consumer owns at least 26% and uses at least 51% of the output.Ministry of Power (gazette copy)PIB, Ministry of Powerpv magazine India

How much power will data centres in India need?

About 17 GW by 2031-32, according to the Central Electricity Authority. Data centre capacity today is less than 1% of India’s installed power capacity.PIB, Ministry of Electronics and IT

Sources and references.

Primary sources checked for this guide on . The location, equipment, and operating plan determine which requirements apply to a project.

  1. Ministry of Power (gazette copy)Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules 2022, G.S.R. 418(E) ↗
  2. Ministry of Power (gazette copy via REC Registry)Electricity (Promoting Renewable Energy Through Green Energy Open Access) Amendment Rules 2023, G.S.R. 59(E), 27 January 2023 ↗
  3. PIB, Ministry of PowerElectricity (Amendment) Rules 2026 on captive generation ↗
  4. pv magazine IndiaReforming captive power in India: key changes under the Electricity (Amendment) Rules 2026 ↗
  5. Central Electricity Regulatory CommissionCERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations 2022 ↗
  6. Maharashtra Electricity Regulatory CommissionMERC Electricity Supply Code and Standards of Performance Regulations 2021 ↗
  7. TNPDCLCategories of supply (Tamil Nadu Electricity Supply Code) ↗
  8. Telangana Electricity Regulatory CommissionGTCS amendment on supply voltage by contracted demand (19 October 2022) ↗
  9. Dakshinanchal Vidyut Vitran NigamUP Electricity Supply Code 2005, salient features ↗
  10. Tamil Nadu Electricity Regulatory CommissionTariff Order T.O. 6 of 2025 (30 June 2025) ↗
  11. Uttar Pradesh Electricity Regulatory CommissionTariff order FY 2026-27 for UPPCL distribution companies (2 July 2026) ↗
  12. Telangana Electricity Regulatory CommissionRetail supply tariff order FY 2024-25 (28 October 2024) ↗
  13. The Hans IndiaNo power tariff hike for 2026-27: TGERC ↗
  14. Maharashtra Electricity Regulatory CommissionMSEDCL multi-year tariff order, Case 217 of 2024 (28 March 2025) ↗
  15. Maharashtra Electricity Regulatory CommissionReview order, Case 75 of 2025 (25 June 2025) ↗
  16. Gujarat Electricity Regulatory CommissionTariff order FY 2026-27, AspenPark Infra Vadodara, Case 2591 of 2025 (25 March 2026) ↗
  17. Invest OdishaOdisha State Data Centre Policy 2022 ↗
  18. Invest UPUttar Pradesh Data Centre Policy 2026 ↗
  19. Cyril Amarchand MangaldasGujarat Data Center Policy 2026-2029 ↗
  20. PIB, Ministry of Electronics and ITInstalled data centre capacity and CEA demand estimate (Rajya Sabha reply, 7 August 2026) ↗
  21. Structure ResearchMumbai and Pune data centre report 2026 ↗
  22. Deccan HeraldIndia set for five times surge in its data centre capacity by 2030 (Crisil Ratings report) ↗
  23. ThePrintData centre gold rush risks blackouts, central electricity body warns states ↗